Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt Coating in Pleasant Grove, Alabama


Parking Lot Repair And Striping installed in an unstable surface can quickly lead to difficulties. There are 3 Chief choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. One aspect is elevation: make sure fences, garage flooring, and other constructions aren't jeopardized by the greater degree of this new surface.
  2. Eliminate old driveway, peg to the ground: The existing driveway is totally eliminated (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Parking Lot Repair And Striping from Pleasant Grove

The more asphalt you operate, the more leeway you have. For example, in 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. In general, for lean asphalt applications (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix remains practical in this period of time, but the time is constrained.

How much can an Parking Lot Repair And Striping cost in Pleasant Grove?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

In addition, it will be useful to distinguish the contractor should you have a recreational vehicle or a van. He will have to accommodate the asphalt mixture so as to be more resistant to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver can be up to 20 decades, when the best conditions are met. We are talking about a professional paving contractor, a great grade of asphalt and an optimal asphalt laying technique.

Parking Lot Repair And Striping in Pleasant Grove: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly depends on the quality of the laying. Indeed, the major causes of deformation or tearing of an asphalt layer are the absence of compaction and a thin foundation. However, the maintenance of the asphalt pavement is also a deciding factor in its longevity. That is to say, you'll need to seal your driveway once in 10 years, at a minimum, so as to keep its great state.


We suggest that you notify your asphalting builder if you decide to have your driveway asphalt in order to offer your property. It might not be necessary to pay top dollar for laying asphalt , in such a case.

Parking Lot Repair And Striping placing: cost and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, you'll need to select it carefully.

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the contract:

- date of beginning and end of the work;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You should know that a paving builder cannot require you to make a deposit before work has started. But you need to agree on the payment terms and be sure it's on the contract.

A strong base for Parking Lot Repair And Striping- Pleasant Grove

Prior to estimating the asphalt drive to your new home by a builder, or acquiring some basic knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient thickness of the base are the two chief causes of the deformation or tearing of a layer of asphalt. When it's a new driveway, it must initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be set under the granular backfill if the dirt turns out to be very loamy (clayey). If you have a new house, it's ideal to wait 6 to 12 months before paving your driveway, to enable the soil to settle . In the event of a fix of the entry, an easy replacement of the asphalt layer can be considered in the event the contractor considers that the existing base is sufficient. In both scenarios, base redone or base preserved, the whole period of its guarantee must be exactly the same.

Parking Lot Repair And Striping Pleasant Grove Alabama

The weather conditions in our beautiful province can have a devastating effect in an asphalt driveway, hence the importance of including a slope with a minimum slope of 2%. This will allow water to drain into the street and minimize the danger of heaving or cracking. This important detail has to be taken into consideration when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder before the onset of the work: he is going to have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the base should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the foundation is a good way to prevent possible cracks and that asphalting done in chilly weather will be of inferior quality. It's therefore far better to wait for the sunny days to go back before beginning work.

To avoid unpleasant surprises, then choose your contractor diligently and be sure that the title and address of the business are written on the contract. The start and finish dates of the job, as well as proof of the contractor's liability insurance and the technical specifics of the job to be carried out, should also be included. No contractor should need a down payment before work begins. To avoid the inconvenience that could cause unforeseen costs, visit the Parking Lot Repair And StripingPleasant Grove site. You will thus have the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Pleasant Grove - Greatest Alabama in Alabama!

For caliber asphalting work , phone on Parking Lot Repair And Striping, Pleasant Grove professional team. We have over 20 decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company department to find out the regions served.

Asphalt Pleasant Grove | Concrete Maintenance Pleasant Grove
Home >> alabama/pleasant grove >> parking lot repair and Striping