Concrete Maintenance- Options for the asphalt surface in Opelika, Alabama


Concrete Maintenance installed on an unstable surface could quickly lead to problems. There are 3 main choices for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than showing serious fractures or crumbling, hot asphalt mix can be laid directly over your driveway. 1 facet is height: make sure fences, garage flooring, and other constructions are not jeopardized by the greater degree of this new surface.
  2. Eliminate old driveway, counter into the floor: The present driveway is totally eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed right on the ground.
  3. Eliminate the old driveway and fasten it to a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix.

Our Services:

The best time to install Concrete Maintenance in Opelika

The more asphalt you work, the more leeway you might have. For instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for thin asphalt applications (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional during this period, but the time is constrained.

How much does an Concrete Maintenance price in Opelika?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt perform.

Furthermore, it'll be useful to tell the contractor should you own a recreational vehicle or even a van. He will have to adapt the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Concrete Maintenance

A driveway paved with asphalt has several advantages:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used and the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver may be up to 20 decades, when the best states are met. We are talking about a professional paving contractor, a great grade of asphalt and an optimal asphalt laying technique.

Concrete Maintenance in Opelika: cost, quality of work and lifespan


The durability of residential asphalt paving largely is dependent upon the quality of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction plus a lean base. However, the upkeep of the asphalt sidewalk is also a determining factor in its longevity. That is to say, you will need to seal your drive once in ten years, at a minimum, so as to keep its good state.


We advise you to notify your asphalting builder in case you decide to have your driveway asphalt in order to sell your property. It might not be essential to pay top dollar for laying asphalt , in this circumstance.

Concrete Maintenance placing: price and contract

The option of the asphalt laying contractor is essential. In order not to have unpleasant surprises, you will have to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of start and end of the job;

- evidence of insurance;

- technical details;

- RBQ accreditation number.

You should be aware that a Concrete Maintenance contractor cannot require you to make a down payment before work has started. But you need to agree on the payment provisions and be sure it is on the contract.

Before redoing the Concrete Maintenance driveway to your new home by a builder, or obtaining some fundamental knowledge is vital to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the base are the two main causes of the deformation or ripping of a coating of asphalt. If it is a new driveway, then it has to first be excavated to make room for a layer of crushed stone of adequate thickness. A geotextile membrane will be set under the granular backfill if the soil turns out to be very loamy (clayey). If you own a new house, it's best to wait for 6 to 12 months prior to paving your driveway, to enable the dirt to settle naturally. In the event of a fix of the entry, an easy replacement of the Concrete Maintenance layer can be considered if the contractor considers that the present foundation is adequate. In both scenarios, foundation redone or foundation preserved, the duration of its warranty must be exactly the same.

Concrete Maintenance Opelika Alabama

The weather conditions in our lovely state may have a devastating effect on an asphalt drive, thus the importance of adding a slope with a minimum slope of 2%. This will enable water to drain into the road and decrease the risk of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder prior to the start of the work: he is going to be able to provide materials so. Some asphalt combinations produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to reach a thickness of 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the base is a fantastic way to prevent possible cracks and that Concrete Maintenance done in cold weather will be of poor quality. It's therefore far better to await the sunny days to return before starting work.

To avoid unpleasant surprises, then choose your contractor diligently and be certain that the name and address of the company are composed about the contract. The start and finish dates of this work, in addition to evidence of the builder's liability insurance and also the technical details of this job to be completed, should also be included. No contractor should require a down payment before work starts. To avoid the inconvenience that could cause unforeseen expenses, visit the Concrete MaintenanceOpelika site. You will thus have all the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Opelika - Best Alabama in Alabama!

For caliber asphalting perform , phone on Concrete Maintenance, Opelika professional team. Consult our Business department to find out the regions served.