Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Alternatives for the asphalt Coating in Douglas, Arizona


Parking Lot Repair And Striping installed on an unstable surface can quickly lead to problems. There are 3 Chief options for the basic setup:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than revealing serious fractures or crumbling, hot asphalt mixture can be placed directly within your driveway. One aspect is elevation: make sure fences, garage flooring, and other structures are not compromised by the higher degree of this surface.
  2. Eliminate old driveway, counter into the ground: The present driveway is totally eliminated (or you might not have a driveway yet) and 4 to 6 inches of hot paving stone is placed right on the ground.
  3. Eliminate the old driveway and fasten it into a solid surface. This is the preferred method. An aggregated stone flooring partly replaces part of the hot asphalt mix.

The more asphalt you work, the more leeway you might have. For example, at 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. Generally, for lean asphalt programs (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or even higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix is ​​still practical during this period of time, however, the time is limited.

How much does an Parking Lot Repair And Striping cost in Douglas?

Take into account the weather vagaries of the climate when deciding upon the standard of asphalt. The significant temperature variations we experience cause appreciable damage to asphalt perform.

In addition, it will be useful to tell the contractor if you have a recreational vehicle or even a van. He might have to accommodate the asphalt mix so as to be more resistant to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt used along with the paving contractor.

For a sustainable Parking Lot Repair And Striping

The life of an asphalt paver can be up to 20 decades, when the very best states are satisfied. We're referring to a professional paving contractor, a great grade of asphalt as well as an optimal asphalt laying technique.


The longevity of residential asphalt paving largely depends upon the quality of the laying. Indeed, the significant causes of deformation or ripping of an asphalt coating are the lack of compaction plus a lean base. However, the maintenance of the asphalt pavement is also a determining factor in its own longevity. That's to say, you will need to seal your drive once in 10 decades, at a minimum, so as to keep its great state.


We suggest that you inform your asphalting contractor if you decide to get your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for placing asphalt , in such a circumstance.

Parking Lot Repair And Striping placing: price and contract

The choice of the asphalt laying builder is essential. In order not to have unpleasant surprises, then you will need to choose it carefully.

Guarantee that the paving contractor has liability insurance coverage. A visit to the web site of the Office for Consumer Protection (OPC) will allow you to verify whether an entrepreneur has become the subject of complaints.

These details should be included in the contract:

- date of start and finish of the job;

- evidence of insurance;

- technical particulars;

- RBQ certification number.

You ought to know that a paving contractor can't demand you to make a down payment before work has started. However, you should agree to the payment terms and make sure it's about the contract.

Before redoing the asphalt drive to your new residence by a contractor, or obtaining some fundamental knowledge is imperative to make sure the job is done. Know first that the absence of compaction and the insufficient thickness of the base are the two main sources for the deformation or ripping of a coating of asphalt. If it's a new driveway, then it must first be excavated to make room for a layer of crushed stone of sufficient depth. A geotextile membrane is going to be placed beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you own a new house, it's best to wait 6 to 12 months before paving your drive, to allow the soil to settle naturally. In the event of a repair of the entrance, a simple replacement of the asphalt coating can be considered in the event the contractor believes that the existing foundation is adequate. In both scenarios, base redone or foundation maintained, the duration of its warranty must be exactly the same.

Parking Lot Repair And Striping Douglas Arizona

The weather conditions in our lovely state may have a disastrous impact on an asphalt driveway, thus the significance of adding a slope with a minimum slope of 2%. This will enable water to drain into the street and decrease the risk of heaving or cracking. This important detail must be taken into consideration when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder before the onset of the work: he is going to be able to provide materials so. Some asphalt mixtures produce an asphalt which is more immune to heavy duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to reach a thickness of at least 5 cm (2 in) after being compacted. For optimum stability, the foundation should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also note that the setup of side supports around the base is a fantastic method to prevent possible cracks and this asphalting done in chilly weather will be of poor quality. It's therefore better to await the sunny days to return before beginning work.

To avoid unpleasant surprises, select your contractor and make sure the title and address of his company are written about the contract. The start and end dates of the work, in addition to evidence of the contractor's liability insurance and the technical details of the job to be carried out, should also be included. No contractor should need a deposit before work starts. To avoid the inconvenience that might cause unforeseen costs, take a look at the Parking Lot Repair And StripingDouglas site. You may thus have all the tools in hand to successfully finish your asphalt paving project.

Parking Lot Repair And Striping Douglas - Best Arizona in Arizona!

For caliber asphalting work , call on Parking Lot Repair And Striping, Douglas specialist team. We have more than 20 years of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Business section to find out the regions served.

Asphalt Douglas | Concrete Maintenance Douglas
Home >> arizona/douglas >> parking lot repair and Striping
Share this...