Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Options for the asphalt Coating in Saks, Alabama


Asphalt installed on an unstable surface could quickly lead to problems. There are 3 main options for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than revealing serious fractures or crumbling, hot asphalt mix can be laid directly over your driveway. One aspect is height: make sure fences, garage floors, and other structures are not compromised by the greater level of this new surface.
  2. Remove old driveway, counter into the ground: The existing driveway is totally removed (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Remove the old driveway and secure it into a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Asphalt in Saks

The longer asphalt you operate, the more leeway you have. By way of instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to speak to your contractor. The hot mix remains functional during this period of time, but the time is constrained.

How much does an Asphalt cost in Saks?

Consider the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it will be good to tell the contractor should you have a recreational vehicle or even a van. He will need to adapt the asphalt mix so as to be more resistant to the burden of heavy vehicles.

The Benefits of Asphalt

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the characteristic of the asphalt employed and the paving contractor.

To get a sustainable Asphalt

The existence of an asphalt paver can be up to 20 years, when the very best conditions are met. We're referring to a professional paving builder, a good quality of asphalt as well as an optimal asphalt laying technique.


The longevity of residential asphalt paving largely depends upon the standard of the laying. Indeed, the major causes of deformation or tearing of an asphalt layer are the absence of compaction and a lean base. On the other hand, the maintenance of the asphalt pavement can be a deciding factor in its own longevity. That is to say, you'll have to seal your drive once in ten years, at a minimum, so as to maintain its great condition.


We suggest that you notify your asphalting contractor if you decide to have your driveway asphalt in order to offer your property. It may not be essential to pay top dollar for placing asphalt , in such a circumstance.

Asphalt laying: price and contract

The option of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you will have to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever been the subject of complaints.

These details should be included in the arrangement:

- date of start and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to be aware that a paving contractor cannot demand you to make a deposit before work has started. However, you need to agree on the payment terms and make sure it's on the contract.

Prior to estimating the asphalt drive to your new home by a contractor, or acquiring some basic knowledge is vital to guarantee that the job is done. Know first that the absence of compaction and the inadequate thickness of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. If it is a new driveway, it has to initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane will be set under the granular backfill if the dirt turns out to be very loamy (clayey). If you own a new house, it's best to wait for 6 to 12 months before paving your drive, to allow the dirt to settle . In the event of a repair of this entrance, an easy replacement of the asphalt layer can be considered if the contractor considers that the present base is adequate. In both cases, foundation redone or foundation preserved, the whole period of its warranty has to be exactly the same.

Asphalt Saks Alabama

The weather conditions in our lovely state may have a disastrous impact on an asphalt drive, thus the significance of including a slope with a minimum slope of 2%. This will enable water to drain to the street and minimize the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the start of the job: he will be able to provide materials so. Some asphalt mixtures produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the foundation is a good way to prevent potential cracks and this asphalting done in chilly weather is going to be of poor quality. It's therefore better to wait for the bright days to return before starting work.

To avoid unpleasant surprises, choose your contractor diligently and be sure that the title and address of his business are written on the contract. The beginning and finish dates of the work, in addition to proof of the builder's liability insurance and also the technical specifics of the job to be carried out, should also be included. No contractor should require a down payment before work begins. To avoid the inconvenience that might cause unforeseen costs, visit the AsphaltSaks site. You may thus have the resources in hand to successfully finish your asphalt paving project.

Asphalt Saks - Best Alabama at Alabama!

For quality asphalting perform , call on Asphalt, Saks specialist team. Confirm our Company department to figure out the regions served.

Tar And Chip Paving Saks | Parking Lot Repair And Striping Saks
Home >> alabama/saks >> asphalt
Share this...