Parking Lot Repair And Striping installed in an unstable surface can quickly lead to difficulties. There are 3 main choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing serious cracks or crumbling, hot asphalt mix can be laid directly over your driveway. 1 facet is elevation: make certain fences, garage floors, and other structures are not compromised by the higher degree of the surface.
  2. Eliminate old driveway, peg to the floor: The existing driveway is completely removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mixture.

The more asphalt you work, the more leeway you might have. For example, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still practical during this period, but the time is constrained.

How much does an Parking Lot Repair And Striping cost in Montgomery?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt perform.

Furthermore, it will be useful to tell the contractor should you have a recreational vehicle or even a van. He might need to accommodate the asphalt mix in order to be more resistant to the weight of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several advantages:

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt employed along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be around 20 decades, when the very best states are satisfied. We're talking about a professional paving builder, a great grade of asphalt and an optimal asphalt laying technique.

Parking Lot Repair And Striping in Montgomery: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly depends on the standard of the placing. Really, the significant causes of deformation or tearing of an asphalt coating are the lack of compaction plus a lean base. On the other hand, the upkeep of the asphalt pavement is also a deciding factor in its longevity. That is to say, you will have to seal your driveway once in 10 years, at a minimum, in order to keep its good state.


We suggest that you notify your asphalting builder if you decide to get your driveway asphalt so as to offer your property. It may not be necessary to pay top dollar for placing asphalt , in this case.

Parking Lot Repair And Striping placing: cost and contract

The choice of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, then you will need to select it carefully.

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

The following details should be included in the arrangement:

- date of start and end of the job;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should be aware that a paving builder can't require you to make a down payment before work has started. However, you should agree to the payment provisions and make sure it's on the contract.

A strong base for Parking Lot Repair And Striping- Montgomery

Before redoing the asphalt drive to your new home by a builder, or obtaining some fundamental knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient depth of the foundation are the two chief causes of the deformation or tearing of a coating of asphalt. If it is a new driveway, then it has to initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be placed under the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you own a new house, it is ideal to wait for 6 to 12 months before paving your drive, to enable the soil to settle naturally. In the event of a repair of the entrance, an easy replacement of the asphalt layer can be considered if the contractor believes that the existing base is adequate. In both cases, foundation redone or base preserved, the whole period of its guarantee must be exactly the same.

Parking Lot Repair And Striping Montgomery Alabama

The weather conditions in our lovely state can have a devastating effect in an asphalt driveway, thus the importance of including a slope having a minimum slope of 2%. This will enable water to drain to the street and minimize the danger of heaving or cracking. This important detail has to be taken into consideration when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the start of the work: he will be able to provide materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the foundation is a good way to avoid possible cracks and this asphalting done in cold weather is going to be of poor quality. It is therefore better to wait for the sunny days to return before beginning work.

To avoid unpleasant surprises, select your contractor diligently and be sure the name and address of his company are composed on the contract. The start and finish dates of the job, as well as evidence of this contractor's liability insurance and also the technical details of this job to be completed, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that might lead to unforeseen expenses, take a look at the Parking Lot Repair And StripingMontgomery website. You may thus have the tools in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Montgomery - Best Alabama at Alabama!

For quality asphalting work , call on Parking Lot Repair And Striping, Montgomery professional team. We have over twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to figure out the regions served.