Parking Lot Repair And Striping installed in an unstable surface could quickly lead to difficulties. There are 3 main options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not showing serious cracks or crumbling, hot asphalt mixture can be placed directly within your driveway. One facet is elevation: make certain fences, garage flooring, and other structures aren't compromised by the higher degree of the surface.
  2. Remove old driveway, peg to the floor: The existing driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone flooring partly replaces part of this hot asphalt mix.

The more asphalt you operate, the more leeway you have. By way of instance, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for thin asphalt applications (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still practical during this period, but the time is limited.

How much does an Parking Lot Repair And Striping cost in Apache Junction?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt perform.

Furthermore, it will be useful to distinguish the contractor should you have a recreational vehicle or a van. He will have to accommodate the asphalt mixture in order to be more immune to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the quality of the asphalt employed and the paving contractor.

For a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be up to 20 decades, when the very best conditions are satisfied. We are talking about a professional paving builder, a great grade of asphalt as well as an optimal asphalt laying technique.


The durability of residential asphalt paving largely is dependent on the quality of the placing. Indeed, the major causes of deformation or tearing of an asphalt coating are the lack of compaction and a thin foundation. However, the maintenance of the asphalt sidewalk is also a deciding factor in its own longevity. That's to say, you will have to seal your drive once in ten decades, at a minimum, so as to maintain its great state.


We advise you to inform your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for placing asphalt , in such a case.

Parking Lot Repair And Striping placing: price and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you will need to select it carefully.

Our ensures and Parking Lot Repair And Striping work

Guarantee that the paving contractor has liability insurance coverage. A visit to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has become the subject of complaints.

The following details must be included in the arrangement:

- date of start and end of the job;

- proof of insurance;

- technical details;

- RBQ accreditation number.

You ought to be aware that a paving builder cannot demand you to make a deposit before work has started. However, you need to agree on the payment provisions and be sure it is on the contract.

A solid base for Parking Lot Repair And Striping- Apache Junction

Before redoing the asphalt driveway to your new home by a contractor, or obtaining some fundamental knowledge is vital to guarantee that the job is done. Know first that the lack of compaction and the inadequate thickness of the base are the two chief sources for the deformation or ripping of a coating of asphalt. If it is a new driveway, then it has to first be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane is going to be placed beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new house, it is best to wait 6 to 12 months before paving your driveway, to allow the dirt to settle . In the event of a repair of the entry, an easy replacement of the asphalt coating can be considered if the contractor believes that the present foundation is adequate. In both cases, foundation redone or foundation preserved, the whole period of its guarantee has to be the same.

Parking Lot Repair And Striping Apache Junction Arizona

The weather conditions in our beautiful province can have a disastrous impact in an asphalt drive, thus the significance of including a slope having a minimum slope of 2%. This will allow water to drain to the road and minimize the danger of heaving or cracking. This significant detail must be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder before the start of the work: he will have the ability to supply materials so. Some asphalt combinations produce an asphalt which is more resistant to heavy duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the installation of side supports around the foundation is a fantastic way to prevent potential cracks and that asphalting done in cold weather will be of inferior quality. It is therefore far better to await the sunny days to return before beginning work.

A definite contract with your builder in Apache Junction

To avoid unpleasant surprises, choose your contractor and be certain the name and address of his business are composed about the contract. The beginning and end dates of the work, as well as proof of this contractor's liability insurance and the technical specifics of this job to be carried out, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that could lead to unforeseen costs, visit the Parking Lot Repair And StripingApache Junction website. You will thus have the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Apache Junction - Greatest Arizona at Arizona!

For quality asphalting work , call on Parking Lot Repair And Striping, Apache Junction professional team. We've got more than twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to figure out the regions served.

Asphalt Apache Junction | Concrete Maintenance Apache Junction
Home >> arizona/apache junction >> parking lot repair and Striping
Share this...