Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Concrete Maintenance- Options for the asphalt surface in Fairbanks, Alaska


Concrete Maintenance installed on an unstable surface can quickly lead to difficulties. There are three Chief options for the Simple installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than revealing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is height: make certain fences, garage floors, and other structures aren't jeopardized by the higher degree of the surface.
  2. Remove old driveway, counter into the floor: The existing driveway is completely eliminated (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Remove the old driveway and fasten it to a good surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mix. Generally 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Concrete Maintenance from Fairbanks

The more asphalt you work, the more leeway you might have. For instance, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix remains practical during this period of time, however, the time is limited.

How much does an Concrete Maintenance price in Fairbanks?

Take into account the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt perform.

In addition, it'll be useful to tell the contractor should you have a recreational vehicle or even a van. He might have to accommodate the asphalt mixture in order to be more resistant to the weight of heavy vehicles.

The advantages of Concrete Maintenance

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used along with the paving contractor.

For a sustainable Concrete Maintenance

The life of an asphalt paver can be around 20 years, when the very best conditions are satisfied. We are talking about a professional paving contractor, a great quality of asphalt and also an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent on the standard of the laying. Indeed, the significant causes of deformation or ripping of an asphalt coating are the lack of compaction and a lean base. On the other hand, the upkeep of the asphalt sidewalk is also a deciding factor in its own longevity. That is to say, you'll need to seal your driveway once in ten years, at a minimum, in order to keep its great state.


We suggest that you inform your asphalting contractor if you choose to get your driveway asphalt so as to sell your property. It might not be essential to pay top dollar for laying asphalt , in this case.

Concrete Maintenance placing: cost and contract

The choice of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, then you'll need to select it carefully.

Our guarantees and Concrete Maintenance work

Guarantee that the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has become the subject of complaints.

The following details must be included in the contract:

- date of start and end of the job;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should know that a Concrete Maintenance builder can't demand you to make a deposit before work has begun. But you need to agree on the payment provisions and make sure it's about the contract.

Before redoing the Concrete Maintenance drive to your new residence by a contractor, or obtaining some basic knowledge is vital to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the base are the two chief causes of the deformation or tearing of a coating of asphalt. When it is a new driveway, it has to first be excavated to make room for a coating of crushed stone of adequate thickness. A geotextile membrane will be set under the granular backfill if the soil turns out to be very loamy (clayey). If you own a new house, it is best to wait for 6 to 12 months before paving your driveway, to enable the soil to settle naturally. In the event of a repair of this entry, a simple replacement of the Concrete Maintenance layer can be considered in the event the contractor believes that the present base is sufficient. In both scenarios, base redone or base maintained, the duration of its guarantee has to be the same.

Concrete Maintenance Fairbanks Alaska

The weather conditions in our lovely state may have a disastrous impact in an asphalt drive, hence the significance of adding a slope with a minimum slope of 2%. This will enable water to drain to the road and minimize the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor prior to the onset of the work: he is going to be able to provide materials accordingly. Some asphalt combinations produce an asphalt that is more resistant to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the installation of side supports around the base is a fantastic way to avoid possible cracks and that Concrete Maintenance done in chilly weather is going to be of inferior quality. It is therefore better to await the sunny days to return before beginning work.

To avoid unpleasant surprises, then choose your contractor diligently and be sure that the name and address of his company are composed on the contract. The beginning and end dates of this job, as well as evidence of the builder's liability insurance and the technical details of the job to be completed, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that could lead to unforeseen expenses, take a look at the Concrete MaintenanceFairbanks website. You may thus have all the resources in hand to successfully complete your Concrete Maintenance project.

Concrete Maintenance Fairbanks - Best Alaska in Alaska!

For caliber asphalting perform , phone on Concrete Maintenance, Fairbanks specialist team. We've got more than twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Consult our Company department to figure out the regions served.

Parking Lot Repair And Striping Fairbanks | Snow Removal Fairbanks
Home >> alaska/fairbanks >> concrete maintenance
Share this...