Snow Removal- Options for the asphalt surface in Juneau, Alaska


Snow Removal installed on an unstable surface could quickly lead to difficulties. There are 3 Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than revealing severe cracks or crumbling, hot asphalt mix can be placed directly within your driveway. One aspect is elevation: make certain fences, garage floors, and other structures are not compromised by the higher degree of this surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Eliminate the old driveway and secure it to a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mixture.

Our Services:

The best time to install Snow Removal in Juneau

The longer asphalt you work, the more leeway you have. By way of instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix remains functional in this period of time, but the time is constrained.

How much can an Snow Removal cost in Juneau?

Consider the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations that we experience cause considerable damage to asphalt work.

In addition, it'll be good to tell the contractor if you own a recreational vehicle or a van. He might have to accommodate the asphalt mix in order to be more resistant to the weight of heavy vehicles.

The Benefits of Snow Removal

  • Smooth end;
  • non-slip
  • Simple to maintain
  • watertightness ensured
  • withstands the rigors of the Quebec climate quite well (provided it has been set up optimally);
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the quality of the asphalt used and the paving contractor.

For a sustainable Snow Removal

The life of an asphalt paver may be up to 20 years, when the very best states are satisfied. We are referring to a professional paving contractor, a good grade of asphalt as well as an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly is dependent upon the standard of the placing. Indeed, the major causes of deformation or ripping of an asphalt coating are the lack of compaction and a thin foundation. However, the upkeep of the asphalt pavement is also a determining factor in its longevity. That is to say, you'll need to seal your driveway once in ten decades, at a minimum, so as to maintain its great condition.


We advise you to inform your asphalting builder if you decide to get your driveway asphalt so as to sell your property. It might not be necessary to pay top dollar for laying asphalt , in such a circumstance.

Snow Removal laying: cost and contract

The option of the asphalt laying contractor is essential. In order not to have unpleasant surprises, then you'll have to select it carefully.

Guarantee that the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should be aware that a paving builder can't require you to make a deposit before work has begun. But you need to agree on the payment provisions and make sure it's on the contract.

A strong base for Snow Removal- Juneau

Before redoing the asphalt driveway to your new residence by a contractor, or acquiring some fundamental knowledge is vital to make sure the job is well done. Know first that the lack of compaction and the inadequate thickness of the base are the two main causes of the deformation or ripping of a coating of asphalt. If it's a new driveway, it has to first be excavated to make room for a layer of crushed stone of sufficient thickness. A geotextile membrane will be placed beneath the granular backfill if the dirt proves to be very loamy (clayey). If you have a new house, it is best to wait 6 to 12 months prior to paving your drive, to enable the soil to settle . In the case of a fix of the entry, a simple replacement of the asphalt layer can be considered if the contractor considers that the present foundation is sufficient. In both scenarios, foundation redone or foundation preserved, the duration of its warranty has to be the same.

Snow Removal Juneau Alaska

The weather conditions in our beautiful province may have a devastating effect on an asphalt driveway, thus the importance of adding a slope having a minimum slope of 2%. This will enable water to drain to the road and minimize the danger of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder before the start of the job: he will have the ability to provide materials accordingly. Some asphalt combinations produce an asphalt which is more immune to heavy duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to reach a thickness of 5 cm (2 ) after being compacted. For optimum stability, the base should extend over the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the base is a good way to prevent possible cracks and this asphalting done in cold weather is going to be of poor quality. It is therefore far better to wait for the bright days to go back before starting work.

To avoid unpleasant surprises, choose your contractor diligently and be sure the title and address of the business are written about the contract. The beginning and finish dates of this job, in addition to evidence of this builder's liability insurance and also the technical details of this job to be carried out, should also be included. No contractor should need a deposit before work starts. To prevent the inconvenience that could cause unforeseen costs, take a look at the Snow RemovalJuneau website. You may thus have the tools in hand to successfully complete your asphalt paving project.

Snow Removal Juneau - Best Alaska in Alaska!

For caliber asphalting work , phone on Snow Removal, Juneau professional team. We've got more than 20 years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to figure out the regions served.

Concrete Maintenance Juneau | Tar And Chip Paving Juneau
Home >> alaska/juneau >> snow removal
Share this...