Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt surface in Oxford, Alabama


Concrete Maintenance installed in an unstable surface can quickly lead to difficulties. There are 3 main options for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than revealing severe cracks or crumbling, hot asphalt mix can be placed directly within your driveway. 1 aspect is elevation: make sure fences, garage flooring, and other structures are not compromised by the greater degree of the surface.
  2. Remove old driveway, peg to the floor: The existing driveway is completely removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Eliminate the old driveway and secure it to a solid surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix.

Our Services:

The best time to install Concrete Maintenance from Oxford

The more asphalt you operate, the more leeway you might have. For instance, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix is ​​still practical in this period, but the time is constrained.

How much does an Concrete Maintenance price in Oxford?

Consider the weather vagaries of our climate when choosing the standard of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt work.

Furthermore, it'll be good to distinguish the contractor should you own a recreational vehicle or even a van. He will need to accommodate the asphalt mixture so as to be more immune to the weight of heavy vehicles.

The Benefits of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt used along with the paving contractor.

To get a sustainable Concrete Maintenance

The existence of an asphalt paver may be up to 20 years, when the very best states are satisfied. We are referring to a professional paving contractor, a great quality of asphalt and also an optimal asphalt laying technique.

Concrete Maintenance in Oxford: price, quality of work and lifespan


The durability of residential asphalt paving largely depends on the standard of the laying. Indeed, the major causes of deformation or tearing of an asphalt coating are the absence of compaction plus a thin foundation. On the other hand, the maintenance of the asphalt pavement is also a deciding factor in its own longevity. That is to say, you will have to seal your driveway once in 10 years, at a minimum, in order to maintain its good condition.


We advise you to inform your asphalting builder if you choose to have your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for placing asphalt , in this circumstance.

Concrete Maintenance placing: price and contract

The option of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, then you'll have to select it carefully.

Our ensures and Concrete Maintenance work

Make sure the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever become the subject of complaints.

These details must be included in the arrangement:

- date of beginning and end of the work;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to be aware that a Concrete Maintenance contractor cannot demand you to make a down payment before work has begun. However, you need to agree to the payment provisions and be sure it's on the contract.

Prior to estimating the Concrete Maintenance drive to your new residence by a contractor, or acquiring some basic knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the inadequate thickness of the base are the two main sources for the deformation or ripping of a layer of asphalt. If it's a new driveway, then it must first be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set under the granular backfill if the soil turns out to be somewhat loamy (clayey). If you have a new house, it is ideal to wait 6 to 12 months prior to paving your driveway, to allow the soil to settle naturally. In the case of a fix of the entry, a simple replacement of the Concrete Maintenance layer can be considered if the contractor believes that the existing base is sufficient. In both scenarios, base redone or base preserved, the whole period of its guarantee must be the same.

Concrete Maintenance Oxford Alabama

The weather conditions in our beautiful province can have a devastating effect in an asphalt drive, hence the importance of adding a slope having a minimum slope of 2%. This will enable water to drain to the street and decrease the risk of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the onset of the job: he will have the ability to provide materials accordingly. Some asphalt mixtures produce an asphalt that is more resistant to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of 5 cm (2 ) after being compacted. For optimal stability, the base should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the setup of unwanted supports around the foundation is a fantastic method to avoid possible cracks and this Concrete Maintenance done in cold weather is going to be of inferior quality. It's therefore better to await the sunny days to return before beginning work.

A definite contract with your builder in Oxford

To avoid unpleasant surprises, then select your contractor and be certain the title and address of his company are composed about the contract. The start and finish dates of this work, as well as proof of this builder's liability insurance and also the technical details of this project to be carried out, should also be included. No contractor should need a deposit before work begins. To avoid the inconvenience that could cause unforeseen costs, visit the Concrete MaintenanceOxford site. You may thus have the resources in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Oxford - Greatest Alabama in Alabama!

For caliber asphalting perform , phone on Concrete Maintenance, Oxford specialist team. Confirm our Company section to find out the regions served.

Parking Lot Repair And Striping Oxford | Snow Removal Oxford
Home >> alabama/oxford >> concrete maintenance
Share this...