Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Jacksonville, Alabama


Snow Removal installed on an unstable surface can quickly lead to difficulties. There are 3 main choices for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 facet is height: make sure fences, garage flooring, and other constructions aren't compromised by the higher degree of the surface.
  2. Eliminate old driveway, peg to the ground: The existing driveway is completely eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is actually the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mixture.

The longer asphalt you operate, the more leeway you might have. For instance, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still functional during this period of time, but the time is constrained.

How much can an Snow Removal price in Jacksonville?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt perform.

Furthermore, it'll be good to tell the contractor if you have a recreational vehicle or even a van. He will have to accommodate the asphalt mix so as to be more immune to the weight of heavy vehicles.

The Benefits of Snow Removal

  • Smooth end;
  • non-slip
  • easy to Keep
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate very well (provided it has been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed and the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver may be up to 20 years, when the best conditions are satisfied. We are talking about a professional paving contractor, a great quality of asphalt and an optimal asphalt laying technique.

Snow Removal in Jacksonville: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent on the standard of the laying. Indeed, the significant causes of deformation or tearing of an asphalt coating are the absence of compaction and a lean base. However, the upkeep of the asphalt sidewalk can be a deciding factor in its own longevity. That is to say, you will need to seal your drive once in ten years, at a minimum, in order to keep its great condition.


We suggest that you inform your asphalting builder in case you decide to have your driveway asphalt in order to sell your property. It might not be essential to pay top dollar for placing asphalt , in this case.

Snow Removal placing: cost and contract

The choice of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, then you will need to select it carefully.

Our guarantees and Snow Removal work

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of beginning and end of the job;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You ought to know that a paving contractor cannot require that you make a down payment before work has begun. But you need to agree on the payment terms and be sure it is about the contract.

Before redoing the asphalt drive to your new home by a builder, or acquiring some basic knowledge is imperative to make sure the job is well done. Know first that the lack of compaction and the inadequate depth of the foundation are the two main causes of the deformation or tearing of a layer of asphalt. If it is a new driveway, it must initially be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane will be placed under the granular backfill if the soil turns out to be somewhat loamy (clayey). If you have a new home, it is ideal to wait 6 to 12 months before paving your drive, to allow the dirt to settle naturally. In the event of a fix of this entry, an easy replacement of the asphalt layer can be considered if the contractor believes that the existing base is sufficient. In both cases, foundation redone or base maintained, the duration of its warranty has to be exactly the same.

Snow Removal Jacksonville Alabama

The weather conditions in our lovely state can have a disastrous impact in an asphalt driveway, thus the importance of including a slope having a minimum slope of 2%. This will enable water to drain to the road and decrease the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder prior to the onset of the job: he will have the ability to provide materials accordingly. Some asphalt combinations produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also note that the setup of unwanted supports around the base is a fantastic way to prevent potential cracks and that asphalting done in chilly weather will be of poor quality. It is therefore better to await the sunny days to return before starting work.

To avoid unpleasant surprises, then select your contractor and make sure the name and address of the company are composed about the contract. The beginning and end dates of the work, as well as evidence of this builder's liability insurance and the technical details of the job to be carried out, should also be included. No contractor should require a down payment before work starts. To avoid the inconvenience that might lead to unforeseen costs, visit the Snow RemovalJacksonville site. You will thus have all the tools in hand to successfully finish your asphalt paving project.

Snow Removal Jacksonville - Best Alabama in Alabama!

For quality asphalting work , call on Snow Removal, Jacksonville specialist team. We've got over twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company department to figure out the regions served.

Concrete Maintenance Jacksonville | Tar And Chip Paving Jacksonville
Home >> alabama/jacksonville >> snow removal
Share this...