Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Tar And Chip Paving- Alternatives for the asphalt surface in Saraland, Alabama


Tar And Chip Paving installed in an unstable surface could quickly lead to difficulties. There are 3 main options for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not showing serious cracks or crumbling, hot asphalt mix can be laid directly over your driveway. One facet is elevation: make certain fences, garage flooring, and other constructions aren't jeopardized by the higher level of the new surface.
  2. Remove old driveway, counter into the ground: The existing driveway is completely eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and secure it into a good surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Tar And Chip Paving from Saraland

The longer asphalt you operate, the more leeway you have. By way of instance, in 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still functional during this period of time, but the time is constrained.

How much does an Tar And Chip Paving cost in Saraland?

Take into account the weather vagaries of the climate when deciding upon the quality of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt perform.

In addition, it will be useful to tell the contractor should you have a recreational vehicle or even a van. He might need to adapt the asphalt mixture in order to be more resistant to the weight of heavy vehicles.

The Benefits of Tar And Chip Paving

  • Smooth finish;
  • non invasive
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it has been installed optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt employed and the paving contractor.

To get a sustainable Tar And Chip Paving

The life of an asphalt paver may be up to 20 decades, when the best conditions are satisfied. We're talking about a professional paving contractor, a good quality of asphalt and also an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly is dependent upon the quality of the laying. Indeed, the major causes of deformation or tearing of an asphalt coating are the lack of compaction plus a thin foundation. However, the upkeep of the asphalt sidewalk can be a deciding factor in its own longevity. That is to say, you will need to seal your driveway once in ten years, at a minimum, so as to maintain its good condition.


We suggest that you notify your asphalting builder if you decide to get your driveway asphalt in order to sell your property. It might not be necessary to pay top dollar for placing asphalt , in this circumstance.

Tar And Chip Paving placing: price and contract

The choice of the asphalt laying builder is essential. In order not to have unpleasant surprises, then you'll need to select it carefully.

Our guarantees and Tar And Chip Paving work

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of start and end of the work;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to know that a paving contractor cannot demand that you make a deposit before work has started. But you need to agree on the payment terms and make sure it's on the contract.

Before redoing the asphalt drive to your new residence by a contractor, or acquiring some basic knowledge is vital to make sure the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two chief causes of the deformation or tearing of a layer of asphalt. If it's a new driveway, it has to first be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane is going to be placed beneath the granular backfill if the soil turns out to be very loamy (clayey). If you own a new home, it is ideal to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle naturally. In the event of a fix of the entrance, a simple replacement of the asphalt layer can be considered in the event the contractor considers that the existing base is adequate. In both cases, foundation redone or foundation preserved, the whole period of its guarantee has to be exactly the same.

Tar And Chip Paving Saraland Alabama

The weather conditions in our beautiful province may have a devastating effect in an asphalt driveway, thus the significance of including a slope having a minimum slope of 2%. This will enable water to drain into the street and minimize the risk of heaving or cracking. This important detail has to be taken into consideration when excavating and maintained during backfilling.

If you have a van or recreational vehicle, notify the builder prior to the onset of the job: he will have the ability to provide materials accordingly. Some asphalt combinations produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the foundation is a fantastic method to prevent possible cracks and this asphalting done in chilly weather is going to be of poor quality. It's therefore far better to await the sunny days to go back before starting work.

A definite contract with your builder in Saraland

To avoid unpleasant surprises, choose your contractor diligently and make certain that the name and address of the company are written about the contract. The start and finish dates of this job, in addition to evidence of this builder's liability insurance and the technical specifics of the project to be completed, should also be included. No contractor should need a deposit before work starts. To prevent the inconvenience that could lead to unforeseen expenses, visit the Tar And Chip PavingSaraland website. You will thus have all the resources in hand to successfully complete your asphalt paving project.

Tar And Chip Paving Saraland - Greatest Alabama at Alabama!

For quality asphalting work , call on Tar And Chip Paving, Saraland professional team. We've got more than 20 decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business department to find out the regions served.

Snow Removal Saraland | Asphalt Saraland
Home >> alabama/saraland >> tar and chip paving
Share this...