Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Foley, Alabama


Parking Lot Repair And Striping installed in an unstable surface can quickly lead to problems. There are 3 main options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not revealing severe fractures or crumbling, hot asphalt mix can be laid directly over your driveway. 1 aspect is elevation: make certain fences, garage floors, and other structures aren't compromised by the higher degree of the surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is completely eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed right on the ground.
  3. Remove the old driveway and secure it to a solid surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mixture. Generally 6 to 8 inches of aggregate extends under 3 inches of asphalt.

The longer asphalt you work, the more leeway you might have. For instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. In general, for lean asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to speak to your contractor. The hot mix remains practical in this period, but the time is limited.

How much does an Parking Lot Repair And Striping price in Foley?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations we experience cause considerable damage to asphalt work.

Furthermore, it'll be useful to tell the contractor should you have a recreational vehicle or even a van. He might need to accommodate the asphalt mixture so as to be more resistant to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

  • Smooth end;
  • non-slip
  • Simple to Keep
  • watertightness ensured
  • withstands the rigors of the Quebec climate very well (provided it has been set up );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver may be up to 20 decades, when the best states are satisfied. We are referring to a professional paving builder, a good quality of asphalt and an optimal asphalt laying technique.

Parking Lot Repair And Striping in Foley: cost, quality of work and lifespan


The durability of residential asphalt paving largely is dependent on the quality of the laying. Really, the major causes of deformation or tearing of an asphalt coating are the lack of compaction and a lean base. However, the upkeep of the asphalt pavement can be a determining factor in its own longevity. That is to say, you will need to seal your driveway once in ten years, at a minimum, so as to keep its good state.


We advise you to inform your asphalting builder in case you decide to have your driveway asphalt in order to offer your property. It may not be necessary to pay top dollar for placing asphalt , in this case.

Parking Lot Repair And Striping laying: cost and contract

The option of the asphalt laying builder is indispensable. In order to not have unpleasant surprises, then you will need to choose it carefully.

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has been the subject of complaints.

These details should be included in the contract:

- date of start and finish of the job;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You should be aware that a paving contractor cannot require that you make a deposit before work has started. However, you should agree to the payment terms and make sure it is on the contract.

A solid foundation for Parking Lot Repair And Striping- Foley

Before redoing the asphalt driveway to your new residence by a contractor, or acquiring some fundamental knowledge is vital to make sure the job is done. Know first that the lack of compaction and the inadequate depth of the foundation are the two chief sources for the deformation or tearing of a coating of asphalt. If it is a new driveway, it has to first be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be set under the granular backfill if the soil turns out to be somewhat loamy (clayey). If you have a new home, it is best to wait 6 to 12 months before paving your drive, to allow the soil to settle . In the case of a repair of this entry, an easy replacement of the asphalt layer can be considered in the event the contractor believes that the existing base is sufficient. In both scenarios, base redone or base maintained, the duration of its guarantee must be the same.

Parking Lot Repair And Striping Foley Alabama

The weather conditions in our lovely state can have a devastating effect on an asphalt driveway, hence the importance of including a slope having a minimum slope of 2%. This will enable water to drain into the street and minimize the risk of heaving or cracking. This significant detail must be taken into consideration when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the onset of the work: he is going to be able to provide materials accordingly. Some asphalt combinations produce an asphalt which is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of 5 cm (2 in) after being compacted. For optimal stability, the base should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the foundation is a good way to prevent possible cracks and this asphalting done in chilly weather is going to be of inferior quality. It's therefore far better to wait for the sunny days to return before beginning work.

A definite contract with your contractor in Foley

To avoid unpleasant surprises, then choose your contractor diligently and be certain the name and address of the company are written about the contract. The start and finish dates of this work, as well as proof of the contractor's liability insurance and the technical specifics of the project to be completed, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that could cause unforeseen costs, take a look at the Parking Lot Repair And StripingFoley website. You will thus have all the resources in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Foley - Greatest Alabama at Alabama!

For quality asphalting work , call on Parking Lot Repair And Striping, Foley professional team. We have more than twenty years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to figure out the regions served.

Asphalt Foley | Concrete Maintenance Foley
Home >> alabama/foley >> parking lot repair and Striping
Share this...