Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Oxford, Alabama


Snow Removal installed in an unstable surface could quickly lead to problems. There are 3 main choices for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than showing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 facet is height: make sure fences, garage floors, and other constructions aren't compromised by the greater level of this new surface.
  2. Eliminate old driveway, peg to the floor: The existing driveway is completely removed (or you may not have a driveway yet) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone floor partially replaces part of this hot asphalt mixture. Typically 6 to 8 inches of aggregate extends under 3 inches of asphalt.

Our Services:

The best time to install Snow Removal from Oxford

The more asphalt you work, the more leeway you might have. For example, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix remains functional in this period of time, but the time is constrained.

How much does an Snow Removal price in Oxford?

Consider the weather vagaries of the climate when choosing the quality of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt perform.

In addition, it'll be good to distinguish the contractor if you own a recreational vehicle or a van. He will need to adapt the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Snow Removal

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt employed and the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver may be around 20 years, when the very best states are satisfied. We are talking about a professional paving builder, a good grade of asphalt as well as also an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly is dependent on the standard of the placing. Indeed, the major causes of deformation or tearing of an asphalt coating are the lack of compaction plus a thin foundation. However, the upkeep of the asphalt pavement can be a deciding factor in its longevity. That's to say, you'll have to seal your drive once in 10 decades, at a minimum, so as to maintain its good condition.


We suggest that you inform your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It may not be essential to pay top dollar for placing asphalt , in this circumstance.

Snow Removal placing: price and contract

The option of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, you will have to choose it carefully.

Our guarantees and Snow Removal work

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

These details should be included in the arrangement:

- date of beginning and end of the work;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving contractor can't require that you make a deposit before work has begun. However, you need to agree to the payment provisions and make sure it's about the contract.

A solid base for Snow Removal- Oxford

Before redoing the asphalt driveway to your new residence by a contractor, or obtaining some fundamental knowledge is vital to guarantee that the job is well done. Know first that the absence of compaction and the inadequate thickness of the base are the two chief sources for the deformation or ripping of a coating of asphalt. When it's a new driveway, then it has to first be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane will be set under the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you own a new home, it's best to wait 6 to 12 months before paving your drive, to enable the soil to settle . In the event of a repair of this entry, a simple replacement of the asphalt coating can be considered in the event the contractor believes that the present base is sufficient. In both scenarios, base redone or foundation preserved, the duration of its warranty has to be the same.

Snow Removal Oxford Alabama

The weather conditions in our beautiful province may have a devastating effect on an asphalt driveway, hence the significance of adding a slope having a minimum slope of 2%. This will enable water to drain into the road and minimize the danger of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the start of the work: he is going to have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of 5 cm (2 ) after being compacted. For optimal stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the base is a good way to prevent possible cracks and this asphalting done in chilly weather will be of poor quality. It is therefore better to wait for the bright days to return before beginning work.

To avoid unpleasant surprises, choose your contractor and make sure that the title and address of the business are composed on the contract. The start and end dates of the job, as well as proof of the contractor's liability insurance and also the technical details of this job to be completed, should also be included. No contractor should require a down payment before work begins. To prevent the inconvenience that might lead to unforeseen costs, take a look at the Snow RemovalOxford website. You may thus have the resources in hand to successfully complete your asphalt paving project.

Snow Removal Oxford - Greatest Alabama at Alabama!

For caliber asphalting perform , call on Snow Removal, Oxford specialist team. Confirm our Company section to find out the regions served.

Concrete Maintenance Oxford | Tar And Chip Paving Oxford
Home >> alabama/oxford >> snow removal
Share this...