Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Alternatives for the asphalt Coating in College, Alaska


Concrete Maintenance installed in an unstable surface could quickly lead to difficulties. There are 3 main choices for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not revealing severe fractures or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is height: make sure fences, garage flooring, and other structures are not jeopardized by the higher level of this surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Eliminate the old driveway and secure it into a solid surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix. Typically 6 to 8 inches of aggregate extends under 3 inches of asphalt.

The longer asphalt you work, the more leeway you have. For example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. In general, for thin asphalt applications (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix is ​​still practical in this period, however, the time is constrained.

How much does an Concrete Maintenance price in College?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

Furthermore, it will be useful to distinguish the contractor should you own a recreational vehicle or even a van. He might need to adapt the asphalt mix in order to be more immune to the burden of heavy vehicles.

The Benefits of Concrete Maintenance

  • Smooth end;
  • non invasive
  • Simple to Keep
  • watertightness ensured
  • withstands the rigors of the Quebec climate very well (provided it has been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used along with the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver can be around 20 decades, when the very best conditions are met. We're referring to a professional paving contractor, a good grade of asphalt and an optimal asphalt laying technique.


The durability of residential asphalt paving largely is dependent on the standard of the placing. Really, the major causes of deformation or ripping of an asphalt layer are the lack of compaction and a lean base. On the other hand, the maintenance of the asphalt sidewalk is also a deciding factor in its longevity. That is to say, you will have to seal your drive once in 10 decades, at a minimum, in order to maintain its good state.


We suggest that you notify your asphalting contractor in case you choose to get your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for placing asphalt , in this case.

Concrete Maintenance laying: price and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, you'll need to select it carefully.

Make sure the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has ever become the subject of complaints.

The following details should be included in the arrangement:

- date of start and finish of the work;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to be aware that a Concrete Maintenance contractor can't require you to make a down payment before work has started. But you should agree on the payment provisions and be sure it is on the contract.

A strong base for Concrete Maintenance- College

Prior to estimating the Concrete Maintenance driveway to your new home by a builder, or obtaining some fundamental knowledge is vital to guarantee that the job is done. Know first that the absence of compaction and the insufficient depth of the base are the two main sources for the deformation or tearing of a coating of asphalt. When it is a new driveway, then it has to first be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be placed under the granular backfill if the dirt turns out to be very loamy (clayey). If you have a new house, it's ideal to wait 6 to 12 months prior to paving your driveway, to allow the soil to settle . In the event of a fix of the entrance, a simple replacement of the Concrete Maintenance layer can be considered in the event the contractor believes that the existing foundation is adequate. In both cases, foundation redone or base maintained, the duration of its warranty has to be the same.

Concrete Maintenance College Alaska

The weather conditions in our beautiful province can have a disastrous impact on an asphalt driveway, hence the significance of including a slope with a minimum slope of 2%. This will allow water to drain into the road and minimize the risk of heaving or cracking. This significant detail has to be taken into account when excavating and maintained during backfilling.

If you have a van or recreational vehicle, notify the builder before the onset of the work: he is going to be able to supply materials so. Some asphalt combinations produce an asphalt which is more immune to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the foundation is a fantastic way to prevent possible cracks and that Concrete Maintenance done in chilly weather will be of inferior quality. It is therefore far better to wait for the sunny days to return before beginning work.

To avoid unpleasant surprises, then choose your contractor diligently and make sure the title and address of the business are written on the contract. The beginning and finish dates of the job, as well as proof of the contractor's liability insurance and also the technical details of the project to be completed, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that could cause unforeseen expenses, take a look at the Concrete MaintenanceCollege website. You will thus have the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance College - Greatest Alaska in Alaska!

For quality asphalting perform , phone on Concrete Maintenance, College professional team. Consult our Business department to figure out the regions served.

Parking Lot Repair And Striping College | Snow Removal College
Home >> alaska/college >> concrete maintenance