Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt Coating in Opelika, Alabama


Concrete Maintenance installed on an unstable surface could quickly lead to problems. There are 3 Chief options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not showing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 facet is height: make sure fences, garage flooring, and other structures are not compromised by the higher degree of the surface.
  2. Eliminate old driveway, counter into the floor: The present driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Eliminate the old driveway and secure it into a good surface. This is the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mixture. Generally 6 to 8 inches of aggregate extends under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance in Opelika

The more asphalt you work, the more leeway you have. For example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for lean asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains practical during this period, but the time is constrained.

How much does an Concrete Maintenance price in Opelika?

Take into account the weather vagaries of the climate when choosing the standard of asphalt. The significant temperature variations we experience cause considerable damage to asphalt perform.

In addition, it'll be useful to distinguish the contractor if you have a recreational vehicle or even a van. He will need to adapt the asphalt mixture in order to be more immune to the burden of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth finish;
  • non-slip
  • easy to Keep
  • watertightness guaranteed
  • withstands the rigors of the Quebec climate quite well (provided it's been set up );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt employed along with the paving contractor.

To get a sustainable Concrete Maintenance

The existence of an asphalt paver may be up to 20 decades, when the best conditions are satisfied. We are referring to a professional paving builder, a good grade of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Opelika: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the quality of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction plus a thin foundation. However, the upkeep of the asphalt pavement can be a deciding factor in its own longevity. That's to say, you'll need to seal your driveway once in 10 years, at a minimum, in order to keep its great condition.


We suggest that you inform your asphalting contractor if you decide to get your driveway asphalt so as to offer your property. It may not be essential to pay top dollar for laying asphalt , in this case.

Concrete Maintenance placing: cost and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you'll need to select it carefully.

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has become the subject of complaints.

The following details must be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You should know that a Concrete Maintenance contractor can't require that you make a deposit before work has begun. However, you should agree to the payment provisions and be sure it's on the contract.

A solid base for Concrete Maintenance- Opelika

Before redoing the Concrete Maintenance drive to your new residence by a builder, or acquiring some basic knowledge is imperative to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the foundation are the two main causes of the deformation or ripping of a layer of asphalt. When it's a new driveway, then it must initially be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane will be placed under the granular backfill if the soil proves to be very loamy (clayey). If you have a new home, it's ideal to wait for 6 to 12 months before paving your drive, to allow the dirt to settle naturally. In the event of a fix of this entry, an easy replacement of the Concrete Maintenance coating can be considered if the contractor considers that the present foundation is adequate. In both cases, foundation redone or base maintained, the whole period of its guarantee must be exactly the same.

Concrete Maintenance Opelika Alabama

The weather conditions in our lovely state may have a disastrous impact in an asphalt driveway, hence the significance of including a slope having a minimum slope of 2%. This will allow water to drain into the road and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

In case you've got a van or recreational vehicle, notify the contractor prior to the onset of the work: he will have the ability to provide materials so. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also note that the setup of unwanted supports around the foundation is a fantastic method to avoid potential cracks and that Concrete Maintenance done in chilly weather is going to be of poor quality. It is therefore far better to wait for the bright days to return before starting work.

To avoid unpleasant surprises, choose your contractor diligently and be certain the name and address of the business are written about the contract. The start and end dates of the job, as well as proof of the contractor's liability insurance and also the technical details of the project to be carried out, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that could lead to unforeseen expenses, take a look at the Concrete MaintenanceOpelika site. You may thus have the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Opelika - Best Alabama at Alabama!

For caliber asphalting perform , call on Concrete Maintenance, Opelika professional team. We have over twenty decades of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to find out the regions served.

Parking Lot Repair And Striping Opelika | Snow Removal Opelika
Home >> alabama/opelika >> concrete maintenance
Share this...