Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Alternatives for the asphalt surface in Camp Verde, Arizona


Snow Removal installed in an unstable surface can quickly lead to problems. There are three Chief choices for the Simple setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape and not showing severe fractures or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is elevation: make sure fences, garage floors, and other structures aren't jeopardized by the greater level of the new surface.
  2. Remove old driveway, peg to the floor: The existing driveway is completely eliminated (or you may not have a driveway yet) and 4 to 6 inches of warm paving stone is put right on the ground.
  3. Eliminate the old driveway and fasten it into a solid surface. This is the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mix.

Our Services:

The best time to install Snow Removal from Camp Verde

The more asphalt you operate, the more leeway you might have. For instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. Generally, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains functional in this period of time, however, the time is constrained.

How much can an Snow Removal cost in Camp Verde?

Consider the weather vagaries of our climate when deciding upon the quality of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt work.

Furthermore, it will be useful to distinguish the contractor if you have a recreational vehicle or even a van. He will need to accommodate the asphalt mixture so as to be more resistant to the weight of heavy vehicles.

The advantages of Snow Removal

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt used and the paving contractor.

To get a sustainable Snow Removal

The existence of an asphalt paver can be around 20 years, when the best conditions are met. We are talking about a professional paving builder, a great grade of asphalt and also an optimal asphalt laying technique.

Snow Removal in Camp Verde: cost, quality of work and lifespan


The durability of residential asphalt paving largely is dependent on the quality of the laying. Really, the major causes of deformation or ripping of an asphalt layer are the absence of compaction and a thin foundation. However, the upkeep of the asphalt sidewalk can be a determining factor in its longevity. That is to say, you will need to seal your drive once in ten decades, at a minimum, so as to keep its good state.


We advise you to notify your asphalting builder if you decide to have your driveway asphalt so as to offer your property. It might not be necessary to pay top dollar for laying asphalt , in such a case.

Snow Removal laying: price and contract

The choice of the asphalt laying contractor is indispensable. In order not to have unpleasant surprises, then you will have to choose it carefully.

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has ever been the subject of complaints.

The following details should be included in the contract:

- date of start and finish of the work;

- proof of insurance;

- technical details;

- RBQ certification number.

You should know that a paving builder can't demand that you make a deposit before work has begun. However, you need to agree on the payment terms and be sure it is about the contract.

A strong foundation for Snow Removal- Camp Verde

Before redoing the asphalt drive to your new residence by a builder, or acquiring some fundamental knowledge is imperative to make sure the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. When it's a new driveway, it must first be excavated to make room for a coating of crushed stone of sufficient depth. A geotextile membrane is going to be set beneath the granular backfill if the dirt turns out to be very loamy (clayey). If you have a new home, it is ideal to wait 6 to 12 months prior to paving your drive, to allow the dirt to settle . In the case of a repair of the entrance, an easy replacement of the asphalt layer can be considered if the contractor considers that the existing base is adequate. In both scenarios, foundation redone or foundation preserved, the whole period of its guarantee must be exactly the same.

Snow Removal Camp Verde Arizona

The weather conditions in our beautiful province may have a devastating effect in an asphalt driveway, thus the significance of adding a slope having a minimum slope of 2%. This will enable water to drain to the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and maintained during backfilling.

In case you have a van or recreational vehicle, notify the builder before the start of the work: he will have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt layer should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of side supports around the base is a fantastic way to prevent potential cracks and that asphalting done in cold weather will be of inferior quality. It's therefore far better to wait for the sunny days to go back before beginning work.

A Snow Removal contract with your contractor in Camp Verde

To avoid unpleasant surprises, then select your contractor diligently and make certain that the name and address of his business are composed on the contract. The start and finish dates of the job, as well as evidence of this contractor's liability insurance and also the technical details of the project to be carried out, should also be included. No contractor should need a deposit before work begins. To prevent the inconvenience that could lead to unforeseen costs, visit the Snow RemovalCamp Verde website. You may thus have the resources in hand to successfully complete your asphalt paving project.

Snow Removal Camp Verde - Greatest Arizona in Arizona!

For quality asphalting work , call on Snow Removal, Camp Verde professional team. Confirm our Business section to find out the regions served.

Concrete Maintenance Camp Verde | Tar And Chip Paving Camp Verde
Home >> arizona/camp verde >> snow removal
Share this...