Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Alternatives for the asphalt surface in Tillmans Corner, Alabama


Asphalt installed on an unstable surface can quickly lead to difficulties. There are 3 main options for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing severe fractures or crumbling, hot asphalt mix can be laid directly over your driveway. 1 aspect is height: make sure fences, garage floors, and other constructions are not jeopardized by the greater degree of the surface.
  2. Eliminate old driveway, peg to the ground: The existing driveway is completely eliminated (or you may not have a driveway yet) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Eliminate the old driveway and fasten it to a solid surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix.

Our Services:

The best time to install Asphalt in Tillmans Corner

The more asphalt you operate, the more leeway you have. By way of example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. Generally, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix remains functional in this period, however, the time is constrained.

How much does an Asphalt price in Tillmans Corner?

Consider the weather vagaries of the climate when choosing the quality of asphalt. The significant temperature variations we experience cause considerable damage to asphalt perform.

Furthermore, it will be good to distinguish the contractor should you own a recreational vehicle or a van. He might have to accommodate the asphalt mixture in order to be more resistant to the burden of heavy vehicles.

The advantages of Asphalt

  • Smooth finish;
  • non invasive
  • easy to maintain
  • watertightness ensured
  • withstands the rigors of this Quebec climate very well (provided it's been installed );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt used and the paving contractor.

To get a sustainable Asphalt

The life of an asphalt paver can be around 20 years, when the very best conditions are met. We're referring to a professional paving contractor, a good grade of asphalt and also an optimal asphalt laying technique.


The longevity of residential asphalt paving largely depends upon the standard of the laying. Really, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction plus a thin foundation. However, the maintenance of the asphalt pavement is also a determining factor in its own longevity. That's to say, you'll need to seal your drive once in 10 decades, at a minimum, so as to keep its great state.


We suggest that you notify your asphalting contractor in case you choose to have your driveway asphalt in order to offer your property. It may not be necessary to pay top dollar for laying asphalt , in this circumstance.

Asphalt laying: price and contract

The choice of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, you'll have to select it carefully.

Our guarantees and Asphalt work

Make sure the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has become the subject of complaints.

The following details must be included in the contract:

- date of start and finish of the job;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should be aware that a paving builder can't demand that you make a deposit before work has begun. However, you should agree to the payment provisions and make sure it's on the contract.

Prior to estimating the asphalt driveway to your new residence by a builder, or obtaining some fundamental knowledge is imperative to make sure the job is well done. Know first that the absence of compaction and the insufficient thickness of the base are the two chief sources for the deformation or ripping of a layer of asphalt. When it is a new driveway, then it must first be excavated to make room for a coating of crushed stone of sufficient thickness. A geotextile membrane will be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you have a new house, it is best to wait 6 to 12 months prior to paving your driveway, to allow the dirt to settle . In the case of a repair of this entry, an easy replacement of the asphalt layer can be considered if the contractor believes that the existing foundation is sufficient. In both cases, base redone or base preserved, the duration of its guarantee must be the same.

Asphalt Tillmans Corner Alabama

The weather conditions in our beautiful province may have a disastrous impact in an asphalt driveway, thus the significance of including a slope having a minimum slope of 2%. This will allow water to drain to the road and minimize the risk of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder before the start of the job: he is going to be able to supply materials so. Some asphalt mixtures produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the base should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the setup of unwanted supports around the base is a good method to avoid possible cracks and this asphalting done in cold weather will be of poor quality. It's therefore better to await the sunny days to return before beginning work.

To avoid unpleasant surprises, then select your contractor diligently and make certain that the name and address of his business are composed about the contract. The beginning and end dates of the job, as well as evidence of the builder's liability insurance and also the technical details of this project to be completed, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that could lead to unforeseen costs, take a look at the AsphaltTillmans Corner website. You may thus have the tools in hand to successfully finish your asphalt paving project.

Asphalt Tillmans Corner - Greatest Alabama in Alabama!

For caliber asphalting perform , call on Asphalt, Tillmans Corner professional team. We have more than twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Consult our Company department to figure out the regions served.

Tar And Chip Paving Tillmans Corner | Parking Lot Repair And Striping Tillmans Corner
Home >> alabama/tillmans corner >> asphalt
Share this...