Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Fort Payne, Alabama


Parking Lot Repair And Striping installed on an unstable surface could quickly lead to difficulties. There are three main options for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not showing serious fractures or crumbling, hot asphalt mix can be laid directly over your driveway. One aspect is height: make sure fences, garage floors, and other structures are not jeopardized by the higher level of the new surface.
  2. Eliminate old driveway, counter into the floor: The present driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mixture. Typically 6 to 8 inches of limestone extends under 3 inches of asphalt.

The longer asphalt you operate, the more leeway you might have. By way of instance, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix remains functional during this period of time, but the time is constrained.

How much can an Parking Lot Repair And Striping price in Fort Payne?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it will be good to tell the contractor if you have a recreational vehicle or even a van. He might have to adapt the asphalt mix in order to be more immune to the weight of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

  • Smooth finish;
  • non invasive
  • Simple to Keep
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate very well (provided it has been installed optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt used along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be up to 20 decades, when the very best conditions are met. We are talking about a professional paving builder, a great grade of asphalt as well as an optimal asphalt laying technique.

Parking Lot Repair And Striping in Fort Payne: price, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the quality of the placing. Really, the significant causes of deformation or tearing of an asphalt coating are the lack of compaction and a lean base. On the other hand, the maintenance of the asphalt pavement can be a deciding factor in its own longevity. That is to say, you'll have to seal your driveway once in ten decades, at a minimum, so as to keep its great state.


We suggest that you notify your asphalting builder in case you decide to get your driveway asphalt in order to offer your property. It might not be essential to pay top dollar for laying asphalt , in such a case.

Parking Lot Repair And Striping laying: cost and contract

The choice of the asphalt laying builder is indispensable. In order to not have unpleasant surprises, then you will have to choose it carefully.

Make sure the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the arrangement:

- date of beginning and finish of the job;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving builder cannot demand that you make a deposit before work has started. But you should agree to the payment provisions and make sure it is about the contract.

Before redoing the asphalt drive to your new residence by a contractor, or acquiring some fundamental knowledge is imperative to make sure the job is done. Know first that the lack of compaction and the inadequate depth of the base are the two chief sources for the deformation or tearing of a coating of asphalt. If it's a new driveway, then it has to first be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane is going to be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you have a new home, it is best to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle naturally. In the case of a repair of this entrance, a simple replacement of the asphalt layer can be considered if the contractor believes that the present foundation is sufficient. In both cases, base redone or foundation maintained, the whole period of its guarantee has to be the same.

Parking Lot Repair And Striping Fort Payne Alabama

The weather conditions in our beautiful province can have a devastating effect in an asphalt driveway, hence the importance of adding a slope with a minimum slope of 2%. This will allow water to drain into the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the onset of the work: he is going to be able to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 in) after being compacted. For optimum stability, the base should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the setup of unwanted supports around the foundation is a fantastic method to avoid possible cracks and this asphalting done in cold weather will be of inferior quality. It's therefore far better to await the bright days to return before starting work.

A definite contract with your builder in Fort Payne

To avoid unpleasant surprises, then select your contractor diligently and make certain that the title and address of his company are composed on the contract. The beginning and finish dates of the job, as well as proof of this builder's liability insurance and the technical specifics of this project to be completed, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that could lead to unforeseen costs, take a look at the Parking Lot Repair And StripingFort Payne site. You may thus have the resources in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Fort Payne - Best Alabama at Alabama!

For quality asphalting perform , phone on Parking Lot Repair And Striping, Fort Payne specialist team. We have over twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to figure out the regions served.

Asphalt Fort Payne | Concrete Maintenance Fort Payne
Home >> alabama/fort payne >> parking lot repair and Striping
Share this...