Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt surface in Hoover, Alabama


Snow Removal installed on an unstable surface can quickly lead to problems. There are 3 main options for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing serious cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is elevation: make sure fences, garage floors, and other constructions aren't jeopardized by the greater level of the surface.
  2. Remove old driveway, peg to the floor: The present driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and secure it to a solid surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mix.

The longer asphalt you operate, the more leeway you might have. For instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still functional in this period of time, but the time is constrained.

How much does an Snow Removal cost in Hoover?

Consider the weather vagaries of our climate when deciding upon the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

In addition, it'll be useful to distinguish the contractor should you own a recreational vehicle or even a van. He will need to accommodate the asphalt mixture so as to be more immune to the burden of heavy vehicles.

The Benefits of Snow Removal

  • Smooth finish;
  • non invasive
  • easy to Keep
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it has been installed );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt employed along with the paving contractor.

For a sustainable Snow Removal

The life of an asphalt paver may be up to 20 decades, when the best conditions are met. We're talking about a professional paving builder, a great quality of asphalt as well as also an optimal asphalt laying technique.

Snow Removal in Hoover: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent on the quality of the laying. Really, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction and a lean base. On the other hand, the upkeep of the asphalt pavement is also a deciding factor in its longevity. That's to say, you will need to seal your drive once in ten decades, at a minimum, so as to keep its good state.


We advise you to notify your asphalting builder if you choose to have your driveway asphalt so as to sell your property. It might not be essential to pay top dollar for laying asphalt , in such a circumstance.

Snow Removal laying: price and contract

The option of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, then you'll need to select it carefully.

Guarantee that the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

The following details must be included in the arrangement:

- date of start and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You should be aware that a paving contractor can't require that you make a deposit before work has started. However, you should agree on the payment provisions and be sure it's about the contract.

A strong base for Snow Removal- Hoover

Before redoing the asphalt driveway to your new residence by a contractor, or obtaining some basic knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two main causes of the deformation or tearing of a coating of asphalt. When it's a new driveway, then it has to first be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set under the granular backfill if the soil turns out to be somewhat loamy (clayey). If you own a new home, it's best to wait 6 to 12 months before paving your driveway, to allow the dirt to settle . In the event of a fix of this entry, a simple replacement of the asphalt layer can be considered if the contractor believes that the existing foundation is sufficient. In both scenarios, foundation redone or foundation preserved, the whole period of its warranty must be exactly the same.

Snow Removal Hoover Alabama

The weather conditions in our beautiful province may have a disastrous impact on an asphalt driveway, thus the importance of including a slope having a minimum slope of 2%. This will allow water to drain into the road and decrease the risk of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the contractor prior to the start of the work: he is going to be able to provide materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the foundation is a fantastic method to avoid potential cracks and this asphalting done in cold weather will be of poor quality. It is therefore better to wait for the sunny days to return before starting work.

A Snow Removal contract with your builder in Hoover

To avoid unpleasant surprises, then choose your contractor diligently and make sure that the name and address of the business are written about the contract. The beginning and end dates of this work, in addition to proof of the builder's liability insurance and the technical details of the job to be carried out, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that might cause unforeseen expenses, visit the Snow RemovalHoover website. You will thus have all the tools in hand to successfully complete your asphalt paving project.

Snow Removal Hoover - Best Alabama at Alabama!

For caliber asphalting work , call on Snow Removal, Hoover specialist team. We have over twenty years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to find out the regions served.

Concrete Maintenance Hoover | Tar And Chip Paving Hoover
Home >> alabama/hoover >> snow removal
Share this...