Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Snow Removal- Options for the asphalt Coating in Cottonwood, Arizona


Snow Removal installed in an unstable surface could quickly lead to difficulties. There are three Chief choices for the Simple setup:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not showing severe fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. 1 aspect is elevation: make certain fences, garage floors, and other constructions aren't compromised by the higher degree of this surface.
  2. Remove old driveway, counter into the floor: The existing driveway is totally eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed directly on the ground.
  3. Remove the old driveway and fasten it into a solid surface. This is actually the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mix.

Our Services:

The best time to install Snow Removal from Cottonwood

The longer asphalt you work, the more leeway you might have. For instance, in 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt thickness increases by 3 inches, the workability time also raises: 46 minutes. In general, for thin asphalt programs (about 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you ought to consult with your contractor. The hot mix is ​​still functional during this period, but the time is constrained.

How much does an Snow Removal cost in Cottonwood?

Consider the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations we experience cause considerable damage to asphalt work.

In addition, it will be good to distinguish the contractor should you own a recreational vehicle or even a van. He will need to adapt the asphalt mixture in order to be more immune to the burden of heavy vehicles.

The advantages of Snow Removal

A driveway paved with asphalt has several advantages:

It will cost you between $ 3 and $11 per square foot; the cost varies depending on the characteristic of the asphalt employed and the paving contractor.

For a sustainable Snow Removal

The existence of an asphalt paver may be around 20 decades, when the very best conditions are met. We're talking about a professional paving builder, a great quality of asphalt as well as an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly depends upon the standard of the placing. Really, the major causes of deformation or ripping of an asphalt coating are the lack of compaction and a thin foundation. On the other hand, the upkeep of the asphalt pavement is also a deciding factor in its own longevity. That's to say, you will need to seal your driveway once in 10 decades, at a minimum, in order to keep its great state.


We suggest that you notify your asphalting builder if you decide to have your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a case.

Snow Removal laying: cost and contract

The choice of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, then you will have to select it carefully.

Make sure the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has become the subject of complaints.

These details must be included in the arrangement:

- date of beginning and end of the work;

- evidence of insurance;

- technical particulars;

- RBQ accreditation number.

You ought to know that a paving builder can't demand that you make a deposit before work has started. But you need to agree on the payment provisions and be sure it is about the contract.

A strong foundation for Snow Removal- Cottonwood

Before redoing the asphalt driveway to your new residence by a builder, or acquiring some basic knowledge is vital to guarantee that the job is done. Know first that the lack of compaction and the insufficient thickness of the foundation are the two chief sources for the deformation or ripping of a layer of asphalt. When it is a new driveway, it has to initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be placed under the granular backfill if the dirt proves to be very loamy (clayey). If you have a new home, it's best to wait 6 to 12 months prior to paving your driveway, to enable the dirt to settle naturally. In the event of a fix of the entry, an easy replacement of the asphalt coating can be considered in the event the contractor considers that the existing foundation is adequate. In both cases, base redone or base preserved, the whole period of its warranty has to be the same.

Snow Removal Cottonwood Arizona

The weather conditions in our beautiful province can have a disastrous impact on an asphalt drive, hence the importance of adding a slope with a minimum slope of 2%. This will enable water to drain to the road and decrease the risk of heaving or cracking. This important detail has to be taken into consideration when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the contractor prior to the onset of the job: he is going to be able to supply materials so. Some asphalt combinations produce an asphalt which is more resistant to heavy duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the base should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the base is a fantastic method to prevent potential cracks and that asphalting done in cold weather will be of poor quality. It's therefore better to await the bright days to go back before beginning work.

A Snow Removal contract with your contractor in Cottonwood

To avoid unpleasant surprises, select your contractor diligently and be certain that the title and address of his business are written about the contract. The beginning and end dates of the job, in addition to evidence of the builder's liability insurance and the technical specifics of the project to be completed, should also be included. No contractor should require a down payment before work starts. To prevent the inconvenience that could lead to unforeseen expenses, visit the Snow RemovalCottonwood site. You may thus have the tools in hand to successfully finish your asphalt paving project.

Snow Removal Cottonwood - Best Arizona in Arizona!

For caliber asphalting perform , call on Snow Removal, Cottonwood specialist team. We have over twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Consult our Company section to figure out the regions served.

Concrete Maintenance Cottonwood | Tar And Chip Paving Cottonwood
Home >> arizona/cottonwood >> snow removal
Share this...