Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt surface in Arizona City, Arizona


Parking Lot Repair And Striping installed in an unstable surface could quickly lead to difficulties. There are three Chief options for the Simple installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing serious fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is elevation: make certain fences, garage flooring, and other structures aren't compromised by the higher degree of the surface.
  2. Remove old driveway, counter into the floor: The existing driveway is completely removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is put directly on the ground.
  3. Eliminate the old driveway and fasten it to a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mixture.

The longer asphalt you work, the more leeway you have. By way of instance, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also increases: 46 minutes. Generally, for thin asphalt programs (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you ought to speak to your contractor. The hot mix is ​​still functional in this period, but the time is limited.

How much does an Parking Lot Repair And Striping price in Arizona City?

Consider the weather vagaries of the climate when choosing the standard of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt work.

In addition, it will be useful to distinguish the contractor if you own a recreational vehicle or a van. He might need to adapt the asphalt mix so as to be more immune to the weight of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt employed along with the paving contractor.

For a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be up to 20 years, when the very best states are met. We are referring to a professional paving contractor, a good grade of asphalt and also an optimal asphalt laying technique.


The durability of residential asphalt paving largely is dependent upon the standard of the laying. Really, the significant causes of deformation or tearing of an asphalt layer are the lack of compaction plus a lean base. However, the maintenance of the asphalt sidewalk is also a deciding factor in its own longevity. That's to say, you'll have to seal your driveway once in ten decades, at a minimum, in order to keep its great condition.


We advise you to inform your asphalting builder if you decide to get your driveway asphalt so as to sell your property. It may not be necessary to pay top dollar for laying asphalt , in this circumstance.

Parking Lot Repair And Striping laying: cost and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, then you will have to select it carefully.

Our guarantees and Parking Lot Repair And Striping work

Make sure the paving contractor has liability insurance. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

These details must be included in the arrangement:

- date of start and end of the job;

- proof of insurance;

- technical details;

- RBQ accreditation number.

You should be aware that a paving builder can't require that you make a deposit before work has started. But you should agree to the payment terms and make sure it is about the contract.

A strong foundation for Parking Lot Repair And Striping- Arizona City

Before redoing the asphalt drive to your new residence by a builder, or acquiring some basic knowledge is vital to make sure the job is done. Know first that the absence of compaction and the inadequate depth of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. If it is a new driveway, it must initially be excavated to make room for a layer of crushed stone of adequate thickness. A geotextile membrane will be placed beneath the granular backfill if the dirt proves to be very loamy (clayey). If you own a new home, it's ideal to wait for 6 to 12 months before paving your drive, to allow the soil to settle . In the case of a fix of the entrance, a simple replacement of the asphalt layer can be considered if the contractor considers that the present foundation is sufficient. In both scenarios, base redone or base preserved, the whole period of its warranty has to be exactly the same.

Parking Lot Repair And Striping Arizona City Arizona

The weather conditions in our beautiful province can have a devastating effect on an asphalt drive, hence the significance of including a slope with a minimum slope of 2%. This will enable water to drain into the road and decrease the danger of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

In case you've got a van or recreational vehicle, notify the contractor prior to the onset of the job: he is going to have the ability to supply materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the setup of side supports around the foundation is a good method to avoid potential cracks and that asphalting done in chilly weather will be of poor quality. It is therefore far better to wait for the bright days to go back before beginning work.

To avoid unpleasant surprises, choose your contractor and make certain that the name and address of the company are written on the contract. The beginning and end dates of the work, in addition to proof of the builder's liability insurance and the technical specifics of this job to be completed, should also be included. No contractor should need a deposit before work begins. To avoid the inconvenience that could cause unforeseen costs, take a look at the Parking Lot Repair And StripingArizona City site. You will thus have the tools in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Arizona City - Greatest Arizona in Arizona!

For caliber asphalting work , call on Parking Lot Repair And Striping, Arizona City specialist team. Confirm our Business department to find out the regions served.

Asphalt Arizona City | Concrete Maintenance Arizona City
Home >> arizona/arizona city >> parking lot repair and Striping
Share this...