Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt Coating in Talladega, Alabama


Parking Lot Repair And Striping installed on an unstable surface could quickly lead to difficulties. There are three main choices for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not showing severe cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. One facet is height: make sure fences, garage floors, and other constructions aren't jeopardized by the greater degree of this new surface.
  2. Remove old driveway, counter into the floor: The present driveway is completely eliminated (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Eliminate the old driveway and fasten it into a solid surface. This is actually the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mixture. Generally 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Parking Lot Repair And Striping in Talladega

The more asphalt you work, the more leeway you have. By way of instance, in 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to consult with your contractor. The hot mix remains functional during this period of time, but the time is constrained.

How much can an Parking Lot Repair And Striping price in Talladega?

Take into account the weather vagaries of our climate when choosing the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it'll be useful to tell the contractor if you have a recreational vehicle or even a van. He might need to accommodate the asphalt mix in order to be more immune to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

  • Smooth finish;
  • non-slip
  • easy to maintain
  • watertightness ensured
  • withstands the rigors of this Quebec climate quite well (provided it has been installed );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt used and the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver may be up to 20 decades, when the best states are satisfied. We are talking about a professional paving builder, a great quality of asphalt as well as also an optimal asphalt laying technique.


The durability of residential asphalt paving largely is dependent upon the quality of the placing. Really, the major causes of deformation or tearing of an asphalt layer are the lack of compaction plus a lean base. However, the upkeep of the asphalt sidewalk is also a deciding factor in its own longevity. That is to say, you'll need to seal your driveway once in ten decades, at a minimum, in order to maintain its great condition.


We suggest that you notify your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for placing asphalt , in this circumstance.

Parking Lot Repair And Striping laying: cost and contract

The choice of the asphalt laying builder is essential. In order not to have unpleasant surprises, then you'll have to select it carefully.

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the arrangement:

- date of start and end of the work;

- evidence of insurance;

- technical details;

- RBQ certification number.

You ought to be aware that a paving contractor can't demand you to make a down payment before work has started. But you need to agree to the payment provisions and make sure it's on the contract.

A strong foundation for Parking Lot Repair And Striping- Talladega

Prior to estimating the asphalt driveway to your new home by a builder, or obtaining some fundamental knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient depth of the foundation are the two main sources for the deformation or tearing of a layer of asphalt. If it is a new driveway, then it has to initially be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane will be set under the granular backfill if the soil turns out to be very loamy (clayey). If you have a new home, it is best to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle . In the case of a fix of this entrance, an easy replacement of the asphalt layer can be considered if the contractor considers that the existing base is adequate. In both scenarios, base redone or base maintained, the duration of its warranty must be exactly the same.

Parking Lot Repair And Striping Talladega Alabama

The weather conditions in our beautiful province can have a disastrous impact on an asphalt driveway, hence the importance of including a slope with a minimum slope of 2%. This will allow water to drain into the street and minimize the risk of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

In case you've got a van or recreational vehicle, notify the builder prior to the start of the work: he will have the ability to provide materials so. Some asphalt mixtures produce an asphalt that is more resistant to heavy-duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the foundation is a fantastic way to prevent possible cracks and this asphalting done in chilly weather will be of inferior quality. It's therefore better to await the bright days to return before starting work.

To avoid unpleasant surprises, then choose your contractor diligently and make certain the name and address of the business are written on the contract. The beginning and end dates of this job, in addition to evidence of the contractor's liability insurance and also the technical specifics of the project to be carried out, should also be included. No contractor should need a down payment before work begins. To prevent the inconvenience that might lead to unforeseen expenses, visit the Parking Lot Repair And StripingTalladega website. You may thus have all the tools in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Talladega - Best Alabama at Alabama!

For caliber asphalting work , phone on Parking Lot Repair And Striping, Talladega professional team. We've got over 20 decades of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to figure out the regions served.

Asphalt Talladega | Concrete Maintenance Talladega
Home >> alabama/talladega >> parking lot repair and Striping
Share this...