Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Alternatives for the asphalt Coating in Avondale, Arizona


Asphalt installed on an unstable surface could quickly lead to difficulties. There are 3 Chief options for the Simple setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than showing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. 1 aspect is elevation: make certain fences, garage flooring, and other constructions aren't jeopardized by the greater degree of this surface.
  2. Eliminate old driveway, peg to the floor: The present driveway is completely eliminated (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Eliminate the old driveway and secure it to a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mix. Generally 6 to 8 inches of limestone extends under 3 inches of asphalt.

The more asphalt you operate, the more leeway you might have. By way of example, at 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (about 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix is ​​still functional in this period, however, the time is limited.

How much can an Asphalt cost in Avondale?

Take into account the weather vagaries of the climate when deciding upon the quality of asphalt. The substantial temperature variations we experience cause considerable damage to asphalt perform.

In addition, it will be useful to distinguish the contractor if you have a recreational vehicle or even a van. He might have to accommodate the asphalt mix so as to be more resistant to the burden of heavy vehicles.

The Benefits of Asphalt

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt employed and the paving contractor.

To get a sustainable Asphalt

The life of an asphalt paver may be around 20 decades, when the best conditions are met. We are referring to a professional paving contractor, a good quality of asphalt as well as also an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly depends on the standard of the placing. Indeed, the major causes of deformation or ripping of an asphalt coating are the lack of compaction and a thin foundation. On the other hand, the upkeep of the asphalt sidewalk is also a deciding factor in its longevity. That's to say, you will need to seal your driveway once in ten decades, at a minimum, so as to maintain its good condition.


We advise you to notify your asphalting builder if you choose to have your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Asphalt laying: price and contract

The option of the asphalt laying builder is essential. In order to not have unpleasant surprises, you will need to choose it carefully.

Our ensures and Asphalt work

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever been the subject of complaints.

The following details should be included in the arrangement:

- date of beginning and finish of the job;

- evidence of insurance;

- technical details;

- RBQ accreditation number.

You ought to know that a paving contractor can't require that you make a deposit before work has begun. But you should agree on the payment terms and make sure it is about the contract.

Before redoing the asphalt driveway to your new home by a contractor, or acquiring some fundamental knowledge is vital to guarantee that the job is done. Know first that the absence of compaction and the inadequate depth of the base are the two main causes of the deformation or ripping of a layer of asphalt. If it's a new driveway, then it must initially be excavated to make room for a layer of crushed stone of adequate depth. A geotextile membrane is going to be set beneath the granular backfill if the soil turns out to be somewhat loamy (clayey). If you have a new house, it's best to wait for 6 to 12 months prior to paving your drive, to allow the dirt to settle naturally. In the event of a fix of the entrance, an easy replacement of the asphalt coating can be considered if the contractor believes that the existing base is sufficient. In both scenarios, foundation redone or foundation maintained, the whole period of its guarantee must be exactly the same.

Asphalt Avondale Arizona

The weather conditions in our lovely state may have a disastrous impact in an asphalt drive, hence the significance of including a slope having a minimum slope of 2%. This will allow water to drain to the road and decrease the danger of heaving or cracking. This important detail must be taken into account when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the builder prior to the start of the work: he is going to have the ability to provide materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of unwanted supports around the foundation is a fantastic method to avoid possible cracks and this asphalting done in chilly weather will be of poor quality. It's therefore better to wait for the sunny days to return before beginning work.

To avoid unpleasant surprises, then choose your contractor and make certain that the name and address of the company are composed on the contract. The beginning and end dates of the work, in addition to proof of the contractor's liability insurance and the technical details of the job to be carried out, should also be included. No contractor should require a deposit before work starts. To avoid the inconvenience that might cause unforeseen expenses, visit the AsphaltAvondale site. You may thus have the tools in hand to successfully finish your asphalt paving project.

Asphalt Avondale - Greatest Arizona in Arizona!

For caliber asphalting perform , call on Asphalt, Avondale professional team. We have over 20 years of experience in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to figure out the regions served.

Tar And Chip Paving Avondale | Parking Lot Repair And Striping Avondale
Home >> arizona/avondale >> asphalt
Share this...