Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt Coating in Buckeye, Arizona


Parking Lot Repair And Striping installed in an unstable surface can quickly lead to problems. There are 3 Chief options for the Simple installation:

  1. Paving Over Existing Driveway: If your current driveway is in good shape rather than revealing severe fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. One aspect is elevation: make certain fences, garage flooring, and other constructions aren't jeopardized by the greater degree of this new surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Remove the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mixture.

The longer asphalt you operate, the more leeway you have. By way of example, at 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also increases: 46 minutes. Generally, for lean asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to speak to your contractor. The hot mix is ​​still functional in this period of time, however, the time is constrained.

How much can an Parking Lot Repair And Striping cost in Buckeye?

Consider the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations we experience cause appreciable damage to asphalt work.

In addition, it will be good to tell the contractor if you have a recreational vehicle or a van. He will need to accommodate the asphalt mix in order to be more resistant to the burden of heavy vehicles.

The Benefits of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt employed and the paving contractor.

To get a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver may be around 20 years, when the very best conditions are met. We're referring to a professional paving builder, a good grade of asphalt and an optimal asphalt laying technique.

Parking Lot Repair And Striping in Buckeye: cost, quality of work and lifespan


The durability of residential asphalt paving chiefly depends upon the standard of the laying. Indeed, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction and a thin foundation. On the other hand, the maintenance of the asphalt pavement is also a determining factor in its longevity. That's to say, you'll need to seal your driveway once in ten decades, at a minimum, in order to keep its great condition.


We advise you to notify your asphalting builder if you decide to have your driveway asphalt in order to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Parking Lot Repair And Striping placing: price and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, then you'll need to choose it carefully.

Make sure the paving contractor has liability insurance coverage. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has become the subject of complaints.

The following details must be included in the arrangement:

- date of beginning and end of the work;

- proof of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to be aware that a paving builder cannot require you to make a down payment before work has started. But you should agree to the payment terms and make sure it is about the contract.

A strong base for Parking Lot Repair And Striping- Buckeye

Prior to estimating the asphalt driveway to your new home by a builder, or obtaining some fundamental knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the inadequate depth of the base are the two main causes of the deformation or tearing of a layer of asphalt. If it is a new driveway, it must initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane is going to be placed under the granular backfill if the soil turns out to be very loamy (clayey). If you have a new home, it is best to wait 6 to 12 months before paving your driveway, to enable the soil to settle naturally. In the case of a fix of this entry, an easy replacement of the asphalt coating can be considered in the event the contractor considers that the existing base is sufficient. In both scenarios, foundation redone or base maintained, the whole period of its warranty must be exactly the same.

Parking Lot Repair And Striping Buckeye Arizona

The weather conditions in our lovely state may have a devastating effect on an asphalt driveway, hence the importance of including a slope with a minimum slope of 2%. This will enable water to drain into the road and minimize the risk of heaving or cracking. This important detail must be taken into consideration when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder prior to the start of the work: he is going to be able to supply materials accordingly. Some asphalt combinations produce an asphalt that is more immune to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimum stability, the base should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the setup of side supports around the foundation is a good method to prevent potential cracks and this asphalting done in cold weather will be of inferior quality. It's therefore far better to wait for the bright days to go back before starting work.

To avoid unpleasant surprises, then choose your contractor and make sure the name and address of his company are composed about the contract. The beginning and finish dates of the job, as well as evidence of this contractor's liability insurance and also the technical details of the project to be completed, should also be included. No contractor should require a deposit before work starts. To prevent the inconvenience that might cause unforeseen costs, visit the Parking Lot Repair And StripingBuckeye website. You will thus have all the resources in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Buckeye - Greatest Arizona at Arizona!

For quality asphalting perform , call on Parking Lot Repair And Striping, Buckeye professional team. We've got more than 20 years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business department to figure out the regions served.

Asphalt Buckeye | Concrete Maintenance Buckeye
Home >> arizona/buckeye >> parking lot repair and Striping
Share this...