Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt surface in Anchorage, Alaska


Snow Removal installed on an unstable surface can quickly lead to problems. There are 3 main choices for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape and not showing severe cracks or crumbling, hot asphalt mix can be placed directly within your driveway. 1 facet is height: make certain fences, garage floors, and other constructions aren't compromised by the higher degree of the surface.
  2. Eliminate old driveway, counter into the ground: The present driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mix.

The more asphalt you work, the more leeway you have. By way of example, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix remains functional in this period, but the time is constrained.

How much can an Snow Removal cost in Anchorage?

Take into account the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt work.

In addition, it will be useful to distinguish the contractor if you own a recreational vehicle or a van. He will need to accommodate the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Snow Removal

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used along with the paving contractor.

To get a sustainable Snow Removal

The existence of an asphalt paver may be around 20 years, when the very best conditions are satisfied. We're talking about a professional paving builder, a good quality of asphalt and an optimal asphalt laying technique.

Snow Removal in Anchorage: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the quality of the placing. Really, the major causes of deformation or ripping of an asphalt layer are the absence of compaction plus a thin foundation. However, the maintenance of the asphalt pavement can be a determining factor in its longevity. That's to say, you will need to seal your driveway once in 10 decades, at a minimum, so as to keep its great state.


We advise you to notify your asphalting builder if you choose to have your driveway asphalt in order to sell your property. It might not be essential to pay top dollar for laying asphalt , in this circumstance.

Snow Removal laying: price and contract

The choice of the asphalt laying builder is essential. In order not to have unpleasant surprises, you will have to choose it carefully.

Make sure the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of beginning and finish of the job;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You should know that a paving contractor can't require you to make a deposit before work has started. But you should agree on the payment terms and make sure it's about the contract.

Prior to estimating the asphalt drive to your new residence by a contractor, or obtaining some basic knowledge is imperative to guarantee that the job is well done. Know first that the absence of compaction and the inadequate depth of the foundation are the two chief sources for the deformation or tearing of a coating of asphalt. If it is a new driveway, then it must initially be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane is going to be set beneath the granular backfill if the dirt proves to be very loamy (clayey). If you own a new house, it is best to wait 6 to 12 months prior to paving your driveway, to enable the dirt to settle naturally. In the case of a fix of the entry, an easy replacement of the asphalt coating can be considered in the event the contractor considers that the existing base is sufficient. In both cases, base redone or foundation preserved, the whole period of its warranty must be exactly the same.

Snow Removal Anchorage Alaska

The weather conditions in our beautiful province may have a disastrous impact in an asphalt driveway, hence the importance of adding a slope with a minimum slope of 2%. This will allow water to drain to the road and decrease the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

In case you've got a van or recreational vehicle, notify the contractor before the start of the work: he will have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the setup of side supports around the foundation is a fantastic way to avoid possible cracks and this asphalting done in cold weather will be of inferior quality. It is therefore far better to await the bright days to go back before starting work.

A Snow Removal contract with your contractor in Anchorage

To avoid unpleasant surprises, then select your contractor and be sure that the title and address of his business are written on the contract. The beginning and end dates of this work, in addition to evidence of the contractor's liability insurance and the technical details of the project to be carried out, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that could cause unforeseen costs, take a look at the Snow RemovalAnchorage site. You will thus have all the tools in hand to successfully finish your asphalt paving project.

Snow Removal Anchorage - Best Alaska in Alaska!

For caliber asphalting perform , call on Snow Removal, Anchorage specialist team. Consult our Business department to figure out the regions served.

Concrete Maintenance Anchorage | Tar And Chip Paving Anchorage
Home >> alaska/anchorage >> snow removal
Share this...