Parking Lot Repair And Striping installed in an unstable surface could quickly lead to problems. There are three Chief choices for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is elevation: make sure fences, garage floors, and other structures are not compromised by the greater degree of the new surface.
  2. Eliminate old driveway, peg to the ground: The existing driveway is totally eliminated (or you may not have a driveway yet) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mixture. Generally 6 to 8 inches of limestone goes under 3 inches of asphalt.

The longer asphalt you operate, the more leeway you have. For example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix remains practical during this period, however, the time is limited.

How much can an Parking Lot Repair And Striping price in Gulf Shores?

Take into account the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

In addition, it'll be good to distinguish the contractor should you have a recreational vehicle or even a van. He will need to adapt the asphalt mix in order to be more resistant to the weight of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

  • Smooth finish;
  • non-slip
  • Simple to maintain
  • watertightness guaranteed
  • withstands the rigors of the Quebec climate very well (provided it has been set up optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be around 20 decades, when the best states are met. We're referring to a professional paving contractor, a great grade of asphalt as well as also an optimal asphalt laying technique.

Parking Lot Repair And Striping in Gulf Shores: price, quality of work and lifespan


The longevity of residential asphalt paving chiefly depends upon the quality of the placing. Indeed, the major causes of deformation or tearing of an asphalt layer are the absence of compaction and a lean base. However, the maintenance of the asphalt sidewalk is also a determining factor in its longevity. That's to say, you will have to seal your drive once in ten years, at a minimum, so as to maintain its good state.


We suggest that you inform your asphalting builder in case you choose to get your driveway asphalt so as to offer your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Parking Lot Repair And Striping laying: cost and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you'll have to select it carefully.

Our guarantees and Parking Lot Repair And Striping work

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has been the subject of complaints.

The following details should be included in the arrangement:

- date of start and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to be aware that a paving contractor cannot demand that you make a deposit before work has started. But you should agree on the payment terms and be sure it's on the contract.

Before redoing the asphalt driveway to your new residence by a contractor, or acquiring some basic knowledge is vital to guarantee that the job is well done. Know first that the absence of compaction and the insufficient depth of the foundation are the two main sources for the deformation or tearing of a coating of asphalt. When it is a new driveway, then it has to first be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane will be set under the granular backfill if the dirt proves to be very loamy (clayey). If you have a new home, it is ideal to wait for 6 to 12 months before paving your driveway, to enable the dirt to settle . In the event of a fix of this entry, a simple replacement of the asphalt layer can be considered if the contractor believes that the present base is sufficient. In both scenarios, foundation redone or foundation preserved, the whole period of its guarantee has to be exactly the same.

Parking Lot Repair And Striping Gulf Shores Alabama

The weather conditions in our lovely state may have a disastrous impact on an asphalt driveway, thus the importance of adding a slope with a minimum slope of 2%. This will allow water to drain to the street and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor prior to the onset of the job: he will be able to provide materials accordingly. Some asphalt combinations produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the installation of unwanted supports around the foundation is a good method to avoid possible cracks and that asphalting done in cold weather is going to be of poor quality. It's therefore better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, then choose your contractor and make sure the title and address of the business are written on the contract. The start and end dates of this work, in addition to evidence of this builder's liability insurance and the technical specifics of this job to be carried out, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that might cause unforeseen costs, visit the Parking Lot Repair And StripingGulf Shores website. You will thus have all the tools in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Gulf Shores - Best Alabama in Alabama!

For caliber asphalting work , call on Parking Lot Repair And Striping, Gulf Shores professional team. Confirm our Company department to find out the regions served.

Asphalt Gulf Shores | Concrete Maintenance Gulf Shores
Home >> alabama/gulf shores >> parking lot repair and Striping
Share this...