Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Alternatives for the asphalt surface in Bessemer, Alabama


Asphalt installed on an unstable surface could quickly lead to problems. There are three main options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than revealing severe cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is elevation: make certain fences, garage floors, and other constructions aren't compromised by the greater level of this new surface.
  2. Remove old driveway, peg to the ground: The present driveway is completely removed (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Remove the old driveway and secure it to a good surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mixture.

Our Services:

The best time to install Asphalt in Bessemer

The more asphalt you work, the more leeway you might have. For example, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. Generally, for lean asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix remains functional during this period of time, however, the time is limited.

How much can an Asphalt cost in Bessemer?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt perform.

Furthermore, it'll be useful to tell the contractor if you have a recreational vehicle or a van. He will need to accommodate the asphalt mix in order to be more resistant to the burden of heavy vehicles.

The Benefits of Asphalt

  • Smooth end;
  • non-slip
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it has been installed );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt used along with the paving contractor.

For a sustainable Asphalt

The life of an asphalt paver may be up to 20 decades, when the very best states are satisfied. We're talking about a professional paving builder, a great grade of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly depends upon the quality of the laying. Indeed, the major causes of deformation or ripping of an asphalt coating are the lack of compaction and a thin foundation. On the other hand, the upkeep of the asphalt pavement is also a determining factor in its own longevity. That is to say, you'll have to seal your drive once in ten years, at a minimum, in order to keep its great state.


We suggest that you inform your asphalting contractor if you choose to have your driveway asphalt in order to sell your property. It might not be necessary to pay top dollar for laying asphalt , in this case.

Asphalt placing: cost and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you will need to choose it carefully.

Our ensures and Asphalt work

Make sure the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

These details must be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to be aware that a paving contractor can't demand that you make a deposit before work has begun. But you should agree to the payment provisions and make sure it is about the contract.

A solid base for Asphalt- Bessemer

Before redoing the asphalt driveway to your new residence by a contractor, or obtaining some fundamental knowledge is imperative to make sure the job is well done. Know first that the absence of compaction and the inadequate depth of the foundation are the two chief causes of the deformation or tearing of a coating of asphalt. If it's a new driveway, then it has to first be excavated to make room for a layer of crushed stone of adequate thickness. A geotextile membrane will be set under the granular backfill if the dirt turns out to be very loamy (clayey). If you have a new house, it is ideal to wait 6 to 12 months prior to paving your driveway, to allow the dirt to settle naturally. In the case of a fix of the entry, a simple replacement of the asphalt coating can be considered if the contractor considers that the present base is adequate. In both scenarios, foundation redone or foundation preserved, the duration of its guarantee has to be the same.

Asphalt Bessemer Alabama

The weather conditions in our beautiful province can have a disastrous impact on an asphalt drive, thus the significance of including a slope having a minimum slope of 2%. This will enable water to drain into the street and minimize the risk of heaving or cracking. This important detail must be taken into account when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder before the start of the work: he is going to be able to provide materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the base should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of unwanted supports around the foundation is a fantastic method to avoid potential cracks and that asphalting done in chilly weather is going to be of inferior quality. It is therefore far better to await the sunny days to go back before beginning work.

A definite contract with your builder in Bessemer

To avoid unpleasant surprises, select your contractor and be certain that the title and address of his company are written on the contract. The beginning and end dates of the job, in addition to proof of this contractor's liability insurance and the technical specifics of this job to be carried out, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that might cause unforeseen costs, take a look at the AsphaltBessemer website. You may thus have the tools in hand to successfully complete your asphalt paving project.

Asphalt Bessemer - Greatest Alabama in Alabama!

For caliber asphalting work , phone on Asphalt, Bessemer professional team. Confirm our Company department to figure out the regions served.

Tar And Chip Paving Bessemer | Parking Lot Repair And Striping Bessemer
Home >> alabama/bessemer >> asphalt
Share this...