Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Scottsboro, Alabama


Snow Removal installed in an unstable surface can quickly lead to problems. There are 3 Chief choices for the Simple installation:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not showing serious fractures or crumbling, hot asphalt mix can be placed directly within your driveway. 1 facet is elevation: make sure fences, garage flooring, and other constructions are not jeopardized by the higher degree of this new surface.
  2. Eliminate old driveway, counter into the ground: The existing driveway is completely removed (or you may not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mix. Typically 6 to 8 inches of aggregate goes under 3 inches of asphalt.

The longer asphalt you operate, the more leeway you have. By way of instance, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to speak to your contractor. The hot mix is ​​still practical during this period of time, but the time is constrained.

How much does an Snow Removal price in Scottsboro?

Take into account the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations we experience cause considerable damage to asphalt perform.

In addition, it'll be good to distinguish the contractor if you have a recreational vehicle or a van. He might have to accommodate the asphalt mix so as to be more resistant to the burden of heavy vehicles.

The Benefits of Snow Removal

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used and the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver can be around 20 decades, when the very best states are satisfied. We're talking about a professional paving contractor, a great grade of asphalt and an optimal asphalt laying technique.

Snow Removal in Scottsboro: price, quality of work and lifespan


The longevity of residential asphalt paving chiefly depends on the quality of the placing. Indeed, the major causes of deformation or ripping of an asphalt coating are the lack of compaction plus a thin foundation. On the other hand, the upkeep of the asphalt sidewalk can be a deciding factor in its own longevity. That is to say, you will need to seal your driveway once in 10 years, at a minimum, so as to maintain its good state.


We advise you to notify your asphalting builder in case you choose to get your driveway asphalt in order to offer your property. It might not be necessary to pay top dollar for placing asphalt , in such a case.

Snow Removal placing: cost and contract

The choice of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, then you will have to choose it carefully.

Our ensures and Snow Removal work

Guarantee that the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has ever been the subject of complaints.

The following details should be included in the arrangement:

- date of start and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You should know that a paving contractor cannot demand that you make a deposit before work has begun. But you should agree to the payment terms and be sure it is on the contract.

A strong foundation for Snow Removal- Scottsboro

Before redoing the asphalt driveway to your new home by a contractor, or obtaining some basic knowledge is vital to guarantee that the job is well done. Know first that the absence of compaction and the insufficient thickness of the base are the two main causes of the deformation or ripping of a coating of asphalt. When it is a new driveway, it has to initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane will be set beneath the granular backfill if the dirt proves to be very loamy (clayey). If you own a new home, it's ideal to wait 6 to 12 months before paving your drive, to enable the dirt to settle . In the event of a fix of the entry, an easy replacement of the asphalt coating can be considered in the event the contractor believes that the existing foundation is sufficient. In both cases, base redone or foundation preserved, the whole period of its guarantee must be exactly the same.

Snow Removal Scottsboro Alabama

The weather conditions in our beautiful province may have a devastating effect in an asphalt drive, thus the importance of adding a slope with a minimum slope of 2%. This will enable water to drain into the road and decrease the risk of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor before the start of the work: he is going to have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the installation of unwanted supports around the base is a fantastic method to avoid possible cracks and this asphalting done in chilly weather will be of poor quality. It's therefore better to await the bright days to return before starting work.

A definite contract with your contractor in Scottsboro

To avoid unpleasant surprises, then choose your contractor and make certain the title and address of the business are composed about the contract. The start and end dates of this job, in addition to evidence of this contractor's liability insurance and also the technical specifics of this job to be carried out, should also be included. No contractor should require a down payment before work begins. To prevent the inconvenience that could cause unforeseen costs, take a look at the Snow RemovalScottsboro site. You may thus have all the resources in hand to successfully complete your asphalt paving project.

Snow Removal Scottsboro - Best Alabama in Alabama!

For caliber asphalting work , call on Snow Removal, Scottsboro professional team. Confirm our Company section to find out the regions served.

Concrete Maintenance Scottsboro | Tar And Chip Paving Scottsboro
Home >> alabama/scottsboro >> snow removal
Share this...