Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Tar And Chip Paving- Alternatives for the asphalt surface in Buckeye, Arizona


Tar And Chip Paving installed on an unstable surface could quickly lead to problems. There are three Chief options for the basic setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition rather than showing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 aspect is elevation: make certain fences, garage floors, and other constructions are not compromised by the greater level of the surface.
  2. Remove old driveway, peg to the ground: The existing driveway is completely removed (or you might not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is actually the preferred method. An aggregated stone floor partly replaces part of the hot asphalt mixture. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

Our Services:

The best time to install Tar And Chip Paving from Buckeye

The longer asphalt you work, the more leeway you might have. For example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to consult with your contractor. The hot mix remains practical during this period, but the time is constrained.

How much can an Tar And Chip Paving cost in Buckeye?

Take into account the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt work.

In addition, it'll be good to tell the contractor should you own a recreational vehicle or even a van. He will need to adapt the asphalt mix in order to be more immune to the weight of heavy vehicles.

The Benefits of Tar And Chip Paving

  • Smooth end;
  • non-slip
  • Simple to maintain
  • watertightness ensured
  • withstands the rigors of this Quebec climate quite well (provided it's been installed );
  • prevents the growth of moss;

It'll cost you between $ 3 and $11 per square foot; the price varies depending on the characteristic of the asphalt employed along with the paving contractor.

To get a sustainable Tar And Chip Paving

The life of an asphalt paver may be up to 20 years, when the best conditions are satisfied. We're referring to a professional paving contractor, a great grade of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving chiefly depends upon the standard of the placing. Really, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction plus a lean base. However, the upkeep of the asphalt pavement is also a determining factor in its own longevity. That is to say, you'll have to seal your driveway once in 10 decades, at a minimum, in order to maintain its great state.


We advise you to notify your asphalting contractor in case you choose to get your driveway asphalt in order to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Tar And Chip Paving placing: price and contract

The choice of the asphalt laying builder is essential. In order to not have unpleasant surprises, you will have to choose it carefully.

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has been the subject of complaints.

The following details must be included in the contract:

- date of beginning and finish of the work;

- proof of insurance;

- technical details;

- RBQ certification number.

You ought to be aware that a paving builder cannot demand you to make a down payment before work has started. However, you need to agree to the payment provisions and be sure it's on the contract.

Prior to estimating the asphalt driveway to your new residence by a builder, or acquiring some basic knowledge is imperative to guarantee that the job is done. Know first that the lack of compaction and the insufficient thickness of the base are the two main sources for the deformation or ripping of a coating of asphalt. When it's a new driveway, it must first be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be set under the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new home, it is best to wait 6 to 12 months before paving your driveway, to allow the dirt to settle naturally. In the event of a fix of this entry, an easy replacement of the asphalt coating can be considered in the event the contractor believes that the existing foundation is adequate. In both cases, foundation redone or foundation preserved, the duration of its warranty must be the same.

Tar And Chip Paving Buckeye Arizona

The weather conditions in our beautiful province may have a disastrous impact in an asphalt driveway, hence the importance of adding a slope having a minimum slope of 2%. This will enable water to drain to the road and minimize the risk of heaving or cracking. This significant detail has to be taken into consideration when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the builder before the onset of the work: he is going to be able to supply materials so. Some asphalt mixtures produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimal stability, the foundation should extend across the surface to be paved by about thirty centimeters (a dozen inches) on each side. Also mention that the setup of side supports around the base is a good way to avoid potential cracks and that asphalting done in cold weather will be of inferior quality. It's therefore far better to wait for the sunny days to go back before beginning work.

A Tar And Chip Paving contract with your builder in Buckeye

To avoid unpleasant surprises, choose your contractor and make certain that the title and address of his company are written on the contract. The start and end dates of this work, in addition to evidence of this builder's liability insurance and also the technical specifics of the job to be completed, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that could lead to unforeseen expenses, take a look at the Tar And Chip PavingBuckeye website. You will thus have the tools in hand to successfully finish your asphalt paving project.

Tar And Chip Paving Buckeye - Best Arizona at Arizona!

For quality asphalting work , phone on Tar And Chip Paving, Buckeye specialist team. Consult our Company department to find out the regions served.

Snow Removal Buckeye | Asphalt Buckeye
Home >> arizona/buckeye >> tar and chip paving
Share this...