Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Options for the asphalt surface in Vestavia Hills, Alabama


Concrete Maintenance installed in an unstable surface could quickly lead to difficulties. There are three Chief choices for the Simple installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than showing serious cracks or crumbling, hot asphalt mix can be laid directly over your driveway. 1 aspect is elevation: make certain fences, garage flooring, and other constructions are not compromised by the higher level of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Remove the old driveway and secure it into a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mixture.

Our Services:

The best time to install Concrete Maintenance in Vestavia Hills

The longer asphalt you work, the more leeway you have. For example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix is ​​still functional in this period, but the time is limited.

How much can an Concrete Maintenance price in Vestavia Hills?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

Furthermore, it'll be useful to distinguish the contractor should you own a recreational vehicle or a van. He will need to adapt the asphalt mix in order to be more immune to the weight of heavy vehicles.

The advantages of Concrete Maintenance

  • Smooth finish;
  • non invasive
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of the Quebec climate very well (provided it has been set up );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed and the paving contractor.

For a sustainable Concrete Maintenance

The existence of an asphalt paver may be up to 20 years, when the very best states are satisfied. We're talking about a professional paving builder, a good grade of asphalt and an optimal asphalt laying technique.

Concrete Maintenance in Vestavia Hills: price, quality of work and lifespan


The longevity of residential asphalt paving largely is dependent on the standard of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a thin foundation. On the other hand, the upkeep of the asphalt pavement can be a determining factor in its own longevity. That's to say, you will need to seal your drive once in ten decades, at a minimum, so as to keep its great state.


We suggest that you inform your asphalting builder in case you choose to get your driveway asphalt in order to sell your property. It may not be essential to pay top dollar for laying asphalt , in this case.

Concrete Maintenance placing: price and contract

The choice of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, then you will have to select it carefully.

Our guarantees and Concrete Maintenance work

Guarantee that the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever become the subject of complaints.

These details should be included in the arrangement:

- date of beginning and end of the job;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to know that a Concrete Maintenance builder can't require that you make a down payment before work has started. But you should agree on the payment terms and make sure it's on the contract.

A solid base for Concrete Maintenance- Vestavia Hills

Prior to estimating the Concrete Maintenance driveway to your new home by a builder, or obtaining some basic knowledge is vital to guarantee that the job is done. Know first that the absence of compaction and the inadequate thickness of the base are the two chief sources for the deformation or tearing of a layer of asphalt. When it is a new driveway, it must initially be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane will be set under the granular backfill if the dirt turns out to be very loamy (clayey). If you own a new home, it's ideal to wait for 6 to 12 months prior to paving your drive, to allow the dirt to settle . In the case of a repair of this entrance, a simple replacement of the Concrete Maintenance layer can be considered if the contractor believes that the existing base is adequate. In both scenarios, base redone or base preserved, the duration of its guarantee has to be the same.

Concrete Maintenance Vestavia Hills Alabama

The weather conditions in our beautiful province may have a devastating effect in an asphalt drive, hence the importance of including a slope with a minimum slope of 2%. This will allow water to drain to the road and minimize the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

In case you've got a van or recreational vehicle, notify the contractor prior to the onset of the job: he will have the ability to provide materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the base should extend over the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also note that the installation of side supports around the base is a good way to prevent possible cracks and that Concrete Maintenance done in chilly weather is going to be of poor quality. It's therefore far better to wait for the sunny days to return before beginning work.

A Concrete Maintenance contract with your contractor in Vestavia Hills

To avoid unpleasant surprises, select your contractor diligently and be certain the title and address of his business are composed on the contract. The beginning and finish dates of the work, as well as proof of this contractor's liability insurance and also the technical details of the job to be carried out, should also be included. No contractor should require a deposit before work begins. To prevent the inconvenience that could lead to unforeseen expenses, visit the Concrete MaintenanceVestavia Hills site. You may thus have all the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Vestavia Hills - Best Alabama in Alabama!

For quality asphalting perform , phone on Concrete Maintenance, Vestavia Hills specialist team. Confirm our Business section to find out the regions served.

Parking Lot Repair And Striping Vestavia Hills | Snow Removal Vestavia Hills
Home >> alabama/vestavia hills >> concrete maintenance
Share this...