Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt surface in Jacksonville, Alabama


Concrete Maintenance installed in an unstable surface can quickly lead to difficulties. There are three main choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing serious fractures or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is elevation: make sure fences, garage floors, and other structures are not compromised by the greater degree of the surface.
  2. Remove old driveway, peg to the floor: The existing driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and secure it to a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mixture.

The more asphalt you operate, the more leeway you might have. For example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for thin asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still functional during this period, however, the time is limited.

How much can an Concrete Maintenance cost in Jacksonville?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The substantial temperature variations that we experience cause appreciable damage to asphalt perform.

In addition, it'll be good to distinguish the contractor should you have a recreational vehicle or a van. He might have to accommodate the asphalt mix so as to be more immune to the burden of heavy vehicles.

The advantages of Concrete Maintenance

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used and the paving contractor.

To get a sustainable Concrete Maintenance

The existence of an asphalt paver may be around 20 decades, when the very best states are met. We're referring to a professional paving contractor, a great grade of asphalt and also an optimal asphalt laying technique.

Concrete Maintenance in Jacksonville: price, quality of work and lifespan


The durability of residential asphalt paving largely depends upon the quality of the placing. Really, the significant causes of deformation or ripping of an asphalt coating are the lack of compaction and a lean base. On the other hand, the maintenance of the asphalt sidewalk is also a deciding factor in its own longevity. That is to say, you'll need to seal your drive once in ten decades, at a minimum, so as to maintain its good condition.


We suggest that you inform your asphalting builder in case you decide to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for laying asphalt , in such a circumstance.

Concrete Maintenance placing: price and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you'll have to select it carefully.

Our guarantees and Concrete Maintenance work

Make sure the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

The following details must be included in the arrangement:

- date of start and finish of the work;

- evidence of insurance;

- technical details;

- RBQ certification number.

You ought to know that a Concrete Maintenance contractor can't require that you make a down payment before work has started. However, you need to agree to the payment provisions and make sure it is on the contract.

A solid foundation for Concrete Maintenance- Jacksonville

Before redoing the Concrete Maintenance driveway to your new residence by a contractor, or obtaining some fundamental knowledge is vital to guarantee that the job is done. Know first that the lack of compaction and the insufficient depth of the base are the two chief sources for the deformation or tearing of a coating of asphalt. When it's a new driveway, then it must initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane is going to be placed under the granular backfill if the dirt proves to be very loamy (clayey). If you have a new home, it's ideal to wait 6 to 12 months before paving your driveway, to allow the soil to settle naturally. In the case of a fix of this entry, an easy replacement of the Concrete Maintenance layer can be considered in the event the contractor considers that the existing base is sufficient. In both scenarios, base redone or foundation maintained, the whole period of its guarantee must be the same.

Concrete Maintenance Jacksonville Alabama

The weather conditions in our lovely state may have a disastrous impact in an asphalt drive, thus the importance of adding a slope having a minimum slope of 2%. This will enable water to drain to the road and decrease the danger of heaving or cracking. This important detail must be taken into consideration when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the contractor prior to the start of the work: he will be able to supply materials so. Some asphalt mixtures produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the setup of side supports around the base is a good way to prevent possible cracks and that Concrete Maintenance done in cold weather is going to be of inferior quality. It is therefore far better to wait for the bright days to return before starting work.

To avoid unpleasant surprises, then select your contractor and make certain the title and address of his company are written on the contract. The start and end dates of the job, in addition to proof of the contractor's liability insurance and also the technical specifics of the project to be carried out, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that could lead to unforeseen expenses, visit the Concrete MaintenanceJacksonville site. You will thus have the tools in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Jacksonville - Best Alabama at Alabama!

For quality asphalting work , call on Concrete Maintenance, Jacksonville professional team. Confirm our Company department to find out the regions served.

Parking Lot Repair And Striping Jacksonville | Snow Removal Jacksonville
Home >> alabama/jacksonville >> concrete maintenance
Share this...