Easy and Trusted Asphalt

Call Us Today: 1240.226.2848

Parking Lot Repair And Striping- Options for the asphalt Coating in Flowing Wells, Arizona


Parking Lot Repair And Striping installed in an unstable surface could quickly lead to problems. There are three Chief choices for the Simple installation:

  1. Paving Over Existing Driveway: If your current driveway is in good condition and not showing severe fractures or crumbling, hot asphalt mixture can be laid directly over your driveway. One aspect is height: make sure fences, garage floors, and other constructions are not jeopardized by the greater degree of the new surface.
  2. Eliminate old driveway, counter into the floor: The existing driveway is totally eliminated (or you might not have a driveway nonetheless ) and 4 to 6 inches of hot paving stone is put directly on the ground.
  3. Remove the old driveway and fasten it to a good surface. This is the preferred method. An aggregated stone floor partly replaces part of this hot asphalt mixture. Typically 6 to 8 inches of aggregate goes under 3 inches of asphalt.

The longer asphalt you operate, the more leeway you have. For instance, in 40 F, the crews just have 16 minutes to operate on 1 1/2 inch thick asphalt. In general, for thin asphalt programs (approximately 1.5 cm), you need to wait until temperatures are 21 ° C or higher. Between 50 and 60 F, then you ought to consult with your contractor. The hot mix is ​​still functional during this period of time, however, the time is constrained.

How much can an Parking Lot Repair And Striping price in Flowing Wells?

Take into account the weather vagaries of our climate when choosing the quality of asphalt. The significant temperature variations that we experience cause appreciable damage to asphalt perform.

In addition, it'll be good to distinguish the contractor should you have a recreational vehicle or even a van. He might have to accommodate the asphalt mixture so as to be more immune to the burden of heavy vehicles.

The advantages of Parking Lot Repair And Striping

A driveway paved with asphalt has several benefits:

It'll cost you between $ 3 and $11 per square foot; the cost fluctuates based on the quality of the asphalt employed and the paving contractor.

For a sustainable Parking Lot Repair And Striping

The existence of an asphalt paver may be up to 20 decades, when the very best states are satisfied. We're referring to a professional paving contractor, a great quality of asphalt and also an optimal asphalt laying technique.

Parking Lot Repair And Striping in Flowing Wells: price, quality of work and lifespan


The longevity of residential asphalt paving largely is dependent upon the quality of the placing. Really, the major causes of deformation or ripping of an asphalt coating are the lack of compaction and a lean base. However, the maintenance of the asphalt pavement is also a deciding factor in its longevity. That's to say, you will need to seal your driveway once in 10 years, at a minimum, so as to keep its great condition.


We advise you to notify your asphalting contractor in case you decide to have your driveway asphalt in order to offer your property. It may not be essential to pay top dollar for laying asphalt , in such a circumstance.

Parking Lot Repair And Striping laying: price and contract

The option of the asphalt laying builder is indispensable. In order not to have unpleasant surprises, you will need to select it carefully.

Make sure the paving contractor has liability insurance coverage. A trip to the website of the Office for Consumer Protection (OPC) will allow you to confirm whether an entrepreneur has been the subject of complaints.

These details should be included in the arrangement:

- date of start and finish of the job;

- evidence of insurance;

- technical details;

- RBQ certification number.

You should be aware that a paving contractor cannot demand you to make a deposit before work has begun. However, you need to agree on the payment terms and make sure it's about the contract.

A solid base for Parking Lot Repair And Striping- Flowing Wells

Before redoing the asphalt drive to your new home by a builder, or acquiring some basic knowledge is imperative to make sure the job is done. Know first that the lack of compaction and the insufficient depth of the base are the two chief causes of the deformation or ripping of a coating of asphalt. When it is a new driveway, then it has to first be excavated to make room for a layer of crushed stone of adequate thickness. A geotextile membrane is going to be placed under the granular backfill if the dirt turns out to be somewhat loamy (clayey). If you own a new home, it is best to wait 6 to 12 months before paving your driveway, to allow the soil to settle naturally. In the event of a fix of this entry, a simple replacement of the asphalt layer can be considered if the contractor believes that the present base is adequate. In both scenarios, base redone or base preserved, the duration of its guarantee must be the same.

Parking Lot Repair And Striping Flowing Wells Arizona

The weather conditions in our beautiful province may have a devastating effect on an asphalt drive, thus the importance of adding a slope having a minimum slope of 2%. This will enable water to drain into the road and minimize the danger of heaving or cracking. This important detail must be taken into consideration when excavating and preserved during backfilling.

In case you have a van or recreational vehicle, notify the contractor before the start of the job: he will have the ability to provide materials so. Some asphalt combinations produce an asphalt which is more resistant to heavy-duty vehicles.

The asphalt coating should have an initial thickness of 6.35 to 7.6 cm (2.5 to 3 ) so as to accomplish a thickness of at least 5 cm (2 ) after being compacted. For optimum stability, the foundation should extend over the surface to be paved by roughly thirty centimeters (a dozen inches) on each side. Also mention that the installation of side supports around the foundation is a fantastic way to prevent potential cracks and this asphalting done in chilly weather will be of poor quality. It is therefore better to wait for the bright days to return before starting work.

A Parking Lot Repair And Striping contract with your builder in Flowing Wells

To avoid unpleasant surprises, then select your contractor and be sure that the title and address of the company are written on the contract. The beginning and end dates of this work, as well as evidence of this builder's liability insurance and also the technical details of this project to be completed, should also be included. No contractor should need a deposit before work starts. To prevent the inconvenience that could lead to unforeseen expenses, take a look at the Parking Lot Repair And StripingFlowing Wells website. You may thus have the resources in hand to successfully complete your asphalt paving project.

Parking Lot Repair And Striping Flowing Wells - Best Arizona in Arizona!

For quality asphalting perform , call on Parking Lot Repair And Striping, Flowing Wells specialist team. Consult our Business department to find out the regions served.

Asphalt Flowing Wells | Concrete Maintenance Flowing Wells
Home >> arizona/flowing wells >> parking lot repair and Striping
Share this...