Concrete Maintenance installed in an unstable surface can quickly lead to difficulties. There are 3 Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not showing severe cracks or crumbling, hot asphalt mix can be placed directly within your driveway. One aspect is elevation: make certain fences, garage flooring, and other structures aren't jeopardized by the higher level of this new surface.
  2. Eliminate old driveway, peg to the ground: The existing driveway is completely eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Remove the old driveway and secure it into a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mixture. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance in Center Point

The longer asphalt you work, the more leeway you have. By way of instance, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix is ​​still practical during this period of time, but the time is limited.

How much does an Concrete Maintenance cost in Center Point?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The substantial temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it will be good to tell the contractor should you have a recreational vehicle or a van. He will have to adapt the asphalt mix so as to be more immune to the burden of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth end;
  • non invasive
  • Simple to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it's been installed );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed and the paving contractor.

To get a sustainable Concrete Maintenance

The life of an asphalt paver may be around 20 years, when the best states are satisfied. We're referring to a professional paving contractor, a good grade of asphalt and also an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly is dependent upon the quality of the placing. Really, the major causes of deformation or tearing of an asphalt coating are the lack of compaction plus a lean base. On the other hand, the maintenance of the asphalt pavement is also a deciding factor in its own longevity. That is to say, you will have to seal your driveway once in 10 years, at a minimum, in order to maintain its good state.


We suggest that you inform your asphalting builder if you decide to have your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Concrete Maintenance placing: price and contract

The choice of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you'll have to choose it carefully.

Guarantee that the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the contract:

- date of start and end of the work;

- proof of insurance;

- technical details;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder can't demand you to make a down payment before work has begun. But you need to agree to the payment provisions and make sure it is about the contract.

A solid base for Concrete Maintenance- Center Point

Before redoing the Concrete Maintenance driveway to your new home by a builder, or obtaining some basic knowledge is vital to guarantee that the job is done. Know first that the lack of compaction and the inadequate depth of the base are the two chief causes of the deformation or ripping of a coating of asphalt. If it is a new driveway, it must first be excavated to make room for a coating of crushed stone of adequate thickness. A geotextile membrane will be set under the granular backfill if the soil proves to be somewhat loamy (clayey). If you have a new home, it's best to wait for 6 to 12 months prior to paving your drive, to enable the soil to settle . In the event of a repair of the entry, a simple replacement of the Concrete Maintenance coating can be considered in the event the contractor considers that the existing base is adequate. In both scenarios, base redone or base preserved, the whole period of its guarantee must be exactly the same.

Concrete Maintenance Center Point Alabama

The weather conditions in our lovely state can have a disastrous impact on an asphalt driveway, hence the importance of adding a slope with a minimum slope of 2%. This will allow water to drain to the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder prior to the onset of the work: he will have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of unwanted supports around the base is a fantastic method to prevent possible cracks and that Concrete Maintenance done in chilly weather will be of inferior quality. It's therefore far better to await the sunny days to go back before starting work.

To avoid unpleasant surprises, choose your contractor diligently and make sure the title and address of the business are composed about the contract. The beginning and end dates of this work, in addition to proof of the contractor's liability insurance and the technical details of the job to be completed, should also be included. No contractor should require a deposit before work begins. To prevent the inconvenience that could cause unforeseen costs, take a look at the Concrete MaintenanceCenter Point website. You may thus have all the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Center Point - Best Alabama at Alabama!

For caliber asphalting work , phone on Concrete Maintenance, Center Point professional team. Consult our Business department to figure out the regions served.

Parking Lot Repair And Striping Center Point | Snow Removal Center Point
Home >> alabama/center point >> concrete maintenance
Share this...