Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt Coating in Anchorage, Alaska


Parking Lot Repair And Striping installed in an unstable surface could quickly lead to difficulties. There are 3 main choices for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not showing severe cracks or crumbling, hot asphalt mixture can be placed directly within your driveway. One facet is height: make sure fences, garage floors, and other structures are not compromised by the greater degree of this new surface.
  2. Eliminate old driveway, counter into the ground: The existing driveway is totally removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mix.

Our Services:

The best time to install Parking Lot Repair And Striping from Anchorage

The longer asphalt you operate, the more leeway you have. By way of example, in 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix remains practical during this period of time, however, the time is constrained.

How much does an Parking Lot Repair And Striping cost in Anchorage?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

Furthermore, it will be useful to tell the contractor if you have a recreational vehicle or a van. He will need to adapt the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt used and the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver can be up to 20 decades, when the very best states are satisfied. We're referring to a professional paving contractor, a good grade of asphalt as well as an optimal asphalt laying technique.

Parking Lot Repair And Striping in Anchorage: cost, quality of work and lifespan


The durability of residential asphalt paving largely is dependent upon the quality of the laying. Indeed, the major causes of deformation or ripping of an asphalt coating are the lack of compaction plus a lean base. However, the upkeep of the asphalt pavement can be a determining factor in its own longevity. That's to say, you'll need to seal your drive once in 10 decades, at a minimum, in order to maintain its great state.


We suggest that you notify your asphalting builder in case you decide to get your driveway asphalt so as to offer your property. It may not be essential to pay top dollar for placing asphalt , in such a circumstance.

Parking Lot Repair And Striping laying: price and contract

The option of the asphalt laying contractor is indispensable. In order to not have unpleasant surprises, you will need to choose it carefully.

Our ensures and Parking Lot Repair And Striping work

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever been the subject of complaints.

These details must be included in the arrangement:

- date of beginning and end of the work;

- evidence of insurance;

- technical details;

- RBQ certification number.

You ought to be aware that a paving builder can't require that you make a deposit before work has begun. However, you should agree to the payment provisions and be sure it's on the contract.

Prior to estimating the asphalt driveway to your new home by a contractor, or obtaining some fundamental knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the insufficient thickness of the base are the two chief causes of the deformation or ripping of a layer of asphalt. If it is a new driveway, then it has to first be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be placed beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new home, it is ideal to wait 6 to 12 months before paving your drive, to enable the dirt to settle naturally. In the event of a fix of the entry, a simple replacement of the asphalt layer can be considered if the contractor believes that the present foundation is adequate. In both cases, base redone or foundation maintained, the duration of its guarantee must be the same.

Parking Lot Repair And Striping Anchorage Alaska

The weather conditions in our beautiful province can have a disastrous impact on an asphalt drive, thus the importance of adding a slope with a minimum slope of 2%. This will allow water to drain to the road and minimize the danger of heaving or cracking. This significant detail must be taken into account when excavating and maintained during backfilling.

In case you've got a van or recreational vehicle, notify the contractor before the start of the job: he is going to be able to provide materials so. Some asphalt combinations produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the base should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the setup of unwanted supports around the foundation is a good method to prevent possible cracks and that asphalting done in chilly weather is going to be of poor quality. It is therefore better to await the sunny days to go back before beginning work.

To avoid unpleasant surprises, choose your contractor diligently and be certain that the title and address of his business are written on the contract. The start and finish dates of this job, as well as proof of the builder's liability insurance and the technical specifics of this job to be carried out, should also be included. No contractor should require a down payment before work begins. To avoid the inconvenience that might cause unforeseen expenses, take a look at the Parking Lot Repair And StripingAnchorage website. You may thus have all the tools in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Anchorage - Best Alaska at Alaska!

For quality asphalting work , phone on Parking Lot Repair And Striping, Anchorage specialist team. We have more than twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to find out the regions served.

Asphalt Anchorage | Concrete Maintenance Anchorage
Home >> alaska/anchorage >> parking lot repair and Striping
Share this...