Parking Lot Repair And Striping installed on an unstable surface could quickly lead to problems. There are three Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not showing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 facet is elevation: make certain fences, garage floors, and other structures aren't compromised by the higher degree of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is completely removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Remove the old driveway and secure it into a good surface. This is the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mixture.

The longer asphalt you operate, the more leeway you might have. By way of example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. In general, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix remains practical in this period, but the time is limited.

How much can an Parking Lot Repair And Striping price in Alabaster?

Consider the weather vagaries of our climate when choosing the standard of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it will be good to tell the contractor if you have a recreational vehicle or even a van. He will have to accommodate the asphalt mix so as to be more resistant to the weight of heavy vehicles.

The advantages of Parking Lot Repair And Striping

  • Smooth end;
  • non-slip
  • Simple to maintain
  • watertightness ensured
  • withstands the rigors of the Quebec climate very well (provided it's been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt employed along with the paving contractor.

For a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver can be up to 20 years, when the best conditions are met. We are referring to a professional paving contractor, a great quality of asphalt and also an optimal asphalt laying technique.

Parking Lot Repair And Striping in Alabaster: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly depends on the quality of the laying. Indeed, the significant causes of deformation or tearing of an asphalt coating are the absence of compaction and a lean base. However, the upkeep of the asphalt sidewalk can be a deciding factor in its longevity. That's to say, you'll have to seal your drive once in ten years, at a minimum, so as to maintain its good state.


We advise you to notify your asphalting builder in case you decide to get your driveway asphalt so as to offer your property. It may not be necessary to pay top dollar for placing asphalt , in such a case.

Parking Lot Repair And Striping placing: price and contract

The choice of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, you'll have to choose it carefully.

Our ensures and Parking Lot Repair And Striping work

Make sure the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving contractor cannot demand you to make a deposit before work has started. However, you need to agree to the payment provisions and make sure it's on the contract.

A strong foundation for Parking Lot Repair And Striping- Alabaster

Prior to estimating the asphalt drive to your new home by a contractor, or acquiring some fundamental knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the insufficient depth of the base are the two main sources for the deformation or tearing of a layer of asphalt. When it is a new driveway, it must initially be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be set under the granular backfill if the soil turns out to be very loamy (clayey). If you have a new house, it is best to wait 6 to 12 months prior to paving your drive, to enable the soil to settle naturally. In the case of a repair of this entrance, an easy replacement of the asphalt coating can be considered in the event the contractor considers that the present foundation is sufficient. In both scenarios, foundation redone or base maintained, the duration of its warranty has to be the same.

Parking Lot Repair And Striping Alabaster Alabama

The weather conditions in our beautiful province can have a disastrous impact on an asphalt drive, thus the significance of including a slope having a minimum slope of 2%. This will allow water to drain to the street and decrease the risk of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder before the start of the job: he is going to be able to provide materials so. Some asphalt combinations produce an asphalt which is more immune to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the setup of side supports around the foundation is a fantastic method to avoid potential cracks and this asphalting done in chilly weather will be of poor quality. It's therefore far better to wait for the bright days to return before starting work.

To avoid unpleasant surprises, then choose your contractor and be certain that the name and address of his company are written about the contract. The beginning and finish dates of this work, as well as evidence of the contractor's liability insurance and the technical specifics of this job to be completed, should also be included. No contractor should need a deposit before work starts. To prevent the inconvenience that might lead to unforeseen costs, visit the Parking Lot Repair And StripingAlabaster website. You may thus have all the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Alabaster - Greatest Alabama in Alabama!

For quality asphalting work , phone on Parking Lot Repair And Striping, Alabaster professional team. We've got more than twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company department to figure out the regions served.

Asphalt Alabaster | Concrete Maintenance Alabaster
Home >> alabama/alabaster >> parking lot repair and Striping
Share this...