Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Dixiana, Alabama


Parking Lot Repair And Striping installed in an unstable surface can quickly lead to problems. There are 3 Chief choices for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 aspect is elevation: make certain fences, garage flooring, and other constructions aren't compromised by the higher degree of this surface.
  2. Remove old driveway, peg to the ground: The existing driveway is completely eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mix.

Our Services:

The best time to install Parking Lot Repair And Striping in Dixiana

The more asphalt you operate, the more leeway you might have. By way of example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. Generally, for lean asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix remains functional during this period, however, the time is constrained.

How much can an Parking Lot Repair And Striping price in Dixiana?

Consider the weather vagaries of the climate when deciding upon the standard of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt perform.

Furthermore, it'll be good to distinguish the contractor if you own a recreational vehicle or a van. He will have to accommodate the asphalt mix in order to be more resistant to the weight of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt used along with the paving contractor.

For a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver may be up to 20 years, when the best states are satisfied. We are talking about a professional paving contractor, a good quality of asphalt and an optimal asphalt laying technique.

Parking Lot Repair And Striping in Dixiana: price, quality of work and lifespan


The durability of residential asphalt paving chiefly is dependent on the standard of the laying. Indeed, the major causes of deformation or ripping of an asphalt layer are the lack of compaction and a thin foundation. On the other hand, the maintenance of the asphalt sidewalk can be a deciding factor in its longevity. That's to say, you will have to seal your drive once in 10 decades, at a minimum, so as to maintain its great condition.


We advise you to notify your asphalting contractor in case you choose to get your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for laying asphalt , in this circumstance.

Parking Lot Repair And Striping laying: price and contract

The option of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, you will need to select it carefully.

Make sure the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the contract:

- date of beginning and finish of the work;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving builder cannot demand that you make a deposit before work has started. But you should agree to the payment terms and be sure it is on the contract.

Prior to estimating the asphalt driveway to your new residence by a builder, or acquiring some fundamental knowledge is imperative to make sure the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two main sources for the deformation or tearing of a layer of asphalt. If it is a new driveway, then it must first be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane will be set beneath the granular backfill if the soil turns out to be somewhat loamy (clayey). If you own a new home, it's ideal to wait 6 to 12 months prior to paving your driveway, to enable the soil to settle naturally. In the case of a repair of this entrance, a simple replacement of the asphalt layer can be considered if the contractor considers that the present foundation is adequate. In both scenarios, foundation redone or base maintained, the whole period of its guarantee must be exactly the same.

Parking Lot Repair And Striping Dixiana Alabama

The weather conditions in our lovely state can have a devastating effect in an asphalt drive, thus the importance of including a slope with a minimum slope of 2%. This will allow water to drain to the street and decrease the risk of heaving or cracking. This important detail must be taken into consideration when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the onset of the work: he is going to be able to provide materials accordingly. Some asphalt combinations produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by about thirty centimeters (a couple inches) on each side. Also note that the installation of side supports around the base is a fantastic method to avoid possible cracks and that asphalting done in chilly weather will be of poor quality. It is therefore better to await the bright days to return before starting work.

A Parking Lot Repair And Striping contract with your contractor in Dixiana

To avoid unpleasant surprises, select your contractor diligently and make sure the title and address of his business are composed on the contract. The start and end dates of this work, in addition to proof of the builder's liability insurance and also the technical details of the job to be carried out, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that could lead to unforeseen costs, take a look at the Parking Lot Repair And StripingDixiana website. You may thus have all the resources in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Dixiana - Best Alabama at Alabama!

For quality asphalting work , phone on Parking Lot Repair And Striping, Dixiana professional team. Consult our Business department to figure out the regions served.

Asphalt Dixiana | Concrete Maintenance Dixiana
Home >> alabama/dixiana >> parking lot repair and Striping
Share this...