Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Options for the asphalt Coating in Knik Fairview, Alaska


Asphalt installed in an unstable surface can quickly lead to problems. There are three main choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not showing serious fractures or crumbling, hot asphalt mix can be laid directly over your driveway. 1 facet is height: make certain fences, garage floors, and other structures are not jeopardized by the higher level of this surface.
  2. Remove old driveway, counter into the ground: The existing driveway is totally removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it to a solid surface. This is actually the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mix.

Our Services:

The best time to install Asphalt from Knik Fairview

The more asphalt you operate, the more leeway you might have. By way of instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for thin asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still functional during this period of time, however, the time is limited.

How much can an Asphalt price in Knik Fairview?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

In addition, it will be useful to tell the contractor should you have a recreational vehicle or even a van. He will have to accommodate the asphalt mix so as to be more immune to the burden of heavy vehicles.

The Benefits of Asphalt

  • Smooth finish;
  • non invasive
  • Simple to Keep
  • watertightness ensured
  • withstands the rigors of the Quebec climate quite well (provided it's been set up );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt employed and the paving contractor.

For a sustainable Asphalt

The existence of an asphalt paver can be around 20 years, when the very best conditions are satisfied. We're talking about a professional paving contractor, a good grade of asphalt as well as an optimal asphalt laying technique.


The durability of residential asphalt paving largely is dependent on the quality of the placing. Really, the major causes of deformation or tearing of an asphalt coating are the lack of compaction plus a thin foundation. On the other hand, the upkeep of the asphalt pavement can be a deciding factor in its own longevity. That's to say, you will need to seal your drive once in 10 decades, at a minimum, in order to keep its good state.


We advise you to inform your asphalting builder if you choose to have your driveway asphalt in order to offer your property. It might not be necessary to pay top dollar for laying asphalt , in such a circumstance.

Asphalt laying: price and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you'll need to select it carefully.

Our ensures and Asphalt work

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has ever become the subject of complaints.

These details must be included in the contract:

- date of beginning and end of the work;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should know that a paving contractor can't require that you make a down payment before work has begun. But you need to agree to the payment provisions and make sure it's on the contract.

A strong foundation for Asphalt- Knik Fairview

Prior to estimating the asphalt drive to your new home by a builder, or acquiring some fundamental knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the inadequate depth of the foundation are the two main causes of the deformation or ripping of a layer of asphalt. If it's a new driveway, then it must initially be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new home, it's best to wait for 6 to 12 months prior to paving your driveway, to allow the dirt to settle naturally. In the event of a fix of this entry, an easy replacement of the asphalt coating can be considered if the contractor considers that the existing base is adequate. In both cases, foundation redone or base preserved, the whole period of its warranty must be exactly the same.

Asphalt Knik Fairview Alaska

The weather conditions in our lovely state may have a devastating effect on an asphalt driveway, hence the significance of adding a slope having a minimum slope of 2%. This will enable water to drain into the street and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder before the start of the work: he is going to have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt that is more resistant to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the base should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the foundation is a fantastic way to avoid possible cracks and this asphalting done in cold weather is going to be of poor quality. It's therefore far better to await the sunny days to go back before beginning work.

A Asphalt contract with your builder in Knik Fairview

To avoid unpleasant surprises, choose your contractor and be sure that the title and address of his business are composed about the contract. The beginning and end dates of the job, in addition to proof of the builder's liability insurance and the technical specifics of this project to be completed, should also be included. No contractor should require a down payment before work begins. To avoid the inconvenience that might lead to unforeseen expenses, visit the AsphaltKnik Fairview website. You may thus have all the resources in hand to successfully complete your asphalt paving project.

Asphalt Knik Fairview - Best Alaska at Alaska!

For caliber asphalting work , phone on Asphalt, Knik Fairview professional team. Consult our Company department to figure out the regions served.

Tar And Chip Paving Knik Fairview | Parking Lot Repair And Striping Knik Fairview
Home >> alaska/knik fairview >> asphalt
Share this...