Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt Coating in Vestavia Hills, Alabama


Concrete Maintenance installed on an unstable surface could quickly lead to problems. There are 3 Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing serious cracks or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is height: make certain fences, garage flooring, and other structures are not jeopardized by the greater degree of the new surface.
  2. Eliminate old driveway, counter into the ground: The existing driveway is totally eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it to a solid surface. This is the preferred method. An aggregated stone floor partially replaces part of this hot asphalt mixture.

Our Services:

The best time to install Concrete Maintenance in Vestavia Hills

The more asphalt you work, the more leeway you have. By way of instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional during this period, but the time is limited.

How much does an Concrete Maintenance cost in Vestavia Hills?

Take into account the weather vagaries of the climate when deciding upon the quality of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt perform.

Furthermore, it will be good to tell the contractor if you have a recreational vehicle or even a van. He will need to adapt the asphalt mix in order to be more immune to the burden of heavy vehicles.

The advantages of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the characteristic of the asphalt used along with the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver may be up to 20 years, when the best states are satisfied. We are talking about a professional paving builder, a great quality of asphalt as well as an optimal asphalt laying technique.

Concrete Maintenance in Vestavia Hills: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the quality of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction and a lean base. On the other hand, the upkeep of the asphalt sidewalk can be a determining factor in its longevity. That is to say, you'll need to seal your drive once in ten decades, at a minimum, so as to keep its good condition.


We suggest that you notify your asphalting contractor if you decide to get your driveway asphalt in order to sell your property. It may not be necessary to pay top dollar for placing asphalt , in this case.

Concrete Maintenance placing: price and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, you will have to choose it carefully.

Our guarantees and Concrete Maintenance work

Guarantee that the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has been the subject of complaints.

The following details should be included in the contract:

- date of beginning and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You should be aware that a Concrete Maintenance builder cannot demand that you make a down payment before work has begun. However, you should agree on the payment provisions and be sure it's about the contract.

Before redoing the Concrete Maintenance driveway to your new residence by a builder, or obtaining some fundamental knowledge is vital to make sure the job is done. Know first that the lack of compaction and the insufficient depth of the foundation are the two chief sources for the deformation or ripping of a coating of asphalt. When it is a new driveway, it must initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you have a new home, it is ideal to wait 6 to 12 months before paving your drive, to enable the soil to settle naturally. In the event of a fix of the entrance, an easy replacement of the Concrete Maintenance layer can be considered in the event the contractor believes that the present base is adequate. In both scenarios, base redone or foundation preserved, the whole period of its guarantee must be exactly the same.

Concrete Maintenance Vestavia Hills Alabama

The weather conditions in our beautiful province may have a disastrous impact in an asphalt driveway, thus the importance of including a slope having a minimum slope of 2%. This will allow water to drain into the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the contractor prior to the onset of the work: he will have the ability to provide materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the installation of side supports around the foundation is a good method to prevent possible cracks and this Concrete Maintenance done in cold weather is going to be of inferior quality. It's therefore far better to wait for the bright days to return before starting work.

A definite contract with your builder in Vestavia Hills

To avoid unpleasant surprises, select your contractor and make certain the title and address of his business are composed about the contract. The start and end dates of this work, as well as evidence of the builder's liability insurance and the technical specifics of the job to be completed, should also be included. No contractor should need a deposit before work starts. To prevent the inconvenience that could lead to unforeseen costs, take a look at the Concrete MaintenanceVestavia Hills website. You may thus have the tools in hand to successfully finish your Concrete Maintenance project.

Concrete Maintenance Vestavia Hills - Best Alabama in Alabama!

For caliber asphalting work , call on Concrete Maintenance, Vestavia Hills specialist team. We've got over 20 decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business department to find out the regions served.

Parking Lot Repair And Striping Vestavia Hills | Snow Removal Vestavia Hills
Home >> alabama/vestavia hills >> concrete maintenance
Share this...