Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Badger, Alaska


Snow Removal installed in an unstable surface can quickly lead to problems. There are 3 Chief choices for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not revealing severe fractures or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is elevation: make certain fences, garage flooring, and other structures aren't compromised by the higher level of the surface.
  2. Eliminate old driveway, peg to the floor: The present driveway is completely eliminated (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and fasten it to a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of the hot asphalt mixture. Typically 6 to 8 inches of aggregate goes under 3 inches of asphalt.

Our Services:

The best time to install Snow Removal in Badger

The longer asphalt you work, the more leeway you have. For instance, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix is ​​still practical during this period of time, however, the time is constrained.

How much does an Snow Removal price in Badger?

Take into account the weather vagaries of our climate when choosing the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it'll be good to distinguish the contractor if you own a recreational vehicle or a van. He will have to adapt the asphalt mixture so as to be more immune to the burden of heavy vehicles.

The Benefits of Snow Removal

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used and the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver may be up to 20 years, when the best states are met. We are referring to a professional paving contractor, a good quality of asphalt as well as also an optimal asphalt laying technique.

Snow Removal in Badger: cost, quality of work and lifespan


The longevity of residential asphalt paving chiefly is dependent upon the standard of the laying. Really, the significant causes of deformation or tearing of an asphalt coating are the absence of compaction and a lean base. However, the maintenance of the asphalt pavement is also a determining factor in its own longevity. That is to say, you will need to seal your driveway once in 10 decades, at a minimum, so as to maintain its good condition.


We suggest that you notify your asphalting builder if you choose to have your driveway asphalt in order to offer your property. It might not be necessary to pay top dollar for laying asphalt , in this case.

Snow Removal laying: price and contract

The choice of the asphalt laying contractor is essential. In order not to have unpleasant surprises, you'll need to select it carefully.

Our ensures and Snow Removal work

Make sure the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of start and finish of the job;

- proof of insurance;

- technical details;

- RBQ accreditation number.

You should know that a paving builder can't demand you to make a down payment before work has begun. However, you should agree to the payment terms and be sure it's about the contract.

A solid foundation for Snow Removal- Badger

Prior to estimating the asphalt driveway to your new home by a contractor, or obtaining some fundamental knowledge is vital to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the base are the two main sources for the deformation or tearing of a layer of asphalt. If it's a new driveway, it must initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be set beneath the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you own a new home, it's ideal to wait for 6 to 12 months before paving your drive, to allow the dirt to settle naturally. In the event of a fix of the entrance, an easy replacement of the asphalt layer can be considered if the contractor believes that the existing foundation is adequate. In both cases, foundation redone or base preserved, the duration of its warranty must be exactly the same.

Snow Removal Badger Alaska

The weather conditions in our beautiful province may have a disastrous impact on an asphalt driveway, hence the significance of including a slope having a minimum slope of 2%. This will allow water to drain to the street and decrease the danger of heaving or cracking. This significant detail must be taken into consideration when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder prior to the start of the job: he will be able to provide materials so. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the setup of side supports around the base is a fantastic method to prevent possible cracks and that asphalting done in chilly weather is going to be of poor quality. It's therefore far better to await the bright days to return before beginning work.

A definite contract with your contractor in Badger

To avoid unpleasant surprises, select your contractor and be certain the name and address of the company are composed on the contract. The beginning and end dates of this job, in addition to evidence of the contractor's liability insurance and also the technical details of this project to be carried out, should also be included. No contractor should need a down payment before work starts. To prevent the inconvenience that could cause unforeseen costs, visit the Snow RemovalBadger site. You may thus have all the resources in hand to successfully complete your asphalt paving project.

Snow Removal Badger - Best Alaska in Alaska!

For quality asphalting work , call on Snow Removal, Badger specialist team. Confirm our Business department to figure out the regions served.

Concrete Maintenance Badger | Tar And Chip Paving Badger
Home >> alaska/badger >> snow removal
Share this...