Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt Coating in Phenix City, Alabama


Snow Removal installed in an unstable surface can quickly lead to difficulties. There are three Chief choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not revealing serious cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is height: make certain fences, garage floors, and other constructions aren't compromised by the higher level of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is completely removed (or you might not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is placed right on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix.

The more asphalt you work, the more leeway you have. For example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix is ​​still functional during this period, but the time is limited.

How much does an Snow Removal cost in Phenix City?

Take into account the weather vagaries of the climate when choosing the quality of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt perform.

In addition, it will be good to tell the contractor should you have a recreational vehicle or a van. He might need to accommodate the asphalt mixture in order to be more resistant to the burden of heavy vehicles.

The Benefits of Snow Removal

  • Smooth end;
  • non invasive
  • easy to Keep
  • watertightness ensured
  • withstands the rigors of this Quebec climate quite well (provided it's been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt employed along with the paving contractor.

To get a sustainable Snow Removal

The existence of an asphalt paver can be up to 20 years, when the very best states are met. We are talking about a professional paving builder, a great quality of asphalt as well as also an optimal asphalt laying technique.

Snow Removal in Phenix City: price, quality of work and lifespan


The durability of residential asphalt paving largely depends on the quality of the laying. Indeed, the major causes of deformation or tearing of an asphalt coating are the absence of compaction plus a lean base. On the other hand, the maintenance of the asphalt sidewalk is also a determining factor in its own longevity. That's to say, you'll have to seal your drive once in ten years, at a minimum, so as to keep its great state.


We advise you to notify your asphalting contractor if you choose to have your driveway asphalt in order to sell your property. It might not be essential to pay top dollar for laying asphalt , in this case.

Snow Removal laying: price and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you will have to choose it carefully.

Make sure the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has been the subject of complaints.

These details must be included in the contract:

- date of beginning and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to know that a paving contractor can't require that you make a down payment before work has begun. But you should agree to the payment terms and be sure it is on the contract.

A solid foundation for Snow Removal- Phenix City

Prior to estimating the asphalt drive to your new residence by a builder, or obtaining some fundamental knowledge is imperative to guarantee that the job is done. Know first that the absence of compaction and the inadequate depth of the foundation are the two main causes of the deformation or tearing of a layer of asphalt. If it's a new driveway, it must first be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane will be set under the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new house, it is best to wait for 6 to 12 months prior to paving your driveway, to enable the soil to settle naturally. In the event of a repair of this entrance, a simple replacement of the asphalt coating can be considered in the event the contractor believes that the existing foundation is sufficient. In both scenarios, base redone or foundation preserved, the duration of its warranty has to be exactly the same.

Snow Removal Phenix City Alabama

The weather conditions in our lovely state can have a devastating effect in an asphalt drive, hence the importance of including a slope with a minimum slope of 2%. This will allow water to drain into the street and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the contractor before the onset of the job: he is going to have the ability to provide materials so. Some asphalt combinations produce an asphalt which is more resistant to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the installation of side supports around the foundation is a good method to avoid potential cracks and this asphalting done in chilly weather is going to be of inferior quality. It is therefore far better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, choose your contractor and make certain that the name and address of his business are composed about the contract. The start and end dates of the work, in addition to proof of the contractor's liability insurance and also the technical details of the job to be completed, should also be included. No contractor should need a down payment before work begins. To prevent the inconvenience that might cause unforeseen costs, visit the Snow RemovalPhenix City site. You may thus have the tools in hand to successfully complete your asphalt paving project.

Snow Removal Phenix City - Greatest Alabama at Alabama!

For caliber asphalting perform , call on Snow Removal, Phenix City professional team. Consult our Business department to figure out the regions served.

Concrete Maintenance Phenix City | Tar And Chip Paving Phenix City
Home >> alabama/phenix city >> snow removal
Share this...