Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Tar And Chip Paving- Alternatives for the asphalt Coating in Anchorage, Alaska


Tar And Chip Paving installed on an unstable surface could quickly lead to problems. There are 3 Chief choices for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than showing serious cracks or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is height: make sure fences, garage floors, and other structures are not jeopardized by the greater level of this new surface.
  2. Eliminate old driveway, counter into the floor: The present driveway is completely removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and secure it to a good surface. This is the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mix. Generally 6 to 8 inches of aggregate goes under 3 inches of asphalt.

Our Services:

The best time to install Tar And Chip Paving in Anchorage

The more asphalt you operate, the more leeway you might have. For example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains practical during this period of time, however, the time is limited.

How much can an Tar And Chip Paving price in Anchorage?

Take into account the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt work.

Furthermore, it'll be good to distinguish the contractor should you have a recreational vehicle or even a van. He will need to adapt the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Tar And Chip Paving

A driveway paved with asphalt has several advantages:

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt used along with the paving contractor.

For a sustainable Tar And Chip Paving

The existence of an asphalt paver can be up to 20 decades, when the very best conditions are satisfied. We're referring to a professional paving contractor, a good grade of asphalt and an optimal asphalt laying technique.

Tar And Chip Paving in Anchorage: price, quality of work and lifespan


The longevity of residential asphalt paving largely is dependent on the quality of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a thin foundation. However, the upkeep of the asphalt pavement can be a deciding factor in its longevity. That is to say, you'll need to seal your driveway once in ten decades, at a minimum, so as to keep its great state.


We suggest that you notify your asphalting contractor if you decide to get your driveway asphalt in order to offer your property. It might not be necessary to pay top dollar for laying asphalt , in this case.

Tar And Chip Paving laying: cost and contract

The choice of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you'll need to select it carefully.

Our guarantees and Tar And Chip Paving work

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

The following details must be included in the arrangement:

- date of start and end of the job;

- proof of insurance;

- technical details;

- RBQ accreditation number.

You ought to be aware that a paving contractor can't demand that you make a down payment before work has started. However, you should agree to the payment terms and be sure it's on the contract.

A solid base for Tar And Chip Paving- Anchorage

Before redoing the asphalt drive to your new home by a contractor, or acquiring some basic knowledge is imperative to make sure the job is well done. Know first that the lack of compaction and the insufficient depth of the base are the two chief sources for the deformation or ripping of a layer of asphalt. If it is a new driveway, it has to first be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane is going to be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you have a new home, it's ideal to wait for 6 to 12 months before paving your drive, to allow the dirt to settle . In the event of a fix of the entrance, a simple replacement of the asphalt coating can be considered if the contractor believes that the present base is sufficient. In both scenarios, base redone or base maintained, the duration of its guarantee has to be the same.

Tar And Chip Paving Anchorage Alaska

The weather conditions in our lovely state can have a disastrous impact in an asphalt driveway, hence the significance of including a slope having a minimum slope of 2%. This will enable water to drain to the road and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder before the onset of the job: he will be able to supply materials accordingly. Some asphalt mixtures produce an asphalt that is more immune to heavy-duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of side supports around the base is a good method to prevent potential cracks and this asphalting done in chilly weather will be of inferior quality. It's therefore far better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, then choose your contractor and be sure the title and address of his company are composed about the contract. The start and end dates of the job, as well as proof of this builder's liability insurance and also the technical specifics of the job to be completed, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that could cause unforeseen costs, take a look at the Tar And Chip PavingAnchorage website. You will thus have the resources in hand to successfully complete your asphalt paving project.

Tar And Chip Paving Anchorage - Greatest Alaska at Alaska!

For quality asphalting work , phone on Tar And Chip Paving, Anchorage specialist team. Confirm our Company department to figure out the regions served.

Snow Removal Anchorage | Asphalt Anchorage
Home >> alaska/anchorage >> tar and chip paving
Share this...