Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt surface in East Florence, Alabama


Snow Removal installed on an unstable surface can quickly lead to problems. There are three Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than revealing severe cracks or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 facet is height: make sure fences, garage floors, and other constructions aren't jeopardized by the higher degree of the new surface.
  2. Remove old driveway, counter into the ground: The present driveway is totally removed (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix.

Our Services:

The best time to install Snow Removal from East Florence

The more asphalt you work, the more leeway you have. By way of example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains practical in this period, however, the time is constrained.

How much can an Snow Removal price in East Florence?

Take into account the weather vagaries of the climate when choosing the quality of asphalt. The significant temperature variations we experience cause considerable damage to asphalt work.

In addition, it will be useful to tell the contractor if you own a recreational vehicle or a van. He will need to accommodate the asphalt mix so as to be more immune to the burden of heavy vehicles.

The advantages of Snow Removal

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used and the paving contractor.

To get a sustainable Snow Removal

The life of an asphalt paver can be around 20 decades, when the best conditions are met. We're referring to a professional paving builder, a great quality of asphalt and also an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly is dependent upon the standard of the placing. Indeed, the major causes of deformation or ripping of an asphalt layer are the lack of compaction plus a lean base. On the other hand, the upkeep of the asphalt sidewalk is also a determining factor in its own longevity. That is to say, you'll need to seal your driveway once in 10 decades, at a minimum, so as to maintain its great condition.


We suggest that you inform your asphalting builder in case you decide to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for placing asphalt , in this case.

Snow Removal laying: price and contract

The choice of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you'll need to choose it carefully.

Our ensures and Snow Removal work

Guarantee that the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

The following details should be included in the contract:

- date of beginning and end of the job;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving contractor can't demand you to make a down payment before work has begun. However, you need to agree to the payment provisions and be sure it is on the contract.

Prior to estimating the asphalt drive to your new residence by a builder, or obtaining some basic knowledge is vital to guarantee that the job is well done. Know first that the absence of compaction and the insufficient depth of the base are the two chief causes of the deformation or ripping of a layer of asphalt. When it's a new driveway, then it has to initially be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane is going to be placed beneath the granular backfill if the soil proves to be very loamy (clayey). If you have a new house, it is best to wait 6 to 12 months before paving your drive, to allow the soil to settle naturally. In the event of a fix of the entrance, an easy replacement of the asphalt layer can be considered in the event the contractor believes that the present base is adequate. In both cases, base redone or foundation maintained, the whole period of its guarantee has to be exactly the same.

Snow Removal East Florence Alabama

The weather conditions in our beautiful province can have a disastrous impact in an asphalt driveway, hence the importance of adding a slope with a minimum slope of 2%. This will allow water to drain to the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the onset of the job: he will have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 in) after being compacted. For optimum stability, the base should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the installation of side supports around the foundation is a good way to prevent potential cracks and this asphalting done in cold weather will be of inferior quality. It's therefore far better to wait for the sunny days to go back before starting work.

A definite contract with your contractor in East Florence

To avoid unpleasant surprises, then choose your contractor diligently and make sure that the title and address of the company are written about the contract. The beginning and end dates of the job, as well as evidence of the builder's liability insurance and also the technical specifics of this job to be carried out, should also be included. No contractor should need a deposit before work starts. To avoid the inconvenience that could cause unforeseen expenses, visit the Snow RemovalEast Florence site. You may thus have the tools in hand to successfully complete your asphalt paving project.

Snow Removal East Florence - Greatest Alabama at Alabama!

For quality asphalting work , phone on Snow Removal, East Florence professional team. Consult our Business section to find out the regions served.

Concrete Maintenance East Florence | Tar And Chip Paving East Florence
Home >> alabama/east florence >> snow removal
Share this...