Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Options for the asphalt Coating in Douglas, Arizona


Asphalt installed on an unstable surface can quickly lead to problems. There are three main options for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good condition and not revealing severe cracks or crumbling, hot asphalt mix can be laid directly over your driveway. One aspect is height: make sure fences, garage floors, and other constructions aren't compromised by the higher level of this surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is totally eliminated (or you may not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put right on the ground.
  3. Remove the old driveway and secure it into a solid surface. This is the preferred method. An aggregated stone flooring partially replaces part of this hot asphalt mix. Typically 6 to 8 inches of limestone goes under 3 inches of asphalt.

The more asphalt you operate, the more leeway you have. By way of instance, in 40 F, the crews only have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for lean asphalt applications (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, you'll need to consult with your contractor. The hot mix remains functional in this period of time, however, the time is limited.

How much does an Asphalt price in Douglas?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations that we experience cause considerable damage to asphalt perform.

In addition, it will be useful to distinguish the contractor should you own a recreational vehicle or even a van. He will need to adapt the asphalt mixture so as to be more immune to the weight of heavy vehicles.

The advantages of Asphalt

A driveway paved with asphalt has several benefits:

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt used and the paving contractor.

To get a sustainable Asphalt

The existence of an asphalt paver can be around 20 decades, when the best states are satisfied. We are talking about a professional paving contractor, a great quality of asphalt as well as also an optimal asphalt laying technique.

Asphalt in Douglas: price, quality of work and lifespan


The durability of residential asphalt paving chiefly is dependent on the quality of the placing. Really, the major causes of deformation or tearing of an asphalt coating are the absence of compaction plus a lean base. However, the upkeep of the asphalt sidewalk is also a deciding factor in its longevity. That's to say, you'll have to seal your drive once in ten decades, at a minimum, in order to keep its good state.


We advise you to inform your asphalting contractor if you decide to get your driveway asphalt in order to offer your property. It may not be essential to pay top dollar for laying asphalt , in this circumstance.

Asphalt laying: price and contract

The choice of the asphalt laying builder is indispensable. In order to not have unpleasant surprises, then you will have to select it carefully.

Make sure the paving contractor has liability insurance. A visit to the website of the Office for Consumer Protection (OPC) will make it possible for you to confirm whether an entrepreneur has become the subject of complaints.

The following details should be included in the arrangement:

- date of start and end of the work;

- proof of insurance;

- technical particulars;

- RBQ certification number.

You should be aware that a paving builder cannot require you to make a down payment before work has begun. But you need to agree to the payment provisions and be sure it is on the contract.

Before redoing the asphalt drive to your new home by a contractor, or obtaining some basic knowledge is imperative to guarantee that the job is well done. Know first that the absence of compaction and the inadequate depth of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. When it's a new driveway, then it has to initially be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane will be set beneath the granular backfill if the soil turns out to be somewhat loamy (clayey). If you have a new house, it's best to wait for 6 to 12 months before paving your drive, to allow the dirt to settle naturally. In the event of a repair of this entry, a simple replacement of the asphalt coating can be considered if the contractor considers that the existing base is adequate. In both scenarios, foundation redone or base preserved, the whole period of its guarantee must be exactly the same.

Asphalt Douglas Arizona

The weather conditions in our lovely state can have a disastrous impact in an asphalt drive, hence the significance of adding a slope having a minimum slope of 2%. This will enable water to drain to the road and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the contractor prior to the onset of the work: he is going to be able to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 in) so as to accomplish a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also note that the installation of unwanted supports around the foundation is a fantastic way to avoid possible cracks and this asphalting done in chilly weather will be of inferior quality. It's therefore far better to await the sunny days to return before beginning work.

To avoid unpleasant surprises, then choose your contractor and be certain that the name and address of the business are written about the contract. The start and end dates of the work, in addition to proof of the contractor's liability insurance and also the technical details of this project to be carried out, should also be included. No contractor should need a down payment before work begins. To prevent the inconvenience that could lead to unforeseen costs, visit the AsphaltDouglas site. You will thus have the tools in hand to successfully finish your asphalt paving project.

Asphalt Douglas - Best Arizona in Arizona!

For quality asphalting work , call on Asphalt, Douglas specialist team. We have more than twenty years of experience in asphalt laying, resurfacing, maintenance and repair. Consult our Business department to figure out the regions served.

Tar And Chip Paving Douglas | Parking Lot Repair And Striping Douglas
Home >> arizona/douglas >> asphalt
Share this...