Asphalt- Alternatives for the asphalt surface in Fort Mohave, Arizona


Asphalt installed on an unstable surface could quickly lead to difficulties. There are three main options for the basic installation:

  1. Paving Over Existing Driveway: If your existing driveway is in good shape rather than showing severe cracks or crumbling, hot asphalt mix can be laid directly over your driveway. One facet is elevation: make certain fences, garage flooring, and other structures aren't compromised by the higher level of this new surface.
  2. Eliminate old driveway, peg to the floor: The present driveway is totally removed (or you may not have a driveway nonetheless ) and 4 to 6 inches of warm paving stone is placed right on the ground.
  3. Eliminate the old driveway and fasten it into a good surface. This is the preferred method. An aggregated stone floor partially replaces part of this hot asphalt mixture. Typically 6 to 8 inches of aggregate goes under 3 inches of asphalt.

Our Services:

The best time to install Asphalt from Fort Mohave

The more asphalt you work, the more leeway you have. For instance, in 40 F, the crews only have 16 minutes to work on 1 1/2 inch thick asphalt. In general, for lean asphalt applications (approximately 1.5 cm), you should wait until temperatures are 21 ° C or higher. Between 50 and 60 F, you'll need to speak to your contractor. The hot mix is ​​still practical in this period of time, however, the time is limited.

How much can an Asphalt price in Fort Mohave?

Take into account the weather vagaries of our climate when deciding upon the standard of asphalt. The significant temperature variations we experience cause considerable damage to asphalt work.

Furthermore, it will be useful to distinguish the contractor if you have a recreational vehicle or even a van. He will need to adapt the asphalt mix so as to be more resistant to the burden of heavy vehicles.

The Benefits of Asphalt

  • Smooth end;
  • non invasive
  • easy to Keep
  • watertightness guaranteed
  • withstands the rigors of this Quebec climate quite well (provided it's been set up );
  • prevents the growth of moss;

It will cost you between $ 3 and $11 per square foot; the price fluctuates based on the characteristic of the asphalt employed and the paving contractor.

For a sustainable Asphalt

The existence of an asphalt paver can be around 20 years, when the best states are met. We are talking about a professional paving builder, a great quality of asphalt and an optimal asphalt laying technique.


The longevity of residential asphalt paving largely is dependent upon the quality of the placing. Really, the significant causes of deformation or ripping of an asphalt layer are the absence of compaction and a thin foundation. However, the upkeep of the asphalt pavement can be a deciding factor in its own longevity. That is to say, you'll have to seal your driveway once in 10 years, at a minimum, so as to keep its great state.


We advise you to inform your asphalting contractor in case you decide to have your driveway asphalt so as to offer your property. It might not be essential to pay top dollar for laying asphalt , in such a circumstance.

Asphalt laying: price and contract

The option of the asphalt laying contractor is essential. In order to not have unpleasant surprises, you will have to select it carefully.

Guarantee that the paving contractor has liability insurance. A trip to the web site of the Office for Consumer Protection (OPC) will make it possible for you to verify whether an entrepreneur has ever been the subject of complaints.

These details must be included in the contract:

- date of start and end of the job;

- proof of insurance;

- technical details;

- RBQ certification number.

You ought to know that a paving contractor can't require that you make a deposit before work has started. However, you need to agree to the payment provisions and make sure it is about the contract.

Prior to estimating the asphalt drive to your new residence by a contractor, or obtaining some basic knowledge is imperative to make sure the job is well done. Know first that the lack of compaction and the insufficient thickness of the base are the two main causes of the deformation or tearing of a layer of asphalt. When it is a new driveway, then it has to initially be excavated to make room for a coating of crushed stone of adequate thickness. A geotextile membrane is going to be set beneath the granular backfill if the dirt proves to be somewhat loamy (clayey). If you have a new house, it's best to wait 6 to 12 months prior to paving your drive, to allow the soil to settle . In the case of a repair of this entrance, a simple replacement of the asphalt coating can be considered in the event the contractor considers that the existing foundation is sufficient. In both scenarios, foundation redone or foundation preserved, the whole period of its guarantee must be exactly the same.

Asphalt Fort Mohave Arizona

The weather conditions in our beautiful province can have a devastating effect on an asphalt driveway, thus the significance of including a slope with a minimum slope of 2%. This will enable water to drain into the street and decrease the danger of heaving or cracking. This significant detail must be taken into account when excavating and preserved during backfilling.

If you've got a van or recreational vehicle, notify the contractor before the start of the work: he is going to be able to supply materials accordingly. Some asphalt combinations produce an asphalt which is more immune to heavy-duty vehicles.

The asphalt coating should have a first thickness of 6.35 to 7.6 cm (2.5 to 3 ) in order to accomplish a thickness of 5 cm (2 in) after being compacted. For optimal stability, the base should extend across the surface to be paved by about thirty centimeters (a couple inches) on each side. Also mention that the setup of side supports around the foundation is a fantastic method to prevent possible cracks and that asphalting done in cold weather is going to be of poor quality. It's therefore better to wait for the sunny days to go back before starting work.

To avoid unpleasant surprises, select your contractor and be certain the name and address of the company are written about the contract. The start and end dates of this work, in addition to evidence of this contractor's liability insurance and the technical specifics of the job to be carried out, should also be included. No contractor should require a deposit before work starts. To prevent the inconvenience that might cause unforeseen expenses, visit the AsphaltFort Mohave website. You may thus have the resources in hand to successfully finish your asphalt paving project.

Asphalt Fort Mohave - Greatest Arizona in Arizona!

For quality asphalting perform , phone on Asphalt, Fort Mohave specialist team. Confirm our Company section to figure out the regions served.