Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Options for the asphalt Coating in Prichard, Alabama


Asphalt installed in an unstable surface could quickly lead to problems. There are three main options for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than revealing serious cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is elevation: make sure fences, garage floors, and other constructions are not jeopardized by the greater level of the surface.
  2. Remove old driveway, counter into the ground: The existing driveway is totally eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Remove the old driveway and secure it into a solid surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix. Typically 6 to 8 inches of aggregate goes under 3 inches of asphalt.

Our Services:

The best time to install Asphalt from Prichard

The longer asphalt you work, the more leeway you have. By way of instance, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still practical during this period of time, however, the time is constrained.

How much can an Asphalt cost in Prichard?

Consider the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

In addition, it'll be useful to tell the contractor if you have a recreational vehicle or even a van. He will have to accommodate the asphalt mixture so as to be more resistant to the burden of heavy vehicles.

The Benefits of Asphalt

  • Smooth finish;
  • non invasive
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it has been set up optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt used along with the paving contractor.

To get a sustainable Asphalt

The existence of an asphalt paver can be up to 20 decades, when the very best states are satisfied. We are referring to a professional paving builder, a good quality of asphalt as well as also an optimal asphalt laying technique.

Asphalt in Prichard: cost, quality of work and lifespan


The durability of residential asphalt paving largely depends upon the standard of the placing. Indeed, the major causes of deformation or ripping of an asphalt layer are the lack of compaction plus a thin foundation. On the other hand, the maintenance of the asphalt sidewalk is also a deciding factor in its longevity. That's to say, you will have to seal your drive once in ten decades, at a minimum, in order to keep its great state.


We advise you to inform your asphalting builder if you choose to get your driveway asphalt in order to sell your property. It may not be necessary to pay top dollar for placing asphalt , in this case.

Asphalt laying: price and contract

The option of the asphalt laying builder is essential. In order not to have unpleasant surprises, then you will have to select it carefully.

Our ensures and Asphalt work

Guarantee that the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

The following details must be included in the contract:

- date of beginning and finish of the work;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should know that a paving contractor can't demand you to make a down payment before work has begun. But you should agree to the payment terms and make sure it's on the contract.

Prior to estimating the asphalt driveway to your new home by a builder, or acquiring some basic knowledge is vital to guarantee that the job is well done. Know first that the absence of compaction and the insufficient thickness of the foundation are the two main sources for the deformation or ripping of a coating of asphalt. When it is a new driveway, it has to first be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane is going to be set beneath the granular backfill if the soil turns out to be very loamy (clayey). If you have a new home, it's best to wait 6 to 12 months prior to paving your drive, to enable the dirt to settle naturally. In the case of a repair of the entrance, a simple replacement of the asphalt layer can be considered if the contractor considers that the present base is adequate. In both scenarios, foundation redone or foundation preserved, the duration of its guarantee must be exactly the same.

Asphalt Prichard Alabama

The weather conditions in our lovely state can have a disastrous impact in an asphalt driveway, thus the importance of including a slope having a minimum slope of 2%. This will allow water to drain into the road and minimize the risk of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder prior to the onset of the job: he is going to have the ability to supply materials so. Some asphalt combinations produce an asphalt that is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the setup of unwanted supports around the foundation is a good way to prevent possible cracks and this asphalting done in cold weather is going to be of poor quality. It is therefore far better to await the bright days to go back before beginning work.

To avoid unpleasant surprises, then select your contractor diligently and make sure that the title and address of the business are composed on the contract. The start and finish dates of this job, as well as proof of this builder's liability insurance and the technical details of this project to be carried out, should also be included. No contractor should require a deposit before work starts. To prevent the inconvenience that could lead to unforeseen costs, visit the AsphaltPrichard website. You may thus have the tools in hand to successfully complete your asphalt paving project.

Asphalt Prichard - Best Alabama in Alabama!

For caliber asphalting work , phone on Asphalt, Prichard specialist team. Consult our Business department to figure out the regions served.

Tar And Chip Paving Prichard | Parking Lot Repair And Striping Prichard
Home >> alabama/prichard >> asphalt
Share this...