Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt surface in Daphne, Alabama


Concrete Maintenance installed in an unstable surface could quickly lead to difficulties. There are 3 Chief choices for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is height: make certain fences, garage flooring, and other constructions aren't jeopardized by the higher degree of the surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Eliminate the old driveway and fasten it to a solid surface. This is the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mixture. Generally 6 to 8 inches of aggregate extends under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance from Daphne

The longer asphalt you operate, the more leeway you might have. For example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. Generally, for lean asphalt programs (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still practical in this period of time, but the time is limited.

How much does an Concrete Maintenance price in Daphne?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

In addition, it'll be good to distinguish the contractor should you have a recreational vehicle or a van. He will have to accommodate the asphalt mix in order to be more immune to the weight of heavy vehicles.

The advantages of Concrete Maintenance

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt used along with the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver may be up to 20 years, when the very best conditions are satisfied. We are referring to a professional paving contractor, a good quality of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Daphne: price, quality of work and lifespan


The longevity of residential asphalt paving largely depends upon the quality of the placing. Really, the significant causes of deformation or tearing of an asphalt layer are the lack of compaction plus a lean base. However, the maintenance of the asphalt pavement can be a determining factor in its longevity. That is to say, you will need to seal your driveway once in 10 decades, at a minimum, so as to keep its great state.


We advise you to notify your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It may not be necessary to pay top dollar for laying asphalt , in this case.

Concrete Maintenance laying: price and contract

The option of the asphalt laying contractor is essential. In order to not have unpleasant surprises, you'll have to select it carefully.

Our ensures and Concrete Maintenance work

Make sure the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

The following details must be included in the contract:

- date of beginning and end of the job;

- proof of insurance;

- technical details;

- RBQ certification number.

You should know that a Concrete Maintenance contractor cannot demand you to make a deposit before work has begun. But you should agree on the payment provisions and be sure it's on the contract.

Before redoing the Concrete Maintenance drive to your new residence by a builder, or acquiring some fundamental knowledge is vital to guarantee that the job is well done. Know first that the lack of compaction and the insufficient depth of the base are the two chief causes of the deformation or ripping of a coating of asphalt. If it's a new driveway, it must initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set beneath the granular backfill if the soil proves to be somewhat loamy (clayey). If you have a new house, it is best to wait for 6 to 12 months prior to paving your driveway, to enable the soil to settle . In the event of a fix of this entry, an easy replacement of the Concrete Maintenance coating can be considered if the contractor believes that the existing base is adequate. In both cases, foundation redone or foundation maintained, the duration of its warranty must be the same.

Concrete Maintenance Daphne Alabama

The weather conditions in our beautiful province may have a disastrous impact on an asphalt drive, hence the significance of including a slope with a minimum slope of 2%. This will enable water to drain to the street and minimize the risk of heaving or cracking. This significant detail must be taken into consideration when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the start of the work: he is going to be able to supply materials so. Some asphalt combinations produce an asphalt which is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of 5 cm (2 ) after being compacted. For optimal stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of unwanted supports around the foundation is a good method to avoid possible cracks and this Concrete Maintenance done in chilly weather will be of inferior quality. It is therefore better to await the bright days to go back before starting work.

To avoid unpleasant surprises, then select your contractor diligently and make sure the title and address of the business are written about the contract. The start and end dates of the job, in addition to proof of the contractor's liability insurance and also the technical details of this job to be completed, should also be included. No contractor should need a down payment before work begins. To prevent the inconvenience that could lead to unforeseen costs, visit the Concrete MaintenanceDaphne site. You will thus have all the resources in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Daphne - Greatest Alabama at Alabama!

For caliber asphalting perform , call on Concrete Maintenance, Daphne specialist team. Confirm our Business section to figure out the regions served.

Parking Lot Repair And Striping Daphne | Snow Removal Daphne
Home >> alabama/daphne >> concrete maintenance
Share this...