Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt surface in Anniston, Alabama


Parking Lot Repair And Striping installed on an unstable surface could quickly lead to problems. There are three Chief choices for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing severe cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. One facet is height: make sure fences, garage floors, and other constructions aren't jeopardized by the higher degree of the surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed right on the ground.
  3. Remove the old driveway and fasten it to a good surface. This is the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix.

Our Services:

The best time to install Parking Lot Repair And Striping from Anniston

The more asphalt you operate, the more leeway you have. For example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. Generally, for thin asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to speak to your contractor. The hot mix remains functional in this period of time, but the time is limited.

How much does an Parking Lot Repair And Striping cost in Anniston?

Consider the weather vagaries of the climate when deciding upon the quality of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it'll be useful to distinguish the contractor should you have a recreational vehicle or a van. He will have to adapt the asphalt mix in order to be more resistant to the burden of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

A driveway paved with asphalt has several advantages:

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt used and the paving contractor.

For a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver can be around 20 years, when the very best states are satisfied. We're referring to a professional paving builder, a great quality of asphalt and also an optimal asphalt laying technique.

Parking Lot Repair And Striping in Anniston: cost, quality of work and lifespan


The durability of residential asphalt paving largely depends upon the quality of the laying. Really, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction plus a thin foundation. However, the maintenance of the asphalt pavement is also a deciding factor in its own longevity. That's to say, you'll need to seal your driveway once in 10 years, at a minimum, in order to keep its good condition.


We suggest that you inform your asphalting builder if you decide to get your driveway asphalt in order to offer your property. It may not be necessary to pay top dollar for placing asphalt , in such a case.

Parking Lot Repair And Striping placing: price and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, you'll have to select it carefully.

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

The following details should be included in the contract:

- date of beginning and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to know that a paving contractor can't require you to make a deposit before work has started. However, you need to agree to the payment provisions and make sure it is on the contract.

Before redoing the asphalt drive to your new residence by a contractor, or obtaining some basic knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two chief sources for the deformation or tearing of a coating of asphalt. If it is a new driveway, then it must first be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be set beneath the granular backfill if the soil proves to be somewhat loamy (clayey). If you own a new home, it's ideal to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle . In the case of a repair of this entrance, an easy replacement of the asphalt coating can be considered in the event the contractor believes that the present foundation is adequate. In both scenarios, base redone or foundation preserved, the duration of its warranty must be the same.

Parking Lot Repair And Striping Anniston Alabama

The weather conditions in our beautiful province can have a devastating effect in an asphalt drive, thus the significance of adding a slope with a minimum slope of 2%. This will enable water to drain to the road and decrease the danger of heaving or cracking. This significant detail has to be taken into account when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder before the onset of the work: he will have the ability to supply materials so. Some asphalt combinations produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to reach a thickness of 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the foundation is a good way to prevent potential cracks and that asphalting done in chilly weather will be of poor quality. It is therefore far better to wait for the sunny days to go back before beginning work.

A definite contract with your builder in Anniston

To avoid unpleasant surprises, then select your contractor and make sure that the title and address of the company are written about the contract. The beginning and finish dates of the work, as well as evidence of the contractor's liability insurance and also the technical specifics of this project to be carried out, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that could lead to unforeseen costs, take a look at the Parking Lot Repair And StripingAnniston site. You will thus have the resources in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Anniston - Greatest Alabama at Alabama!

For caliber asphalting work , call on Parking Lot Repair And Striping, Anniston specialist team. We've got over twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business department to find out the regions served.

Asphalt Anniston | Concrete Maintenance Anniston
Home >> alabama/anniston >> parking lot repair and Striping
Share this...