Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Avondale, Arizona


Parking Lot Repair And Striping installed on an unstable surface could quickly lead to problems. There are three Chief options for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition rather than showing severe cracks or crumbling, hot asphalt mix can be placed directly within your driveway. 1 facet is height: make sure fences, garage flooring, and other constructions aren't jeopardized by the greater degree of this surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is completely removed (or you might not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed directly on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mix. Typically 6 to 8 inches of aggregate extends under 3 inches of asphalt.

The longer asphalt you operate, the more leeway you have. By way of example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional during this period, however, the time is constrained.

How much can an Parking Lot Repair And Striping price in Avondale?

Take into account the weather vagaries of our climate when deciding upon the quality of asphalt. The substantial temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it'll be good to tell the contractor should you own a recreational vehicle or a van. He might have to accommodate the asphalt mix in order to be more immune to the burden of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt used and the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The life of an asphalt paver may be up to 20 decades, when the best states are met. We are talking about a professional paving contractor, a great quality of asphalt as well as also an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly is dependent upon the standard of the placing. Really, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a thin foundation. However, the upkeep of the asphalt pavement is also a determining factor in its own longevity. That is to say, you will need to seal your drive once in 10 years, at a minimum, so as to maintain its great state.


We suggest that you inform your asphalting contractor if you decide to get your driveway asphalt in order to offer your property. It may not be essential to pay top dollar for placing asphalt , in such a circumstance.

Parking Lot Repair And Striping placing: price and contract

The choice of the asphalt laying contractor is essential. In order to not have unpleasant surprises, you'll have to choose it carefully.

Our guarantees and Parking Lot Repair And Striping work

Guarantee that the paving contractor has liability insurance. A trip to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has ever been the subject of complaints.

These details should be included in the arrangement:

- date of beginning and end of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to know that a paving builder cannot require that you make a deposit before work has started. But you should agree on the payment terms and be sure it's on the contract.

Prior to estimating the asphalt drive to your new residence by a builder, or obtaining some basic knowledge is imperative to guarantee that the job is well done. Know first that the lack of compaction and the inadequate depth of the foundation are the two main causes of the deformation or ripping of a layer of asphalt. If it's a new driveway, it must initially be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be set beneath the granular backfill if the soil proves to be somewhat loamy (clayey). If you have a new home, it is ideal to wait 6 to 12 months before paving your driveway, to allow the soil to settle . In the case of a fix of this entry, an easy replacement of the asphalt coating can be considered in the event the contractor believes that the existing base is sufficient. In both scenarios, foundation redone or base preserved, the whole period of its guarantee must be the same.

Parking Lot Repair And Striping Avondale Arizona

The weather conditions in our beautiful province may have a devastating effect on an asphalt drive, hence the importance of including a slope with a minimum slope of 2%. This will enable water to drain to the street and minimize the danger of heaving or cracking. This important detail must be taken into consideration when excavating and maintained during backfilling.

If you've got a van or recreational vehicle, notify the builder prior to the onset of the work: he is going to be able to supply materials so. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt layer should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the base should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also mention that the setup of unwanted supports around the base is a fantastic way to avoid possible cracks and this asphalting done in chilly weather is going to be of poor quality. It is therefore far better to wait for the bright days to return before starting work.

To avoid unpleasant surprises, choose your contractor and make sure that the title and address of his company are written on the contract. The beginning and end dates of the work, in addition to evidence of the contractor's liability insurance and the technical specifics of the project to be completed, should also be included. No contractor should require a deposit before work begins. To avoid the inconvenience that might cause unforeseen costs, visit the Parking Lot Repair And StripingAvondale site. You may thus have the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Avondale - Greatest Arizona at Arizona!

For quality asphalting work , call on Parking Lot Repair And Striping, Avondale specialist team. Confirm our Business department to figure out the regions served.

Asphalt Avondale | Concrete Maintenance Avondale
Home >> arizona/avondale >> parking lot repair and Striping
Share this...