Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Asphalt- Alternatives for the asphalt surface in Flowing Wells, Arizona


Asphalt installed in an unstable surface can quickly lead to problems. There are 3 main choices for the basic installation:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not showing serious fractures or crumbling, hot asphalt mix can be placed directly within your driveway. One facet is elevation: make certain fences, garage floors, and other structures are not compromised by the greater level of this new surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is totally removed (or you might not have a driveway yet) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Eliminate the old driveway and secure it into a solid surface. This is the preferred method. An aggregated stone floor partially replaces part of the hot asphalt mixture.

Our Services:

The best time to install Asphalt in Flowing Wells

The longer asphalt you operate, the more leeway you have. By way of instance, at 40 F, the crews just have 16 minutes to work on 1 1/2 inch thick asphalt. As the asphalt depth increases by 3 inches, the workability time also raises: 46 minutes. In general, for lean asphalt programs (about 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you'll need to speak to your contractor. The hot mix is ​​still practical in this period of time, however, the time is limited.

How much can an Asphalt price in Flowing Wells?

Take into account the weather vagaries of the climate when choosing the standard of asphalt. The substantial temperature variations we experience cause considerable damage to asphalt perform.

Furthermore, it'll be useful to distinguish the contractor if you have a recreational vehicle or a van. He will need to adapt the asphalt mixture in order to be more immune to the weight of heavy vehicles.

The advantages of Asphalt

  • Smooth finish;
  • non invasive
  • easy to maintain
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate very well (provided it has been installed optimally);
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the quality of the asphalt employed along with the paving contractor.

To get a sustainable Asphalt

The existence of an asphalt paver can be up to 20 years, when the very best states are met. We're talking about a professional paving builder, a great grade of asphalt as well as an optimal asphalt laying technique.


The durability of residential asphalt paving chiefly depends upon the quality of the laying. Really, the significant causes of deformation or ripping of an asphalt layer are the lack of compaction and a thin foundation. However, the upkeep of the asphalt sidewalk can be a deciding factor in its own longevity. That is to say, you will need to seal your driveway once in 10 decades, at a minimum, in order to maintain its great condition.


We suggest that you inform your asphalting contractor in case you choose to have your driveway asphalt so as to sell your property. It may not be essential to pay top dollar for laying asphalt , in such a case.

Asphalt placing: cost and contract

The option of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, then you'll have to select it carefully.

Our guarantees and Asphalt work

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has become the subject of complaints.

The following details should be included in the contract:

- date of beginning and finish of the work;

- evidence of insurance;

- technical details;

- RBQ accreditation number.

You ought to know that a paving builder cannot require that you make a down payment before work has begun. But you need to agree on the payment terms and be sure it's on the contract.

A solid foundation for Asphalt- Flowing Wells

Before redoing the asphalt drive to your new home by a builder, or obtaining some fundamental knowledge is vital to guarantee that the job is well done. Know first that the lack of compaction and the inadequate depth of the foundation are the two main sources for the deformation or ripping of a layer of asphalt. When it is a new driveway, then it has to initially be excavated to make room for a coating of crushed stone of adequate depth. A geotextile membrane will be placed under the granular backfill if the soil proves to be very loamy (clayey). If you have a new home, it is ideal to wait for 6 to 12 months prior to paving your drive, to allow the dirt to settle . In the event of a repair of the entrance, a simple replacement of the asphalt layer can be considered in the event the contractor believes that the existing foundation is adequate. In both scenarios, base redone or base preserved, the duration of its warranty must be exactly the same.

Asphalt Flowing Wells Arizona

The weather conditions in our beautiful province may have a disastrous impact in an asphalt driveway, hence the importance of including a slope having a minimum slope of 2%. This will allow water to drain into the street and minimize the danger of heaving or cracking. This important detail has to be taken into account when excavating and preserved during backfilling.

If you have a van or recreational vehicle, notify the builder before the start of the job: he is going to have the ability to supply materials accordingly. Some asphalt mixtures produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 in) in order to reach a thickness of at least 5 cm (2 in) after being compacted. For optimal stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a couple inches) on each side. Also note that the installation of side supports around the base is a fantastic way to avoid potential cracks and that asphalting done in cold weather is going to be of poor quality. It's therefore far better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, then choose your contractor diligently and be sure the name and address of his business are composed about the contract. The beginning and finish dates of this job, in addition to proof of the builder's liability insurance and also the technical specifics of the job to be completed, should also be included. No contractor should need a down payment before work starts. To avoid the inconvenience that could cause unforeseen costs, visit the AsphaltFlowing Wells site. You will thus have the resources in hand to successfully complete your asphalt paving project.

Asphalt Flowing Wells - Best Arizona at Arizona!

For caliber asphalting perform , call on Asphalt, Flowing Wells professional team. We've got over twenty decades of expertise in asphalt laying, resurfacing, maintenance and repair. Confirm our Company section to find out the regions served.

Tar And Chip Paving Flowing Wells | Parking Lot Repair And Striping Flowing Wells
Home >> arizona/flowing wells >> asphalt
Share this...