Concrete Maintenance installed on an unstable surface can quickly lead to difficulties. There are three main choices for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not showing severe cracks or crumbling, hot asphalt mix can be laid directly over your driveway. One aspect is elevation: make sure fences, garage flooring, and other structures are not jeopardized by the greater level of this new surface.
  2. Remove old driveway, peg to the floor: The present driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Eliminate the old driveway and secure it to a solid surface. This is the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix.

Our Services:

The best time to install Concrete Maintenance from Foley

The more asphalt you work, the more leeway you might have. For instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to consult with your contractor. The hot mix is ​​still practical during this period of time, but the time is constrained.

How much can an Concrete Maintenance price in Foley?

Consider the weather vagaries of our climate when choosing the standard of asphalt. The substantial temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it'll be good to distinguish the contractor should you have a recreational vehicle or even a van. He might need to adapt the asphalt mix in order to be more immune to the weight of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth finish;
  • non-slip
  • easy to maintain
  • watertightness ensured
  • withstands the rigors of the Quebec climate quite well (provided it has been set up );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price varies depending on the characteristic of the asphalt employed and the paving contractor.

To get a sustainable Concrete Maintenance

The existence of an asphalt paver can be around 20 decades, when the best states are satisfied. We're referring to a professional paving builder, a good quality of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Foley: cost, quality of work and lifespan


The durability of residential asphalt paving chiefly is dependent on the quality of the placing. Really, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction and a thin foundation. However, the upkeep of the asphalt sidewalk can be a determining factor in its own longevity. That is to say, you'll need to seal your drive once in 10 decades, at a minimum, in order to maintain its great state.


We advise you to inform your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for placing asphalt , in such a circumstance.

Concrete Maintenance laying: price and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you'll need to choose it carefully.

Make sure the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

These details should be included in the contract:

- date of beginning and finish of the job;

- proof of insurance;

- technical details;

- RBQ certification number.

You ought to be aware that a Concrete Maintenance builder cannot require that you make a deposit before work has started. But you should agree to the payment provisions and make sure it is on the contract.

A solid base for Concrete Maintenance- Foley

Before redoing the Concrete Maintenance driveway to your new residence by a builder, or obtaining some basic knowledge is vital to make sure the job is well done. Know first that the lack of compaction and the inadequate thickness of the foundation are the two chief sources for the deformation or ripping of a coating of asphalt. When it's a new driveway, then it must initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set beneath the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you own a new house, it's ideal to wait for 6 to 12 months prior to paving your drive, to enable the soil to settle . In the case of a fix of the entrance, a simple replacement of the Concrete Maintenance coating can be considered in the event the contractor believes that the present foundation is sufficient. In both scenarios, base redone or base preserved, the duration of its guarantee must be the same.

Concrete Maintenance Foley Alabama

The weather conditions in our beautiful province can have a disastrous impact in an asphalt drive, hence the significance of adding a slope having a minimum slope of 2%. This will enable water to drain to the street and minimize the danger of heaving or cracking. This important detail must be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the contractor prior to the start of the job: he is going to be able to supply materials so. Some asphalt mixtures produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of side supports around the base is a good way to avoid possible cracks and this Concrete Maintenance done in cold weather is going to be of poor quality. It's therefore better to wait for the sunny days to go back before beginning work.

To avoid unpleasant surprises, then select your contractor and make sure the name and address of the company are written about the contract. The start and end dates of the work, in addition to evidence of the builder's liability insurance and the technical details of this project to be carried out, should also be included. No contractor should require a deposit before work starts. To prevent the inconvenience that could cause unforeseen costs, take a look at the Concrete MaintenanceFoley website. You will thus have the resources in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Foley - Best Alabama at Alabama!

For quality asphalting perform , call on Concrete Maintenance, Foley specialist team. Consult our Business department to figure out the regions served.

Parking Lot Repair And Striping Foley | Snow Removal Foley
Home >> alabama/foley >> concrete maintenance
Share this...