Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt surface in Fairbanks, Alaska


Snow Removal installed in an unstable surface could quickly lead to difficulties. There are 3 Chief choices for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not revealing serious cracks or crumbling, hot asphalt mixture can be placed directly within your driveway. One facet is height: make sure fences, garage floors, and other constructions are not jeopardized by the greater degree of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it to a solid surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mix.

Our Services:

The best time to install Snow Removal from Fairbanks

The more asphalt you operate, the more leeway you have. For example, in 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. In general, for lean asphalt programs (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to consult with your contractor. The hot mix remains practical in this period, but the time is limited.

How much does an Snow Removal cost in Fairbanks?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt perform.

Furthermore, it will be good to distinguish the contractor if you own a recreational vehicle or a van. He might have to accommodate the asphalt mixture so as to be more immune to the burden of heavy vehicles.

The Benefits of Snow Removal

  • Smooth finish;
  • non invasive
  • easy to Keep
  • watertightness guaranteed
  • withstands the rigors of the Quebec climate very well (provided it's been installed optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt employed along with the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver may be up to 20 years, when the very best conditions are met. We're talking about a professional paving contractor, a great grade of asphalt and an optimal asphalt laying technique.

Snow Removal in Fairbanks: price, quality of work and lifespan


The longevity of residential asphalt paving largely depends on the quality of the placing. Indeed, the major causes of deformation or tearing of an asphalt layer are the lack of compaction and a thin foundation. On the other hand, the upkeep of the asphalt sidewalk is also a deciding factor in its own longevity. That is to say, you will need to seal your drive once in ten decades, at a minimum, so as to maintain its great state.


We suggest that you notify your asphalting builder if you decide to get your driveway asphalt in order to offer your property. It may not be essential to pay top dollar for laying asphalt , in this circumstance.

Snow Removal placing: cost and contract

The option of the asphalt laying builder is essential. In order not to have unpleasant surprises, you will need to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has been the subject of complaints.

These details should be included in the arrangement:

- date of start and finish of the work;

- evidence of insurance;

- technical details;

- RBQ accreditation number.

You ought to be aware that a paving builder cannot demand you to make a deposit before work has started. But you should agree to the payment terms and be sure it's on the contract.

Prior to estimating the asphalt driveway to your new residence by a builder, or obtaining some fundamental knowledge is imperative to guarantee that the job is well done. Know first that the absence of compaction and the insufficient depth of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. If it is a new driveway, then it must first be excavated to make room for a coating of crushed stone of adequate thickness. A geotextile membrane will be placed beneath the granular backfill if the dirt proves to be very loamy (clayey). If you have a new house, it's best to wait for 6 to 12 months before paving your driveway, to allow the dirt to settle . In the event of a repair of the entrance, a simple replacement of the asphalt layer can be considered if the contractor considers that the existing foundation is sufficient. In both cases, foundation redone or base preserved, the duration of its guarantee must be exactly the same.

Snow Removal Fairbanks Alaska

The weather conditions in our lovely state may have a disastrous impact in an asphalt drive, thus the importance of including a slope having a minimum slope of 2%. This will enable water to drain into the road and minimize the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the builder prior to the onset of the work: he will have the ability to provide materials so. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of 5 cm (2 ) after being compacted. For optimal stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of side supports around the base is a fantastic way to avoid potential cracks and that asphalting done in chilly weather is going to be of inferior quality. It is therefore far better to wait for the bright days to go back before beginning work.

To avoid unpleasant surprises, choose your contractor diligently and make sure that the name and address of his company are composed on the contract. The beginning and end dates of the job, as well as proof of this builder's liability insurance and the technical details of the job to be carried out, should also be included. No contractor should require a down payment before work starts. To avoid the inconvenience that could lead to unforeseen costs, take a look at the Snow RemovalFairbanks website. You will thus have all the tools in hand to successfully complete your asphalt paving project.

Snow Removal Fairbanks - Best Alaska at Alaska!

For caliber asphalting perform , phone on Snow Removal, Fairbanks specialist team. Consult our Company section to figure out the regions served.

Concrete Maintenance Fairbanks | Tar And Chip Paving Fairbanks
Home >> alaska/fairbanks >> snow removal
Share this...