Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Apache Junction, Arizona


Parking Lot Repair And Striping installed in an unstable surface can quickly lead to difficulties. There are three main options for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than showing serious fractures or crumbling, hot asphalt mix can be placed directly within your driveway. 1 facet is elevation: make sure fences, garage flooring, and other constructions aren't compromised by the higher level of the new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is completely eliminated (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mix. Generally 6 to 8 inches of limestone goes under 3 inches of asphalt.

The longer asphalt you work, the more leeway you have. For example, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. Generally, for lean asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains functional during this period, however, the time is constrained.

How much can an Parking Lot Repair And Striping cost in Apache Junction?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt work.

Furthermore, it will be good to tell the contractor should you have a recreational vehicle or even a van. He will have to adapt the asphalt mixture in order to be more resistant to the weight of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

A driveway paved with asphalt has several advantages:

It will cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be up to 20 decades, when the best conditions are satisfied. We are referring to a professional paving builder, a great grade of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent on the standard of the placing. Indeed, the significant causes of deformation or ripping of an asphalt coating are the lack of compaction plus a lean base. However, the upkeep of the asphalt pavement can be a determining factor in its own longevity. That is to say, you'll need to seal your driveway once in ten decades, at a minimum, so as to keep its great condition.


We suggest that you notify your asphalting contractor in case you choose to have your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for placing asphalt , in such a circumstance.

Parking Lot Repair And Striping placing: cost and contract

The option of the asphalt laying builder is essential. In order not to have unpleasant surprises, you'll have to choose it carefully.

Our guarantees and Parking Lot Repair And Striping work

Guarantee that the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever become the subject of complaints.

These details must be included in the arrangement:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You should be aware that a paving contractor cannot demand that you make a down payment before work has begun. But you need to agree on the payment terms and be sure it is about the contract.

Before redoing the asphalt drive to your new residence by a contractor, or obtaining some fundamental knowledge is vital to guarantee that the job is done. Know first that the lack of compaction and the inadequate depth of the foundation are the two chief causes of the deformation or tearing of a coating of asphalt. When it is a new driveway, then it has to first be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be placed beneath the granular backfill if the soil turns out to be very loamy (clayey). If you have a new house, it's ideal to wait for 6 to 12 months prior to paving your driveway, to enable the soil to settle naturally. In the event of a repair of the entrance, an easy replacement of the asphalt coating can be considered in the event the contractor considers that the present base is sufficient. In both cases, base redone or base maintained, the whole period of its warranty has to be the same.

Parking Lot Repair And Striping Apache Junction Arizona

The weather conditions in our beautiful province can have a devastating effect in an asphalt drive, thus the importance of including a slope having a minimum slope of 2%. This will enable water to drain to the street and decrease the risk of heaving or cracking. This important detail must be taken into consideration when excavating and maintained during backfilling.

In case you've got a van or recreational vehicle, notify the contractor before the onset of the job: he will be able to supply materials accordingly. Some asphalt combinations produce an asphalt which is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of 5 cm (2 ) after being compacted. For optimum stability, the base should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the installation of unwanted supports around the base is a fantastic method to prevent possible cracks and that asphalting done in chilly weather will be of poor quality. It is therefore better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, then choose your contractor and make certain that the title and address of his company are composed about the contract. The start and finish dates of the job, as well as proof of the builder's liability insurance and the technical specifics of this job to be completed, should also be included. No contractor should need a down payment before work starts. To prevent the inconvenience that could lead to unforeseen expenses, take a look at the Parking Lot Repair And StripingApache Junction site. You may thus have the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Apache Junction - Greatest Arizona at Arizona!

For caliber asphalting work , call on Parking Lot Repair And Striping, Apache Junction professional team. Consult our Company section to figure out the regions served.

Asphalt Apache Junction | Concrete Maintenance Apache Junction
Home >> arizona/apache junction >> parking lot repair and Striping
Share this...