Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Anniston, Alabama


Snow Removal installed on an unstable surface could quickly lead to problems. There are three main options for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than showing serious cracks or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is height: make certain fences, garage floors, and other structures are not compromised by the higher degree of the new surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is completely removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Eliminate the old driveway and secure it to a good surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mixture. Generally 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Snow Removal from Anniston

The longer asphalt you operate, the more leeway you have. For example, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix is ​​still practical in this period of time, but the time is constrained.

How much does an Snow Removal price in Anniston?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt perform.

In addition, it will be useful to tell the contractor should you own a recreational vehicle or a van. He will need to adapt the asphalt mixture so as to be more resistant to the burden of heavy vehicles.

The advantages of Snow Removal

  • Smooth end;
  • non invasive
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it has been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the characteristic of the asphalt used and the paving contractor.

To get a sustainable Snow Removal

The existence of an asphalt paver can be around 20 years, when the best conditions are met. We're referring to a professional paving builder, a good quality of asphalt as well as also an optimal asphalt laying technique.

Snow Removal in Anniston: cost, quality of work and lifespan


The longevity of residential asphalt paving largely depends upon the quality of the laying. Really, the major causes of deformation or tearing of an asphalt coating are the absence of compaction and a thin foundation. However, the maintenance of the asphalt pavement can be a determining factor in its longevity. That's to say, you'll have to seal your driveway once in ten years, at a minimum, in order to keep its good state.


We suggest that you notify your asphalting builder if you choose to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for placing asphalt , in this circumstance.

Snow Removal laying: cost and contract

The option of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you will need to choose it carefully.

Our guarantees and Snow Removal work

Guarantee that the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

These details must be included in the arrangement:

- date of beginning and end of the job;

- evidence of insurance;

- technical details;

- RBQ accreditation number.

You ought to be aware that a paving builder can't require you to make a down payment before work has begun. However, you need to agree to the payment provisions and make sure it's on the contract.

Prior to estimating the asphalt driveway to your new home by a builder, or acquiring some fundamental knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient depth of the base are the two main causes of the deformation or tearing of a coating of asphalt. When it's a new driveway, it must first be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be placed under the granular backfill if the soil proves to be somewhat loamy (clayey). If you have a new house, it is best to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle . In the case of a fix of the entry, a simple replacement of the asphalt layer can be considered in the event the contractor considers that the present base is adequate. In both scenarios, foundation redone or base preserved, the whole period of its guarantee has to be the same.

Snow Removal Anniston Alabama

The weather conditions in our beautiful province may have a devastating effect on an asphalt drive, hence the importance of adding a slope having a minimum slope of 2%. This will allow water to drain into the street and minimize the risk of heaving or cracking. This important detail has to be taken into consideration when excavating and maintained during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the start of the work: he will have the ability to provide materials so. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 ) after being compacted. For optimal stability, the base should extend over the surface to be paved by about thirty centimeters (a couple inches) on each side. Also note that the installation of side supports around the foundation is a fantastic way to avoid potential cracks and this asphalting done in chilly weather is going to be of poor quality. It's therefore better to wait for the bright days to return before beginning work.

To avoid unpleasant surprises, then choose your contractor and be certain that the name and address of the business are written on the contract. The start and end dates of the work, as well as proof of the contractor's liability insurance and the technical specifics of this job to be completed, should also be included. No contractor should need a deposit before work starts. To avoid the inconvenience that could lead to unforeseen expenses, visit the Snow RemovalAnniston site. You may thus have the tools in hand to successfully complete your asphalt paving project.

Snow Removal Anniston - Greatest Alabama at Alabama!

For caliber asphalting work , phone on Snow Removal, Anniston professional team. Confirm our Business section to find out the regions served.

Concrete Maintenance Anniston | Tar And Chip Paving Anniston
Home >> alabama/anniston >> snow removal
Share this...